30-min call with RobBook a proof-of-concept call
Job 02 · Quality

// Plastics extruders · Resin substitution requests

A resin change or a shortage, turned into a draft substitution request your team can check.

For custom extruders whose resin supplier changes a grade, moves a plant or runs short. One job, tested on substitutions you already handled. AI sets the data sheets side by side, lists the listing and regulatory statements that may be affected, finds the customer part numbers on that resin, and writes the questions a person has to answer first. A qualified quality or engineering person decides whether any resin can replace another, and the customer is asked only after that.

Book a proof-of-concept call30 minutes with Rob
Past substitutions
20 to 30
Resins approved
None
Customers contacted
None

// The one job

A supplier's notice arrives. A draft request reaches your quality lead.

A resin supplier writes that a grade is being discontinued, that a plant is changing, or that allocation is cut for the quarter. Someone on your side pulls both data sheets, works out which customer part numbers run on that resin, finds what each customer was told about the material, checks which listings or statements name it, and writes to the people who have to agree.

In the test, AI works on copies of substitutions you already handled and drafts the request for each one: the properties side by side, the regulatory or listing statements that may be affected, the customer parts involved and the open questions. Whether any of it holds up is for your reviewer, the person on your team who knows this work best, who compares each draft with what your team found and sent at the time. No customer sees a draft.

Supplier's noticeGrade change or shortage
Grade affected
Effective date
Reason given
Replacement offered
PropertyOld gradeNew grade
Invented notice, no supplier's data
Checked against
your parts and files
Draft substitution requestFor your quality lead
Customer parts
Listings that may change
Statements on file
Open questions
Part, customerStatementQuestion
Invented request, for illustration

// What has to be checked

Why a resin change can't be answered from the data sheet alone

Two data sheets may not describe the same test. ASTM D1238 and ISO 1133 both measure melt flow, and ASTM's own note says they address the same subject but differ in technical content; it also says the flow rate is not a fundamental polymer property. For PVC resins, ISO 1628-2 says K-value and reduced viscosity are comparable only when the solution concentrations are identical. A PVC data sheet may report K-value at a stated concentration in cyclohexanone and inherent viscosity under ASTM D5225, while the pipe policy below names ASTM D1243. So the side-by-side carries each property with its method, conditions and units, and leaves a cell empty instead of converting one number into another.

A listed rating belongs to a formulation. The Plastics Pipe Institute's TR-3, 2023 edition, says each recommended rating is specific to the formulation and its mixing procedure, and that changes outside the report's policies make a new composition its listing does not cover. Part E.4 deals with swapping the resin in a PVC pipe formulation: it needs the consent of the Hydrostatic Stress Board's chair, the same D1784 cell class with the new resin as the old, named resin properties such as inherent viscosity and bulk density, and rupture data from commercially produced pipe. Part E.6 treats a new thermal stabilizer the same way, and Part E.2 covers an apparently identical ingredient from a different supplier. Most custom profile carries no PPI listing, but where a pipe or tube part does, the draft names the policy your file relies on and the questions it raises. That is what PPI publishes, not engineering advice.

A card or a listing follows a specific material. A UL Yellow Card lists a grade by color and minimum thickness, beside its flame class, its hot-wire and arc ignition ratings and its relative thermal indexes. UL's colorant FAQ says a Recognized natural resin may be colored only with a Recognized color concentrate, within its let-down limit, and that fabricators can't use non-Recognized colorants with Recognized resins. NSF's public plumbing listings run company by company, then facility by facility, so a change of plant is a line to check as well as a change of material. The draft records which card, file or listing each part rests on as your records show it, and marks what the new grade or supplier may touch.

Food-contact and building statements don't carry over by name. FDA's rules are written polymer by polymer. 21 CFR 177.1020 clears ABS of a stated composition for foods other than those containing alcohol, under conditions of use E, F and G, and 177.1010 sets its own terms for semirigid and rigid acrylics. 21 CFR 178.3790 lists polymer modifiers for rigid vinyl chloride plastics and 178.3297 lists colorants, so a substitute can need its own letter for each component. On exterior vinyl, a compound change can reopen cell class and weathering questions under AAMA 303, so the current edition decides what applies. The draft quotes each statement you hold and lists the ones this change may reopen, and it decides none of them. This is not legal advice.

The where-used list is rarely one report. A resin can sit behind a compound code, a color code, a co-extruded cap layer or an approved list a customer signed years ago. One hoist maker's published supplier change process asks for its form with 90 days' notice before a change, and your customers' agreements may say the same, or stricter. The draft pulls part numbers from the exports and job records you send, notes where a part's material is only described in words, and separates customers with a written approval from those buying to a shared spec. It then lists what someone has to answer before any customer hears about it: how long stock lasts, whether the replacement has been run on your lines, what has been tested, and who signs. The owner names your reviewer, usually the quality manager who handled these requests, and they check every draft against what your team found and sent.

