// Land surveying firms · Exception review
Title exception review sheets, drafted from Schedule B for your project surveyor to decide.
Before a plat is finished, someone in your office works through each Schedule B exception in the commitment and the instrument behind it. A free AI proof of concept has AI lay those exceptions out as a review sheet, one line each, on copies of 20 to 30 jobs you already closed. It quotes each instrument's location wording and leaves the plottable call open. Your reviewer, the colleague who knows this review best, sets each sheet against the notes on your delivered plat.
- Closed jobs
- 20 to 30
- Plotting decisions made
- None
- Title companies contacted
- None
// The one job
A commitment arrives. Every exception gets its line.
A title commitment lands with its exception documents, or with some of them. Someone reads Schedule B, Part II line by line, finds the matching instrument, pulls out whatever it says about location, and notes what the surveyor still needs before deciding what goes on the plat.
In the test, AI works from copies of those papers and drafts the review sheet: exception number, instrument reference by book and page or document number, whether a copy was provided, whether the commitment lists it as a burden or a benefit, the instrument's own location wording, and the entries your surveyor must plot or decide. The plottable column stays empty. Your reviewer compares each sheet with the Schedule B notes on the plat you delivered.
for review
// What makes it hard
A commitment lists exceptions. It doesn't say what they do on the ground.
The standard's summary has eight possible notes. Section 6.C.ii of the 2026 ALTA/NSPS standards asks for each right of way, easement or survey-related matter in the title evidence, with its record information and whether it lies within or crosses the land, plus a note where its location is shown, can't be determined from the document, had no observed evidence, is blanket, doesn't touch the property, restricts access to an abutting right of way, is illegible, or may have been released. On a job with several parcels it also asks which parcel each one touches. ALTA's FAQ adds a narrow point: since 2021, "does not affect" speaks only to where an easement plots, never to its legal effect. The sheet offers those eight notes as blanks and fills none of them.
Not every document comes with the file. Section 4 expects the surveyor to receive recorded easements burdening and benefiting the land, and says that when those or non-public items such as highway or railroad plans are missing, the surveyor does whatever research the jurisdiction or the contract requires. The FAQ points out that some states may require a surveyor's own easement research regardless. Missouri's plat review checklist, under its boundary survey standards, scores easement locations only when requested: those on the subdivision plat and those in recorded documents the client provided. So each line reads provided, missing or illegible, and a closing list shows what someone would have to order.
Schedule B isn't always a Schedule B. Some government buyers self-insure and arrive with an owner and encumbrance report, the FAQ says; HUD may accept an attorney's title opinion in some cases; and with no insurer in the deal, a prior policy or an abstract can serve, so the surveyor should note what was relied on. Versions change as well. An easement that sat on an earlier commitment and vanishes from a later one gets the same treatment as any other the title evidence fails to list. The sheet names the evidence it read and compares each revision by exception number and instrument, so a dropped, renumbered or added line stands out.
Exceptions point both ways. An easement can benefit and burden the same land, the FAQ notes, and show up in both Schedule A and Schedule B, Part II, and it asks surveyors to raise it with the title company when their reading and the commitment part ways. Underground easements have their own edge: without information about one, the standard asks only for surface evidence seen in the field. Platted setback lines and building restriction lines, and the recorded plats, filed maps or right of way maps a survey represents, need references of their own under Sections 6.C.v and 6.C.vii. The sheet tags each line as the commitment lists it and leaves the reading to your surveyor.
Some buyers ask for more than the standard. The USDA's Natural Resources Conservation Service, in its 2018 land survey specifications for easement programs, says exceptions listed in the preliminary title commitment must be plotted and shown on the final plat. The University of Texas System's 2019 survey requirements ask the surveyor to certify that recorded easements and rights-of-way in a named commitment are labeled and plotted unless noted otherwise. Houston's easement approval checklist, dated April 30, 2025, wants each easement affecting a parcel listed with its Harris County Clerk file number, and tells surveyors to call the record that actually created a right-of-way, not only one that mentions it. Your reviewer will check that every exception number appears exactly once, that each instrument reference matches its document, and that no line was marked plottable or not without a surveyor. These are summaries of published requirements, not legal or surveying advice.
