30-min call with RobBook a proof-of-concept call
Job 02 · Change orders

// Electrical contractors · A next job

Change orders priced from your own labor units, for your estimator to check.

Change order pricing for electrical contractors, tested as a free AI proof of concept on 20 to 30 changes your team already priced. Each draft starts from the document that caused the change, and your reviewer compares it line by line with the request your team sent and with what the GC accepted.

Book a proof-of-concept call30 minutes with Rob
Past changes
20 to 30
Labor units
Yours only
Prices sent to a GC
None

// The one job

A bulletin arrives. A priced draft waits for your estimator.

An RFI answer moves a feeder, a bulletin reissues four sheets with clouded revisions, or the GC sends a proposal request. Your estimator or PM works out what was added and what was deleted, takes off the material, applies labor units, prices it, adds the markups the subcontract allows, and writes the request with its scope, exclusions and time.

In the proof of concept, AI works from the same documents your team had and drafts each change order: the adds and deletes sheet by sheet, a material list, labor hours from your own units, and the markups your contract permits. Nothing goes to the GC.

Revised sheetBulletin or RFI answer
Bulletin no.
Sheets reissued
Clouded changes
RFI ref.
ItemAdd / deleteQty.
Illustration, not your drawings
Priced
for review
Change order requestDraft
Scope
Labor hours
Markups
Time
MaterialLabor unitsExtended
Illustration, not a real request

// Where it gets hard

What a change order price has to survive

First, work out what kind of paper it is. On AIA documents, an RFI answer on G716 authorizes no added cost or time by itself. An Architect's Supplemental Instructions on G710 says the work is done without change in contract sum or time, and proceeding counts as accepting that; under A201-2017, Section 7.4, a contractor who sees cost in a minor change must give notice and hold off, or it waives the adjustment. A proposal request on G709 asks for a price and changes nothing yet. A construction change directive on G714 has to be carried out promptly while the price is still open. The draft sorts each document first, so an ASI with cost in it reaches your PM before the crew starts.

Deletions get the same care as adds. Under A201-2017, Section 7.3.8, a net decrease is credited at actual net cost, and when one change both adds and deletes related work, overhead and profit apply only to the net increase. Deleted material is worth what can actually go back: cut wire is generally a final sale, special-order gear is often non-cancelable, and standard stock can carry a restocking charge. The draft lists every deleted item and asks whether it was bought, cut or released, for your estimator to answer.

Labor comes from your units, never from the AI. NECA's Manual of Labor Units, now in its 2025-2027 edition, gives units in three columns, normal, difficult and very difficult, and estimators factor them for conditions: half-inch EMT run 40 feet up in metal joists doesn't take the hours the same pipe takes in a stud wall. Shops that keep their own units price from their estimating database instead; Accubid ChangeOrder works from the same database as Accubid Classic, and McCormick prices changes from the same database and assemblies as the original bid. The draft uses the column and factors your estimator used, and an item your units don't cover is flagged, never filled in.

Rates and markups follow the contract you signed. Owners write their own pricing rules into project manuals. One university's change order guidelines, for example, price labor at straight time with the overtime premium on its own line, list each fringe separately, allow material only at actual cost after discounts and rebates, count hand tools and home-office estimating as overhead inside the markup, and set a smaller markup on work a contractor's subs perform than on its own. The draft follows the schedule in your subcontract and its flow-down clauses, with each markup on its own line.

What your reviewer will watch: the column and factors on every labor line, deletions credited, the date on each wire and gear quote, markups that match the contract, and time asked for where a change touches long-lead gear. Cumulative impact, the productivity lost when many changes land on one job, is a separate claim with its own body of research, some of it funded by ELECTRI International, the foundation NECA started in 1989. It stays with your PM and counsel.

// What you send

What the test needs from your estimator

Settled changes
Copies and exports
01

20 to 30 priced changes

Change order requests your team sent, each with the GC's answer, whether accepted, cut or rejected, and the executed change order where there is one.

02

The documents behind them

The RFI answers, ASIs, bulletins and reissued sheets, proposal requests and directives that started each change.

03

Your labor units and rates

An export from Accubid, McCormick or your own database showing the units and column used, plus the subcontract pages on changes, rates and markups.

04

Material backup

The distributor quotes each request was priced from, with their dates, and any return or restocking terms that applied to deleted material.

05

NDA first, look-alikes if you prefer

Nothing moves until the NDA is signed. If you'd rather keep your units in-house, we build look-alike changes and units with your reviewer.

// Before it starts

Agreed before the first change moves

The owner settles three things first: who judges the drafts, whose labor units they use, and what counts as a pass.

Pricing test termsOwner signs off
Reviewer
Named by the owner. Usually the estimator or PM who prices changes today.
Labor units
Yours, from the export you send. None are made up.
Success criteria
In writing first, including how close labor hours must come
Price
A range for the live job, before it starts
Sample
Changes picked by your reviewer, a few the GC cut among them
NDA
Signed before any export is sent

// How it's judged

Drafts, compared with what your team sent

Line by line
on the same changes
Same 20 to 30 changesYour team's requestThe proof of concept
Document read correctly: priced request, directive or notice neededMeasured on your changesMeasured on your changes
Adds and deletes found on every reissued sheetMeasured on your changesMeasured on your changes
Labor hours from your units, column and factorsMeasured on your changesMeasured on your changes
Material quantities and dated pricesMeasured on your changesMeasured on your changes
Markups as the contract allows, on the net increaseMeasured on your changesMeasured on your changes
Lines the GC cut or questionedMeasured on your changesMeasured on your changes
No figures yet. Every cell waits until your own past changes have been drafted.Your reviewer marks each row and decides.

// After a yes

About 30 days on new changes

After a yes from your reviewer, the same job runs for about 30 days on changes as they arrive.

Every draft waits for your estimator or PM, and only a person on your team sends a price to the GC.

You see the live job's fixed price before signing. Any job after it gets its own price, and monthly support starts once it runs.

// After change orders

What could come next

Ideas, ranked
Priced job by job
  1. 01

    Submittal packages

    Packages for each spec section assembled and checked against the spec, if that job isn't live already.

    Next
  2. 02

    T&M tickets

    Field tickets for directed work checked against daily reports and priced at your contract's rates, for a person to approve.

    Then
  3. 03

    Material buyout

    Distributor quotes set against the takeoff once a change is approved, with exclusions and lead times called out.

    After that

// One hard limit

It never sends a price or invents a labor unit.

Every number reaches the GC from a person on your team, after review. Labor hours come only from the units you provide, NECA's or your own, and an item with no unit is flagged for your estimator. Certified payroll stays out too: no worker's pay or identity is part of pricing a change.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range depends on how many changes a typical job sees and how your labor units and markups are kept.

// Questions

Change order questions

Do you use NECA labor units or ours?
Whichever your estimator used: a NECA column or your company's own database. The draft takes units only from the export you send, and an item that isn't there comes back flagged for your estimator, never estimated.
Does it price cumulative impact or lost productivity?
No. That is a separate claim with its own analysis, and it stays with your PM and counsel. The draft prices the direct work of each change.
What about notice deadlines?
When you send the subcontract's change and claim pages, the draft shows the date each change began and the notice deadline those pages set. Under AIA's A201, a claim has to start within 21 days of the event or of first recognizing it, and a subcontract may set its own clock.
Will it send the request to our GC?
No. In the test nothing leaves, and in a live run your estimator or PM approves every draft and a person on your team sends it.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Test it on changes you already priced.

30 minutes with Rob. You'll be asked for your company and role, the job to test, and roughly how many change orders a typical job sees. Hold back labor units and pricing until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.