// AI for wireless tower contractors
AI for wireless tower contractors, tested on closeouts your PMs already sent in.
For regional contractors who build, modify and maintain tower sites for carriers, tower owners and public-safety networks. Start with site closeout packages, or with the structural modification scopes your estimators work from. Either one becomes a free AI proof of concept on copies of 20 to 30 jobs you already finished or bid. The person on your team who knows that work best is your reviewer, and that person's call settles it.
- First job
- Closeout packages, or modification scopes
- From you
- 20 to 30 finished sites or old bids, copied after the NDA
- We touch
- None of your systems, and no carrier portal
- Never
- A structural call, a rigging decision, a package submitted
- Reviewer
- Named by the owner up front
- Price
- Range now, fixed price before signing
// Jobs we would test
Start where the project manager or the estimator is buried
Site closeout packages
Field photos, sweep results, as-built redlines, torque and grounding records and lien waivers sorted against the customer's written checklist, with every line that has nothing behind it listed for the project manager.
See the closeout pageStructural modification scopes
A structural analysis report and its modification drawings laid out as a draft scope sheet for the estimator: members and bolts as named, stated climbing and rigging limits, the inspection required afterward, and each place the two documents disagree.
See the modification scope pageCondition assessment write-ups
Notes and photos from a periodic climb drafted in the owner's report format, each deficiency listed by elevation for the person who signs the report.
Hoist and gin pole site files
The records a site keeps on hand for a hoist or gin pole, gathered job by job from your own forms, with any missing inspection or proof test marked for your safety lead. It files what exists and approves nothing.
// Why these two first
The rules and the buyers both arrive in writing
The standards split in two. A TIA webinar from January 2017 says ANSI/TIA-322 and ANSI/ASSE A10.48 replaced ANSI/TIA-1019-A as of January 1 of that year, one labeled the engineer's standard and the other the contractor's. Job files from before that date can still cite the old one, so the paper your estimators and project managers read doesn't all speak the same edition.
Public buyers write the revision into the bid. Leon County, Texas, answering bidders on its radio tower RFP in April 2026, said a reference to TIA-222-H was a typographical error and that TIA-222-I governs all design criteria, wind loading included. The same addendum moved one FAA advisory circular citation up to 70/7460-1M and, a few answers later, still cited the -1L edition. A draft has to carry whatever edition each document states, and a person decides when two documents cite different ones.
A hoist leaves paperwork on site. OSHA's directive CPL 02-01-056, effective July 17, 2014, widened its enforcement guidance from new tower erection to any hoisting of personnel on a communication tower. Its appendix tells employers to document trial lifts, inspections, proof tests and pre-lift meetings and keep them readily accessible for the whole project. Michigan's tower rules add a gin pole chart for each pole that has to say capacity is cut in half when people are lifted.
Registration follows the structure. Under 47 CFR Part 17 the antenna structure registration number has to be readable from the public area nearest the base, on the fence or gate where there is one, and completed construction or a height change is reported within 5 days. Who files is the owner's question. Your closeout is where the dates come from.
Height brings in the FAA. Federal notice applies above 200 feet at the site, among other triggers, with Form 7460-1 due at least 45 days ahead. The follow-up Form 7460-2 has a line for the date the structure reached its greatest height, due within 5 days. An extension on an existing tower raises that question on the scope, whatever the answer turns out to be. None of this page is legal or engineering advice.
One limit covers both jobs. The proof of concept reads copies and writes drafts. It never opens your project management system or a carrier portal, never runs on a live closeout or a live bid, never interprets a structural analysis, never decides a rigging plan is safe and never submits a package. An engineer of record owns every structural call, an estimator approves every scope and a project manager submits every package.
// How the test runs
Three steps on finished work
- Step 01
Pick the desk, name the reviewer
Your owner names the reviewer, usually a senior project manager for closeouts or the chief estimator for modification scopes. Nothing leaves your office until the success criteria are written down, you have a price range for the live job and the NDA is signed.
- Step 02
Run it on finished jobs
Send 20 to 30 closed sites with their checklists and field records, or 20 to 30 old modification bids with the report, the drawings and the scope your estimator wrote. Inside Massmarket we call this the sandbox: a free AI proof of concept on work your team already finished. Where a customer's paperwork can't leave your office, we build look-alikes with your team.
- Step 03
After a yes, about 30 days live
The same job runs on new sites for about 30 days, and a person on your staff approves each item before it goes anywhere. A second job is a separate decision priced on its own, with monthly support after that.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
On the call Rob sets the range from three counts: closeouts or modification bids in a month, customer checklists you work to, and crews feeding the office.
// Questions
What tower contractors ask first
Do you need access to our project system or a carrier portal?
Can it read a structural analysis and tell us the modification works?
Every customer has its own closeout list. Does the test have to handle all of them?
Will the AI write or approve a rigging plan?
Will it contact our customers or file anything with the FCC or FAA?

Rob Eason, founder
// Book a proof of concept call
Bring one closed site and its checklist.
Thirty minutes with Rob about your crews, the customers you close out for and the job you would test first. Photos, reports and drawings stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
