30-min call with RobBook a proof-of-concept call
Custom profile, tube, pipe and sheet

// AI for plastics extruders

AI for custom plastics extruders, tested on quotes and resin changes you already handled.

For custom extruders of plastic profiles, tubing, pipe and sheet who sell to building products, equipment and appliance makers. Start with custom profile quotes, a customer's drawing and RFQ read into a draft quote sheet, or with resin substitution requests, a supplier's change or a shortage turned into a draft your customer can answer. Whichever you pick becomes a free AI proof of concept on copies of 20 to 30 files you have already closed. Nobody logs in to your quoting or ERP system. Your reviewer, the colleague who knows that desk best, judges whether it passed.

Book a proof-of-concept call30 minutes with Rob
Extruder proof of conceptAgreed before day one
First job
Custom profile quotes, or resin substitution requests
From you
20 to 30 past RFQs or substitutions, copied after the NDA
Never
A live quote, your ERP, a resin decision or a signed statement
Reviewer
Chosen by the owner up front
Left out
Defense and aerospace work
Price
Range now, fixed price before signing

// Jobs at the quote and quality desks

Start with a drawing or a resin notice

Quotes or substitutions first
One job at a time

// Why start here

The paper behind both jobs already sits in your files

A custom quote starts from a shape. A new RFQ brings a profile print, a resin callout and an annual number, and someone has to work out what that shape will take before it can be priced by the foot, the piece or the thousand. Your estimator has already done that on every RFQ in the file. Your reviewer, the person who knows that desk best, can lay each draft beside the quote that actually went back.

The standards separate the compound from the part. ASTM D4216 classifies rigid PVC compounds for exterior building products by resin type, impact resistance, tensile strength, tensile modulus, deflection temperature and coefficient of linear expansion, and says its requirements don't apply to finished goods. Those sit in other specifications: D3679 for siding, D4477 for soffit, D4726 for window and door profiles, F964 for fencing and railing. A callout on a customer's print can land at either level, which is why a first draft has to keep the two straight.

Some of what you ship carries a mark. The International Residential Code at R703.11 ties vinyl siding to ASTM D3679, with products certified and labeled to show it, according to the association that runs the certification program. That group became the Polymeric Exterior Products Association in April 2024, after decades as the Vinyl Siding Institute, and it now lists D3679, D7793, D7254 and D7445 under accredited third-party certification bodies. A change of compound on a line like that reaches well past purchasing.

Window and recycled-content rules keep moving. AAMA 303, the voluntary specification for rigid PVC exterior profiles in windows, doors and skylights, expanded its section on co-extruded profiles in its 2023 edition, and one trade magazine's summary says that edition keeps recycled PVC to the inner layer that isn't visible or exposed to sunlight. UL moved its requirements for mechanically recycled plastic compounds into a new standard, UL 746S, first published August 30, 2023, and treats regrind shipped to another molder as post-industrial recycled plastic because its traceability is lost. So a substitution has to say what is in the part, down to the layer and the source.

Resin supply can change in a week. The Texas ice storm of February 2021 took resin plants down along the Gulf, and trade press that spring described processors living on cut allotments. Any substitution your team wrote that year is a worked record of what had to be checked, in what order, and what the customer said.

One limit covers both jobs. Nothing in the proof of concept touches your quoting system, your ERP or a live quote, decides that one resin may replace another, or signs a compliance statement. An estimator checks every quote, and a qualified quality or engineering person decides every substitution. Standards are named here for context; this page is not engineering or legal advice.

// How the test runs

From closed files to a month on live work

  1. Step 01

    Pick the desk, name the reviewer

    The owner chooses your reviewer, usually the lead estimator for quotes or the quality manager for substitutions. The success criteria are written down, the price range for the live job is given and the NDA is signed before any file moves.

  2. Step 02

    Run it on files you closed

    Send 20 to 30 RFQs with the quotes that went back, or 20 to 30 substitutions with the letters and data sheets behind them. We call this the sandbox, a free test on paper your team has already handled. If prints have to stay in the plant, we build look-alikes with you.

  3. Step 03

    A month on live work after a yes

    New RFQs or supplier notices go through the same steps for about 30 days. A person approves each quote and each request before it goes anywhere. Any second job is decided and priced by itself.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range turns on how many RFQs your estimators see in a month, and how many resins and customer parts a typical substitution touches.

// Questions

Questions extruders raise first

We run profile, tube and sheet on different lines. Does that change the test?
It changes the sample, not the method. Your reviewer picks 20 to 30 files that match your real mix, and each draft keeps the units and packaging that product is sold in. Tube on reels and profile in lengths land on different lines of the quote sheet.
Will AI pick a substitute resin for us?
No. It sets the data sheets side by side, lists what may be affected and writes the open questions. A qualified quality or engineering person on your team decides whether one resin can replace another.
Does the test need our quoting software or ERP?
No. It runs on copies and exports you send, and drafts come back as files your team can mark up. How live drafts would reach your own systems is settled only after a yes.
Can it read a profile drawing?
It reads what the drawing states: title block, notes, callouts and the dimensions shown. It doesn't measure a model or guess at an unlabeled shape, and anything left out comes back as a question for your estimator.
Some of our pipe and siding carries a listing or certification. Is that a problem?
No. Each draft names the listing or certification a part rests on, as your files show it, and marks the ones a resin change may reach. Whether a listing still holds stays with your quality lead and the organization that issued it.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start from last quarter's profile RFQs.

Half an hour with Rob on your plant, your role, the job you'd test first and about how many RFQs or supplier notices reach your desk each month. Prints and data sheets stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.