// What you send

What your quality desk pulls together

Copies only
Past changes only
01

20 to 30 past substitutions

Each with the supplier's notice, the request your team wrote and what the customer said back. Include a shortage, a permanent change and one where the customer said no.

02

The data sheets, as they stood

Both grades' sheets from the time, with any test reports or trial notes your team kept.

03

Where each resin was used

Item master or BOM exports, job records or your own spreadsheet, showing the customer part numbers on each resin.

04

What your files already say

UL files and cards, NSF or other listings, food-contact letters, customer specifications and approval letters, as they stood then.

05

An NDA and copies only

Signed first. No login to your ERP, quality system or a supplier's site. If letters can't leave the plant, we build look-alike files with you.

// Before it starts

Agreed before any supplier letter is copied

The owner and your quality lead settle these in writing before anything moves.

Before the proof of conceptOwner decides
Your reviewer
Named by the owner, usually your quality manager
Success criteria
In writing: which properties, statements and parts must be found
Substitutions
Picked by your reviewer from past changes
Who decides
A qualified quality or engineering person, every time
Price
A range for live requests, before any file moves

// How it's scored

What your team did, beside the draft

Change by change
statement by statement
Compared on the same substitutionsWhat your team didThe AI draft
Time from supplier's notice to a draft ready to reviewFilled in from your substitutionsFilled in from your substitutions
Data sheet properties side by side, with methods and unitsFilled in from your substitutionsFilled in from your substitutions
Listings and statements your team identified as affectedFilled in from your substitutionsFilled in from your substitutions
Customer part numbers on the resin foundFilled in from your substitutionsFilled in from your substitutions
Customers that needed a written request, namedFilled in from your substitutionsFilled in from your substitutions
Questions your team had to answer first, raised in the draftFilled in from your substitutionsFilled in from your substitutions
What the customer was told, against what the draft would have saidFilled in from your substitutionsFilled in from your substitutions
Empty for now. A cell fills only after your past substitutions have been run.Your reviewer marks each row and makes the decision.

// After a yes

About 30 days on new supplier notices

With a yes, each new supplier notice or shortage gets a draft request for about 30 days.

Your quality or engineering lead reads every draft, decides whether the substitution can go ahead and writes to the customer. No request goes out, no compliance statement is signed and no material changes on a draft's say-so, and the scoring table stays in use through the month.

// Later, ranked

Where substitution work could lead

Possibilities, not promises
One live before the next
  1. 01

    Custom profile quotes

    A customer's drawing and RFQ read into a draft quote sheet for your estimator.

    Next
  2. 02

    Material statement files

    Listings, letters and certificates kept by resin and customer, with gaps marked for your quality lead.

    Then
  3. 03

    Customer notes on price and supply

    A short note drafted from a supplier's price or allocation letter, for the account lead to edit and send.

    After that

// One hard limit

It never decides that one resin may replace another.

A qualified quality or engineering person decides every substitution, and the draft signs nothing: no compliance statement, certificate or letter. The proof of concept never touches your quoting or ERP system or a live quote, never contacts a supplier or a customer, and never changes a formula, a die or a process. Nothing here is engineering or legal advice. Defense and aerospace work stays out.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call, once he knows how many resin notices reach you in a year and how many customer parts a typical one touches.

// Questions

Questions about resin changes

Will the AI tell us a resin is an approved equal?
No. It shows where the two data sheets agree, where they differ and what your files say about each part. Whether one resin may replace another is decided by a qualified quality or engineering person on your team.
Does it tell us whether a UL or NSF listing still holds?
No. It records which file or listing each part rests on and marks what the change may reach. Your quality lead settles that with the organization that issued it.
Will anyone test our resin?
No. Nothing is sampled, run or tested in this job. It uses only the data sheets, notices, letters and records you send, and a gap in them is listed as a gap.
What about a compound we blend ourselves, with no public data sheet?
Send the internal spec or the last test report. The draft shows whatever you provide and leaves a row blank where a property was never measured, rather than assuming a match.
Will it write to our customers?
No. The test returns drafts to your reviewer and contacts no customer or supplier. In the live month a person on your team still sends every request.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with the last resin change you handled.

Thirty minutes with Rob on your plant, your role, the job you'd test first and about how many resin notices reach your team in a year. Data sheets, letters and part lists stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.