30-min call with RobBook a proof-of-concept call
Detail, cut, bend and deliver

// AI for rebar fabricators

AI for rebar fabricators, tested on bid sets and placing drawings you already closed.

For shops that detail, cut, bend and deliver reinforcing steel for commercial buildings, bridges and public works. Begin with quantity sheets drawn from a bid set, or with placing drawing checks against the structural set and its addenda. Whichever you choose becomes a free AI proof of concept on copies of 20 to 30 bids or drawing sets your team has finished. Nobody signs in to your detailing, estimating or production software. Your reviewer, the person on your team who knows that work best, makes the call on whether it passed.

Book a proof-of-concept call30 minutes with Rob
Rebar proof of conceptSettled up front
First job
Quantity sheets, or placing drawing checks
From you
20 to 30 closed bids or drawing sets, copied after the NDA
Stays untouched
Detailing, estimating and production systems, and every live bid or drawing
Never
A design requirement decided, a drawing approved
Left out
Defense and aerospace work
Reviewer
Chosen by the owner before day one
Price
Range first, fixed price before signing

// Jobs we would test

Start at the estimating desk or in the detailing room

Takeoff or drawing check first
Commercial and public work
JOB.01 · START HERE

Bar list quantity quotes

A bid set's general notes, schedules and details read into a draft quantity sheet: bar sizes and grades, coated or plain, schedule marks, laps and hooks called out, accessories, and the members someone must take off by hand or clarify before pricing.

See the quantity sheet page
JOB.02 · OR START HERE

Placing drawing checks

Placing drawings compared with the structural drawings and addenda: bar marks, spacing, counts and revisions carried or missed, with each conflict written up for your detailer and the engineer to resolve.

See the drawing checks page
JOB.03

Shipment certification packets

The form a transportation department wants with a load, filled in from your identification list, heat numbers and coating lots, with any gap marked for your quality lead.

JOB.04

Field releases and add-on orders

A placer's or contractor's emailed release for a pour, matched to the sheets and bar lists it names, so your production coordinator sees what is detailed, what is ready and what is missing.

// Why these two first

Two desks whose finished work is already in the file

Estimating and detailing are separate crafts under one roof. CRSI's Manual of Standard Practice, in its 31st edition from 2024, gives estimating reinforcing materials and services one chapter and detailing the next. ACI 315R-18, the Guide to Presenting Reinforcing Steel Design Details, from a joint ACI and CRSI committee, draws a similar line in its definitions: a detailer produces fabrication details and placing drawings, and a fabricator produces the steel cut and bent to them. Both desks do their work on paper, ahead of the shear, which is what lets a test on old documents be fair.

Your closed work is the answer key. Every bid you priced has a quantity sheet behind it, and every placing set you issued has whatever came back from review. Your reviewer can score each draft against those records, member by member or mark by mark, with no live job at risk.

Bends have a published standard, and they stay on the shop floor. CRSI's IPG5.1-2026 covers bend diameters, measuring points and fabrication tolerances for steel reinforcing bars. A bar's shape comes to the test from the work your detailers already did. The draft reads what your drawings say and never tells the shop how to bend.

Public owners want paper with every load. An October 2011 appendix to Iowa DOT's materials instructions has suppliers and fabricators of epoxy coated steel that lack a coating line of their own approved before bidding on its projects, after explaining in writing how they keep heat numbers and inventory straight from arrival through shipment; coating plants holding CRSI's fabrication certification skip that step. Its identification report has columns for size, length, grade, heat number, coating lot, pieces and weight. Georgia's Standard Operating Procedure 26, revised in 2003, wants DOT Form 166 A for epoxy coated bars, with heat numbers, contractor and project number, within five days of shipment. That is why shipment packets sit third on this page.

Plant certification is a different audience. CRSI's Epoxy Bar Fabricator Certification looks at quality control, handling and storage, identification and coating repair, with an independent third party inspecting plants at random at least once a year, and CRSI publishes CG2.1-2026 for epoxy-coated bar fabrication facilities. None of that comes into this test, which reads documents and leaves the yard, the shear and the audit to your people.

One limit covers both jobs. Nothing here touches your detailing, estimating or production system or a live bid or drawing, and nothing decides what a design requires or approves a drawing. An estimator checks every quantity sheet, and your detailer and the engineer of record decide every conflict. Standards and agency rules are named so you can recognize them; nothing on this page is legal or engineering advice.

// How the test runs

Three steps, on takeoffs and sheets already finished

  1. Step 01

    Pick the desk, name the reviewer

    Your owner names the reviewer, usually a chief estimator for quantity sheets or a lead detailer for drawing checks. The written success criteria, a range for running it live and a signed NDA are all in hand before a sheet changes hands.

  2. Step 02

    Run it on closed work

    Send 20 to 30 bid sets with the quantity sheets your estimators priced from, or 20 to 30 placing sets with their structural sheets, addenda and returned marks. Around here that step goes by the sandbox: a free AI proof of concept run on takeoffs and sheets you've finished. Drawings that can't leave your building get look-alikes, built with your reviewer.

  3. Step 03

    After a yes, about 30 days live

    New bid sets or new drawing submissions go through the same job for about a month, and a person on your staff approves each item before it posts anywhere. If you want a second job after that, it gets its own decision and its own price, with monthly support to follow.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call from three counts: bid sets or drawing submissions handled in a month, sheets in a typical set, and how many owners' formats your desk works in.

// Questions

What rebar shop owners ask first

Does the test need a login to our detailing or estimating system?
No. The proof of concept runs only on copies of drawing sets, specs and exports your team has closed. Nobody logs in to your detailing, estimating or production system, and no live bid or drawing is touched.
Will the AI decide what the design requires?
No. It lists what the general notes, schedules and details say and what they leave unclear. Your detailer and the engineer of record decide every conflict, and nothing in this test approves a drawing.
Most of what we receive is PDF drawing sets. Is that a problem?
No, those PDFs are what the test should run on, since they are what reaches your estimators. A sheet the draft can't read clearly is marked for your reviewer rather than filled in.
Can one test cover bridge work and building work?
Yes, if your reviewer picks both. A state bridge set reads differently from a building set, with marks and counts written the agency's way, so each kind belongs in the sample in the mix your shop really works.
We furnish on some jobs and furnish and place on others. Does that matter?
Only for which scope the draft should read. Each bid in the sample is labeled furnish only or furnish and place, the way your estimator bid it. Placing labor and crew decisions stay with your estimator.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with bids your estimators already closed.

Thirty minutes with Rob on your shop, your role, the job you'd test first and about how many bid sets or drawing submissions cross your desks each month. Drawings, specs and takeoffs stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.