30-min call with RobBook a proof-of-concept call
Job 02 · Treatment file

// Pallet and crate manufacturers · ISPM 15 treatment records

Kiln and chamber records, assembled into one treatment file for the person who answers for your program.

Your inspector can ask about any charge, any stamp or any truckload of heat treated lumber, and the answer is spread across chart printouts, stamp logs and supplier invoices. In a free AI proof of concept, AI assembles a draft treatment and marking file from copies of 20 to 30 past charges or lots, and lists every batch with a record missing. Your reviewer, the person on your team who knows this program best, holds each draft against the file your plant actually kept.

Book a proof-of-concept call30 minutes with Rob
Past charges or lots
20 to 30
Marks authorized
None
Kiln controller access
None

// The one job

From scattered charts and invoices to a file by batch

A batch leaves paper in several places. The kiln or chamber produces a chart, someone fills out a stamp log, the lumber arrives with an invoice, and whoever supervises quality pulls it together when an inspector asks.

For the test, AI reads copies of those records and drafts the file by batch: batch and load, the schedule used, a reference to the temperature log, the fields of the certified mark, the lumber supplier documents, and the batches with a record missing. It never reads a chart as a pass or a fail. Your reviewer compares each draft with the file your plant actually kept.

Chamber and lumber recordsCharts, logs, invoices
Charge no.
Chamber
Start and end
Stamp used
SourceReferenceDate
Invented records, no plant's data
Assembled into
a file by batch
Draft treatment fileFor your responsible person
Batch and load
Schedule
Temperature log ref.
Mark fields
BatchRecord foundRecord missing
Invented file, for illustration

// What makes it hard

Where a treatment and marking file comes apart

One plant can be three kinds of facility, and the lumber trail is arithmetic. NELMA, one of the inspection agencies accredited by the American Lumber Standard Committee, certifies wood packaging facilities that buy heat treated lumber and build, remanufacturers that resize it, and heat treatment facilities with their own chamber, and one plant can be more than one. For lumber bought in, ALSC's enforcement regulations, dated November 7, 2025, want documentation that purchases were enough to produce what was labeled, and have the agency confirm it, generally monthly. NELMA's forms show the shape: an HT Lumber Purchases Form, one sheet per size, with date received, thickness by width by length and board feet, beside a WPM Stamped Usage Report with job number, material used, item size, quantity and board feet, all kept for the three years before the current calendar year. Each purchased piece needs an HT mark, a facility ID and an agency logo, and NELMA warns against reading that ID as a grade number. The draft runs a balance size by size and shows any month when usage passes purchases.

Each charge has its own paper, and the method changes what it looks like. ISPM 15, in the edition adopted in 2018, sets 56 degrees C for 30 continuous minutes through the whole profile of the wood in a conventional chamber, and 60 degrees C for 1 continuous minute for dielectric heating. ALSC accepts monitoring by wet and dry bulb, by dry bulb alone against a schedule, or by thermocouples in the core of the thickest piece, and counts kilns, heat boxes and any other enclosed apparatus as heat chambers. NELMA's own minimum is higher, 140 degrees F (60 C) for 30 consecutive minutes with thermocouples, generally at least three of them. Its HT chart is a good model of the record: a unique charge number, start and end date and time, an incremental temperature record, the items in the charge, the thickest piece, and board feet split by IPPC, HT and Dunnage stamp. The draft copies those fields and cites the chart by charge. It doesn't read the curve.

A missing reading is the finding that matters. ALSC says a thermocouple that fails to record, without adequate duplication, calls into question the results for the affected charges, and a charge that falls short can't be quality marked unless it is properly re-heat treated. ISPM 15 lists finding the coldest location in each load among the factors a country should consider, and recommends at least two sensors, set at least 30 centimeters from a board's end and reaching the center, with pallet blocks probed in the piece with the largest dimensions. Treatment providers keep heat treatment and calibration records for a time their national plant protection organization sets. ALSC has equipment more than 5 degrees F off recalibrated or replaced, keeps each verification study at both the agency and the facility, and requires annual calibration and requalification after a major change for chambers under that rule. So the draft's missing-record list is concrete: no chart, no charge number, a calibration date that doesn't cover the charge, a sensor short of what your agency approved. Your responsible person decides what each one means.

The mark is a set of fields with rules of their own. Annex 2 of ISPM 15 requires the symbol, the ISO two-letter country code, a hyphen, the producer or treatment provider code and a treatment code of HT, DH, MB or SF, with nothing else inside the border. It must not be hand drawn, red and orange should be avoided (NELMA prohibits them), and it goes preferably on at least two opposite sides. APHIS and CBP took no action from March through December 31, 2025 on shipments missing only that hyphen, and resumed enforcement on January 1, 2026. The Uniform Standard for Wood Pallets notes that sulfuryl fluoride is not approved for use in the United States. ALSC's label also carries the accredited agency's symbol or name. NELMA treats its stamps as its own property, accounted for and kept at the facility they were issued to, and has full-length dunnage stamped every two feet. The draft reads which stamp went with which job from your records and lays out those fields for checking. Authorizing a mark is never its call.

