30-min call with RobBook a proof-of-concept call
Commercial and industrial electrical

// For electrical contractors

AI for electrical contractors, tested first on Division 26 submittals.

For commercial and industrial electrical contractors, the first job to test is submittal packages: cut sheets pulled and marked for each spec section, checked against what the section requires, with deviations flagged for your project manager. It runs as a free AI proof of concept on 20 to 30 packages from finished jobs, with no login to any of your systems.

Book a proof-of-concept call30 minutes with Rob
Electrical proof of conceptAgreed before day one
First job
Submittal packages by spec section
You send
20 to 30 past packages and their returns
We touch
No system of yours
Reviewer
Your PM or project engineer, named by the owner
Left out
Certified payroll
Price
Range first, fixed price before signing

// Why submittals first

Every past package came back with the engineer's answer

The product sections of Division 26 typically ask for product data for each type of product they cover, from conductors and raceways to panelboards, wiring devices and lighting. Where your contract includes low-voltage cabling, fire alarm or security, Divisions 27 and 28 add their own. Each product section makes its own package, so one or two finished jobs can supply most of a 20 to 30 package test, and every one of them already came back marked by the engineer, in words such as reviewed, reviewed as noted, or revise and resubmit. Those marks are the answer key.

A package that comes back wrong costs more than a resubmittal. Under a common MasterSpec version of Section 01 33 00, Submittal Procedures, work covered by a package marked revise and resubmit can't proceed, and that explicitly includes purchasing, fabrication and delivery. Gear and lighting orders wait on the return. The check that happens before your stamp goes on the package is the work this test measures.

Change order pricing makes a strong second job rather than a first. It puts a number in front of your GC, so the first test should be one where a miss costs a resubmittal, not margin. The spec reading that submittals prove out carries straight into pricing.

The test doesn't depend on where your submittal log lives. Procore's Submittal Builder can generate a register from vector PDF spec sections, and Autodesk's AutoSpecs, built on Pype, does the same for Autodesk Build. Those tools list what is due by section; the package behind each line is what this test covers. Older owner standards that still call electrical work Division 16, from before MasterFormat 2004 split it into Divisions 26, 27 and 28, work the same way.

// How it runs

From past packages to one live job

  1. Step 01

    The proof of concept

    After the NDA, you send copies of 20 to 30 packages from finished jobs, with the reviewed returns and the spec sections behind them. Nothing connects to Procore, Autodesk Build, Accubid or McCormick. If project manuals can't leave the office, we build look-alikes with you.

  2. Step 02

    Your reviewer makes the call

    Before day one the owner names the reviewer and the success criteria go in writing, along with a price range for the live job. The reviewer then sets our packages beside the ones your team sent and the engineer's marks.

  3. Step 03

    About 30 days live, after a yes

    New packages on your open jobs for about 30 days. Your PM approves each one before it goes to the GC. Then the next job, such as change order pricing, quoted on its own.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

We give the range on the call, after hearing how many jobs you run at once and how many packages a job usually needs.

// Questions

Questions from electrical contractors

Do you need access to Procore, Autodesk Build, Accubid or McCormick?
No. The proof of concept works from copies of past packages and the spec sections behind them. Your systems come in only during a live run after a yes, with a person approving every package.
Our scope includes fire alarm and low-voltage cabling. Can those be in the test?
Yes. That work sits in Divisions 28 and 27 and follows the same submittal procedures as Division 26. Mix those packages in if your team builds them, and the success criteria will cover them too.
Will the AI approve an equal or a substitution?
No. Whether another product is acceptable is the architect's or engineer's decision, and whether to ask is your PM's. The draft shows where a product differs from the spec and which paragraph it touches, and stops there.
Do you handle certified payroll?
No. Prevailing-wage reports list each of your electricians by name with hours and pay, so they stay with your payroll staff and never come to us, on this job or any later one.
Who decides whether the test passed?
The reviewer the owner names before it starts, usually the PM or project engineer who builds packages today. Their comparison with what your team sent, and with the engineer's marks, decides it.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring two finished jobs' submittals.

30 minutes with Rob. You'll be asked for your company and role, the job you want tested, and roughly how many submittal packages a typical job needs. Please keep project documents back until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.