// What you send
The title papers and the notes your surveyor wrote from them
20 to 30 closed jobs
ALTA/NSPS jobs your office delivered, with a mix of simple and messy title files. Include a job with several parcels and one where the commitment changed before delivery.
The commitment and its documents
Every version of the commitment, the exception documents as they reached you, and any instruments your office pulled on its own.
Your finished Schedule B notes
The notes or table from each delivered plat, as a PDF, and any exception review sheet your office already keeps. Those are the answer key.
Copies, once the NDA is signed
Send PDFs only after signing: no CAD, field notes or point files. Nobody from Massmarket logs in to a recorder's site or calls your title contacts. A file that can't leave becomes a look-alike your reviewer helps build.
// Before it starts
Agreed before any commitment is copied
The owner signs off on these points ahead of day one.
- Your reviewer
- Named by the owner: usually the project surveyor who signs off exception notes
- Success criteria
- In writing: which entries must match, and how a missed exception counts
- Sample
- Chosen by your reviewer, several parcels and title companies included
- Who decides
- Your licensed surveyor, on every plotting call
- Price
- A range for the live job, stated before day one
// How the test is judged
Your plat's exception notes beside each sheet
| On the same 20 to 30 jobs | Your finished notes | The draft sheet |
|---|---|---|
| Every exception number present, once | Filled in on your jobs | Filled in on your jobs |
| Instrument reference matches the document | Filled in on your jobs | Filled in on your jobs |
| Document provided, missing or illegible | Filled in on your jobs | Filled in on your jobs |
| Burden, benefit or both, as the commitment lists it | Filled in on your jobs | Filled in on your jobs |
| Location wording quoted from the instrument | Filled in on your jobs | Filled in on your jobs |
| Open entries left for the surveyor, none filled | Filled in on your jobs | Filled in on your jobs |
| Changes between commitment versions | Filled in on your jobs | Filled in on your jobs |
// After a yes
About 30 days of new commitments
On your reviewer's yes, new commitments get the same review sheet for about 30 days.
Your project surveyor works every line and makes each plotting call before anything reaches a plat. The sheet stays a working paper inside your office.
Scoring continues on live jobs against the same written criteria. Another job is a separate choice.
// Possible next jobs
After exception sheets, if you want more
- 01Next
ALTA survey proposal scopes
Survey requests and lender lists read into a draft scope, so the proposal and the title review start from the same facts.
- 02Then
Plat review comment logs
A reviewing agency's comments on a plat sorted by sheet and note into one response list.
- 03After that
Deed and prior survey indexes
Older deeds and plats near a new site indexed by parcel and recording reference for your researcher.
// One hard limit
Every plotting call stays with a licensed surveyor.
The sheet reads copies and quotes what it finds. It never decides whether an exception is plottable, determines a boundary, certifies or seals a survey, or sets a fee, and it never touches CAD, field data, a live survey or a county filing. It never contacts a title company, a client or a recorder. A licensed surveyor makes every determination and seals every survey, and nothing on this page is legal or surveying advice.
Priced per job: a range before the proof of concept, a fixed price before you sign.
Rob sets the range on the call, after hearing how many title commitments your office works in a month and how often you pull the documents yourselves.
// Questions
What project surveyors ask
Does it decide which exceptions are plottable?
What if the title company didn't send all the documents?
Will it catch an exception that changed between commitment versions?
Our agency clients use title reports, not commitments. Does that work?
Can it read old recorded documents?
Does it write the notes that go on the plat?

Rob Eason, founder
// Book a proof of concept call
Start with commitments your surveyors already worked.
A 30-minute call with Rob Eason covers your firm, your role, which job you'd test and how many commitments your office works in a month. Commitments and plats stay in your hands until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