Used wood splits the rules, and your reviewer settles it. ISPM 15 calls a unit repaired when up to about one third of its components are replaced and remanufactured beyond that, and lets a repaired unit keep its marks if each added treated piece is marked, while letting a country require more. Woodpack Global's 2025 standard says repaired, remanufactured and combo pallets must be retreated and remarked by an ALSC monitored facility with the old marks obliterated, and NELMA says the same, with a narrow exception for a completely replaced box or crate side, top or bottom. A marked unit left unaltered needs nothing new. Packaging made wholly of processed wood such as plywood falls outside ISPM 15, yet NELMA wants a plywood-covered crate stamped on its framing and its covering. The draft records what your records say was done and cites your agency's procedure rather than picking a rule. ALSC has management appoint a trained employee with authority to remove the mark and hold shipments, and that person is usually your reviewer. None of this is legal or compliance advice.

// What you send

Records your plant already keeps

Copies only
Originals stay put
01

20 to 30 past charges or lots

Chart printouts or exports for each charge, with the load sheet if you keep one. If you only buy heat treated lumber, send 20 to 30 marked lots instead. Include one your team had to rerun or hold.

02

Stamp and usage logs

Whatever shows which stamp went on which job and how much wood went in: usage reports, dunnage logs, your stamp inventory.

03

Lumber supplier documents

Invoices, bills of lading and your purchase log for the same period, by size, as they reached your file.

04

Your program's procedures

The quality control procedure your inspection agency approved, your facility number and past inspection reports if you're willing to share them.

05

NDA, then copies

Signed first. No one logs in to a kiln controller, a chart recorder or your ERP. If records can't leave the plant, we build look-alikes with your team.

// Before it starts

Settled before the first chart is copied

The owner and your program's responsible person write these down first.

Terms for the records testOwner decides
Your reviewer
Named by the owner, usually the employee who supervises quality control
Success criteria
In writing: which fields must be found, and how a missing record is counted
Batches
Your reviewer's pick, including a rerun and a repaired lot if you have them
Who decides
Your responsible person, every treatment question
Price
A range for the live month, quoted up front
NDA
Signed before any record moves

// How the test is judged

The file your plant kept, next to the draft

Batch by batch
Record by record
Across the same 20 to 30 charges or lotsFile your plant keptAI draft
Batch, load and items tied to the right chargeFilled in on your recordsFilled in on your records
Schedule and monitoring method namedFilled in on your recordsFilled in on your records
Temperature log found and referencedFilled in on your recordsFilled in on your records
Mark fields, stamp and job matchedFilled in on your recordsFilled in on your records
Lumber supplier documents tied to each lotFilled in on your recordsFilled in on your records
Batches with a record missing, listed with what is missingFilled in on your recordsFilled in on your records
Items your responsible person flagged that the draft also flaggedFilled in on your recordsFilled in on your records
Nothing scored yet. Each cell stays empty until your own records have been through.Your reviewer marks them and makes the call.

// After a yes

About 30 days on new charges

When your reviewer approves, new charges and lots get the same draft file and gap list for about 30 days.

Your responsible person reviews every file and decides each treatment question, and the charts and logs stay exactly as your plant keeps them.

Anything further is a new decision, one job at a time, with a price of its own.

// Possible next jobs

Where the records job could lead

Ideas, ranked
Priced one by one
  1. 01

    Pallet spec quotes

    Customer drawings and spec sheets read into a draft quote sheet for your estimator to check.

    Next
  2. 02

    Stamp and usage reconciliations

    A monthly count of stamps issued, jobs marked and board feet used, for whoever prepares for the agency's visit.

    Then
  3. 03

    Export crate quote sheets

    Crate requests read into style, base, sheathing and treatment fields for your crate estimator.

    After that

// One hard limit

It never decides a treatment question or authorizes a mark.

It assembles records and lists what is missing. It never touches a kiln controller, a chart recorder, a quoting or ERP system or a live record, never says a batch met a schedule, never applies or authorizes a mark, and never contacts your inspection agency, APHIS or a customer. Every treatment question belongs to your certified program's responsible person. Nothing here is legal or compliance advice, and defense and aerospace work never comes in.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call from two counts: how many charges or marked lots you log in a month and how many chambers or lumber suppliers feed them.

// Questions

Treatment record questions

Will the AI tell us whether a charge passed?
No. It assembles the chart reference, the schedule and the fields around them, and lists what's missing. Whether a batch met a treatment schedule is your responsible person's decision.
Does it connect to our kiln controller or chart recorder?
No. Nothing connects to a kiln controller, a recorder or any live system. You send copies of charts and logs, and the originals stay as they are.
We don't treat anything on site. We buy heat treated lumber and stamp finished pallets. Does this fit?
Yes. For a plant with no chamber the file is built from lumber receipts, usage reports and stamp logs, lot by lot. Send 20 to 30 marked lots in place of charges.
Can it read paper strip charts?
It reads the charge number, dates and notes on a clear scan and cites the chart by that number. It does not judge the trace itself, and a chart it can't tie to a charge goes on the missing-record list.
Can it write the heat treatment certificate a customer asks for?
Not in this test. The draft file goes only to your responsible person. Whether you issue a certificate, and what it says, stays with your team and your agency's rules.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with last quarter's charge records.

Half an hour with Rob about your plant, your role, whether you run a chamber and about how many charges or marked lots you log a month. Charts, logs and invoices stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.