// Metal fabricators · Change orders
Change orders from revised drawings, drafted against the steel you already detailed, bought and cut.
For structural and misc metals fabricators. One job, tested on revisions your project managers already worked through. Each AI draft lists every change in the new issue or RFI answer, shows where each affected piece stood that day, and writes the change order request. Your PM checks it and decides what the GC gets.
- Past revisions
- 20 to 30
- Designs changed
- None
- System access
- None
// The one job
A new issue lands mid-job. A change list and a draft request come back.
The engineer reissues six sheets with clouds and a new revision number, or answers an RFI with a sketch that moves a beam line. By then your detailer has drawings out for approval, the mill order is placed and the first sequence may be on the saw. Someone has to find every change, check it against the model, the cut list and the shipping log, and get a request to the GC before more work goes into steel that is about to change.
In the proof of concept, AI works through copies of revisions your team already handled and drafts the change list and the request your PM would have sent: what changed, piece by piece, where each affected piece stood that day, and the added or deleted work priced from the job's own estimate. Nothing goes to the GC.
the bid set and the shop
// What the request has to show
Where a fabricator's change order is won or lost
Find every change, not only the clouded ones. Section 3.6 of the AISC Code of Standard Practice, ANSI/AISC 303-22, asks that revisions be clearly and individually indicated, dated and numbered, with each design drawing keeping its number for the life of the project; a revised model must identify its changed items or come with a written list. Its commentary treats a sketch as a new contract document with its own number and date. Real issues fall short: a cloud gets left off, or a size changes outside one. So the draft compares each reissued sheet with the one your detailer used and with the set the job was bought on, member by member, and lists anything found outside a cloud on its own line.
RFI answers and approval notes count too. Under Section 4.4.2, unless noted otherwise, changes shown in RFI responses or on approved approval documents are released for construction, and the fabricator must promptly tell the owner's designated representative for construction when one adds cost or delay. Drawings come back approved or approved subject to corrections noted, within 14 calendar days unless the contract says otherwise, and a correction written on a returned drawing can change the work with no new revision. So the draft reads your returned approval drawings and RFI log along with the reissued sheets. Section 4.6 also says RFIs are not for releasing the design a piece at a time.
Where the steel stood decides the cost. Section 9.3 has revisions confirmed by change order or extra work order, and Section 9.4.1 prices them on the work added or deleted, the change in its character, and the timing against material ordering, detailing, fabrication and erection. Its commentary asks the reviewer to allow for the disruption, the material already bought and the work already done. So each affected piece gets its status on the day the revision arrived: modeled, on an approval drawing, released, on order, cut, welded, coated or shipped. Tekla PowerFab, for one, matches model changes by GUID rather than piece mark and won't let an import change items already taken from stock; on a revision import it shows which assemblies have piece tracking or taken-from-stock entries, and each change can be allowed, saved for later or prevented.
Pound-priced jobs follow their own rules. On a price-per-pound contract, Section 9.2 sets pay weight as the gross weight on the fabrication documents, with no deduction for cuts, copes, clips, holes or weld preparation, and with weld metal and coatings left out. Section 9.4.3 says such contracts provide for changes made before release for construction, while changes after release adjust the price equitably. The draft weighs steel the way your contract defines it, prices from the job's estimate and your rate sheet, and leaves any line without a rate for your PM. Section 9.5.2 asks the fabricator to report a revision's effect on the schedule, so the draft carries your PM's schedule note or asks for one.
Your reviewer. The owner names the person who knows your change orders best, usually a project manager or the chief estimator. They hold each draft against the request your team sent: changes found and missed, each piece's status, weights and hours, rate sources, the schedule note and the questions for the GC. Include a revision that landed after steel was cut and one the GC pushed back on.
// What you send
What your project managers pull together
20 to 30 revisions you handled
Each new issue, bulletin, sketch or RFI answer as it arrived, with the change order request your PM sent and what the GC did with it: approved, cut back or turned down.
Where the steel stood
Records from near each revision's date: approval status, purchase orders, production tracking and shipping logs. A PowerFab export or your own spreadsheets will do.
The bid the job was bought on
The original estimate, your rate sheet and the subcontract pages on changes, so added and deleted work prices the way that job was sold.
An NDA before any drawing moves
Signed first. AISC 303 keeps any copyright the design side owns in the contract documents with that side, so their terms matter too. No login to your model, PowerFab or the GC's project site.
Look-alike revisions, if needed
If drawings can't leave the office, we build look-alike revisions with your reviewer that keep the same kinds of changes and timing.
// Before it starts
Agreed before the first revision is copied
The owner and the reviewer settle these in writing before any drawing is shared.
- Your reviewer
- Named by the owner, usually a PM or the chief estimator
- Success criteria
- Changes that must be found, statuses that must match, how close weights must come
- Status date
- Each revision judged on what was true the day it arrived
- Rates
- From the job's estimate and your rate sheet only
- Price
- A range for live change orders, given up front
// How it's scored
The request your PM sent, beside the draft
| Compared on the same revisions | What your PM sent | The AI draft |
|---|---|---|
| Time from revision received to change list ready for review | Filled in from your revisions | Filled in from your revisions |
| Changes found on each reissued sheet, inside and outside the clouds | Filled in from your revisions | Filled in from your revisions |
| Changes carried in RFI answers and approval drawing notes | Filled in from your revisions | Filled in from your revisions |
| Each affected piece's status that day: detailed, bought, cut or shipped | Filled in from your revisions | Filled in from your revisions |
| Added and deleted weight and hours, with every rate's source | Filled in from your revisions | Filled in from your revisions |
| Schedule effect stated, or asked for | Filled in from your revisions | Filled in from your revisions |
| Questions for the GC that your PM also raised | Filled in from your revisions | Filled in from your revisions |
// After a yes
About 30 days on live jobs
After a yes, each new issue, sketch or RFI answer on your open jobs gets a change list and a draft request as it arrives, for about 30 days.
Your PM checks every line, prices what has no rate and decides what goes to the GC. Nothing in your model, PowerFab or the shop schedule changes because of a draft, and the scoring table runs through the month.
// Later, ranked
Where change orders could lead
- 01Next
Material buys from the cut list
Revised cut lists set against stock and usable drops, with the buy list drafted for your purchasing lead.
- 02Then
RFIs from the detailer's questions
Questions raised while detailing written up one to an RFI, with the drawing location and a suggested answer, for your detailer to send.
- 03After that
Back-charge replies
An erector's or GC's back-charge matched to the drawings, approvals and shipping records behind it, for your PM to answer.
// Across industries
The same job in other industries
// One hard limit
It never changes a design or sends a change order.
It finds changes, shows where the steel stood and drafts the request, then stops. It never revises a model or drawing, never sizes a member or a connection, and never judges whether a connection still works; that stays with the engineer of record or your connection engineer. Your PM signs and sends every request, and holding or releasing shop work stays with your people.
Change order drafting carries its own price: a range before the test, a fixed price before you sign.
The range follows how many open jobs you carry and how many revisions a typical job sees.
// Questions
Change order questions from fab shops
The engineer didn't cloud every change. Will it still find them?
Can it tell us whether a revised connection still works?
We bid this job by the pound. Can it price the change that way?
Does it work inside Tekla Structures, SDS2 or PowerFab?

Rob Eason, founder
// Book a proof of concept call
Test it on revisions you already priced.
Thirty minutes with Rob. The form asks for your company and role, the job you would test and roughly how many revisions and RFI answers reach your PMs each month. Keep drawings back until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
