30-min call with RobBook a proof-of-concept call
Underground, architectural and structural precast

// AI for precast concrete manufacturers

AI for precast concrete manufacturers, tested on projects you already quoted.

For plants casting underground utility structures, box culverts, vaults and architectural or structural pieces for commercial and public work. Begin with a structure schedule quote, or with the quality record package a project requires. Either one runs as a free AI proof of concept on copies of 20 to 30 projects you've closed out. Nobody signs in to your estimating, production or quality system. Your reviewer, the person on your team who knows that work best, rules on the result.

Book a proof-of-concept call30 minutes with Rob
Precast proof of conceptSettled first
First job
Structure schedule quotes, or quality record packages
From you
20 to 30 closed projects, copied after the NDA
Stays untouched
Estimating, production and quality systems, live bids and submittals
Never
A piece cleared, a load confirmed, a defect accepted
Reviewer
Named by the owner before anything starts
Price
Range first, fixed price before signing

// Jobs we would test

Start at the estimating desk or the quality office

Piece lists or record packages
Commercial and public work

// Why these two first

A precaster's closed projects already show the right answer

One word can point to four standards. A schedule row reading manhole, vault, box or structure could fall under any of several specifications. ASTM C478 is written for circular vertical manholes and structures in sewer, drainage and water work. ASTM C913 covers precast water and wastewater structures and sets aside concrete pipe, box culverts, utility structures and anything already under C478. ASTM C1433 is for single-cell monolithic box sections used as culverts and for storm water and sewage. ASTM C858 takes underground utility structures and excludes pipe, box culverts and C478 manholes. Your estimator sorts all of that out before pricing anything, and each past quote records how it came out, which makes the job fair to judge.

The plant gets certified, the piece doesn't. The National Precast Concrete Association's FAQ on its certification program says plainly that it does not certify products. A representative of an independent engineering firm audits each plant once a year, unannounced after the first visit, across pre-pour, casting, curing, stripping and repair work, post-pour and final inspection, and quality control recordkeeping. The Precast/Prestressed Concrete Institute has each plant write its own Quality Systems Manual and audits architectural products against one manual, MNL-117, and bridge and commercial structural products against another, MNL-116. A package citing the wrong program or manual is the kind of slip your quality manager catches by hand today.

States stack their own paper on top. Georgia keeps certified drainage and manhole plants on Qualified Products List 4, and a plant without continuous approval from before January 2024 now needs American Concrete Pipe Association QCast or NPCA certification to get there. Indiana's department-certified producer program, ITM 813-26, accepts ACPA, NPCA or PCI plants (Group B1 or C1, or their A versions), wants audit documents in within 60 days of an audit, and can pull a plant from its list for casting before required working drawings come back marked no exceptions taken. Maryland asks for a binder of 20 numbered tabs, ready four weeks before the annual inspection, down to the latest mill certifications and delivery tickets for welded wire and deformed bars and a copy of each quality control stamp with its holder's signature.

Underground work bids by the structure. Deer Park, Texas, in its specification for precast concrete manholes, pays per each at various depths, measures that depth from the flow line to the top of the casting, and sets the live load at H-20 and/or H-20-S16. A contractor's number there depends on getting every structure, its depth and its load line right. That is the same information your estimator's finished piece list holds, which is why the quoting job has an answer key sitting in your files.

Architectural and structural work asks for other paper. The University of Houston's master section for structural precast, 03 41 00, wants erection drawings identifying each member, production drawings with reinforcing, lifting devices and estimated member weights, and every shop drawing sealed by a professional engineer licensed in the project's state. Its architectural section, 03 45 00, adds at least three finish samples about 12 inches square and a full-size sample of each required unit. There the piece list is built member by member instead of structure by structure, and the test can start on that side of the plant if that's where your estimating sits.

One limit covers both jobs. The proof of concept never touches your estimating, production or quality system or a live bid or submittal. It never decides that a piece meets a specification, that a structure carries a load or that a defect is acceptable. An estimator checks every piece list, and a qualified quality person or engineer signs every package. Defense and aerospace work stays out of the test. The standards and agency programs on this page are named so you can place them, and none of it is legal or engineering advice.

// How the test runs

Three steps, on work the plant has finished

  1. Step 01

    Pick the desk, name the reviewer

    Your owner names the reviewer, most often a chief estimator for quotes or a quality manager for packages. Success criteria in writing, a price range for the live job and a signed NDA are all settled before a file leaves the plant.

  2. Step 02

    Run it on closed projects

    Send 20 to 30 quoted projects with their plan sheets, schedules, specifications and the piece lists your estimators built, or 20 to 30 shipped projects with their plant records and the packages that went out. We call this the sandbox: a free AI proof of concept on your own files. Anything that can't leave the plant gets look-alikes, built alongside your reviewer.

  3. Step 03

    After a yes, about 30 days live

    New projects run through the same job for about a month, and someone on your staff approves each piece list or package before it goes anywhere. A second job waits for its own decision and its own price, and monthly support comes once one is running.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call from three counts: projects quoted each month, plants you run, and how many different owners' document sets your quality office works to.

// Questions

What precast owners ask first

Do you need access to our estimating or quality software?
No. The proof of concept runs only on copies and exports of plans, schedules, piece lists and plant records from projects you've closed. Nobody signs in to an estimating, production or quality system, and no live bid or submittal is touched.
Will the AI tell us a structure is rated for the load?
No. It copies the load rating the plans or specification state and flags where none is stated. Whether a structure carries a load, and whether a piece meets a specification, stays with your engineer and your quality staff.
We cast manholes, vaults and box culverts. Do we need separate tests?
One job, one test, but the sample should match what you really quote, so put a mix of product lines in it. Schedules for round structures, boxes and vaults read differently, and your reviewer should see each kind.
Our plant is NPCA or PCI certified. Does that change anything?
It tells us which manual and forms your records follow, so the draft can use your own terms. Certification doesn't change how the test is judged: your reviewer still compares each draft with what your team actually sent.
Can state DOT and public owner projects be in the sample?
Yes, if your agreements allow it. Public projects are useful because their record requirements are written down, and several owners in the sample test more than one set of rules. Anything you can't share gets look-alike versions built with your reviewer.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with last year's quoted projects.

Half an hour with Rob: your plants, your role, what you cast, the job you'd test first and roughly how many projects you quote in a month. Plans, schedules and plant records stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.