30-min call with RobBook a proof-of-concept call
Job 03 · Rebate paperwork

// HVAC distributors · AHRI certificates

AHRI certificates for the exact outdoor unit, coil and furnace your contractor quoted.

A homeowner's rebate form wants one AHRI reference number, and it has to describe the system that went in, not the one in the brochure. A free AI proof of concept works out the matched combination for 20 to 30 quotes or orders your branch already handled, drafts the certificate request for each, and lists every line it couldn't match. Your reviewer, the person at your company who pulls these certificates today, checks each draft against the certificate your team actually sent.

Book a proof-of-concept call30 minutes with Rob
Requests tested
20 to 30, already answered
Rebates judged or filed
None
Signed before any quote moves
An NDA

// The one job

From a system order to the certificate that matches it

The request usually comes after the sale: the homeowner's utility wants the AHRI certificate. Someone pulls the quote or the order, works out which condenser or heat pump, which coil or air handler and which furnace actually shipped, finds that combination in AHRI's directory, and sends the certificate with its reference number.

For the test, AI reads copies of those quotes, orders and the certificates your team sent, and drafts the request for each system: the model numbers that make up the match, the reference number it points to, the ratings the rebate form will ask for, and every place the paperwork disagrees. A person still pulls and sends the certificate. Nothing goes to a contractor, a utility or a building department.

System orderShipped to the contractor
Contractor
Job address
Ship date
Quote ref.
ItemModel no.Qty
Made-up example order
Combination matched
for your reviewer
Certificate requestDraft, not sent
AHRI ref. no.
Model status
Cooling capacity
Furnace listed
ComponentOn the orderOn the match
Made-up example request

// The hard parts

Why the right certificate is harder to find than it looks

A certificate rates a combination, not a box. AHRI's Certificate of Product Ratings lists an AHRI type, then the outdoor unit (condenser or single package), the indoor unit (evaporator and/or air handler) and, where one applies, the furnace, and says the manufacturer is responsible for the rating of that system combination. One heat pump certificate from December 2024 is typed HRCU-A-CB, a split heat pump with a remote outdoor unit, and rates it under AHRI 210/240-2024 for cooling capacity, SEER2, EER2 at 95°F, heating capacity at 47°F and HSPF2 for Region IV. Its fine print says certified ratings hold only for models and configurations listed in the directory, so a different coil on the order means a different certificate.

The furnace is the usual surprise. AHRI's guidance for rebate requests is to give the outdoor and indoor model numbers, and the furnace only when it is the same brand as the outdoor unit; otherwise the combination is certified without it. Serial numbers don't help, because AHRI doesn't record them. AHRI's own search tips say fewer characters of a model number work better than the full string, and that on a multi-zone system the indoor type decides which record applies. The draft shows which model numbers it matched on and why a furnace was or wasn't listed.

Status changes after the quote. Every certificate carries a model status. In AHRI's definitions, a Production Stopped model is no longer made but is still sold; a Discontinued model is neither made nor sold and stays searchable for five years; an Obsolete model was pulled after an AHRI test failure and is not AHRI Certified. AHRI keeps data only on equipment discontinued less than five years ago, and a rating marked WAS was involuntarily re-rated, with the old figure printed beside the new one. Older stock can carry a status the quote never mentioned, so the draft records the status and the date it read it.

Each program reads the certificate its own way. New Hampshire's 2026 rebate form asks for the AHRI reference number and the AHRI cooling capacity, and counts tons by dividing that capacity by 12,000, up to five tons, so the tonnage comes from the certificate, not the model name. Its invoice must show the make, the condenser and indoor unit model numbers, and the install date and address. Central air conditioners there must be ENERGY STAR certified. ENERGY STAR's cold-climate heat pump criteria add a COP of at least 1.75 at 5°F, a figure the heat pump certificate above doesn't print. AHRI says it keeps no list of rebate programs, so each program's rules come from its own form.

Credits and permits ask different questions. The federal credit for central air and heat pumps required the highest CEE tier, not counting any advanced tier, and for 2025 a qualified manufacturer whose QMID went on the return; the IRS says it is not allowed for property placed in service after December 31, 2025. Some building departments want the certificate at permit: Martin County, Florida's 2026 changeout checklist asks for the AHRI form to verify SEER2 and for a changeout form that ensures matched systems. The draft lists what each program or permit asks for and where the certificate answers it. It never says that a system qualifies.

// What you send

Copies from whoever answers certificate requests

Copies, not logins
One or two equipment lines
01

20 to 30 answered requests

The contractor's request, the quote and the order or invoice behind it, and the certificate your team sent back. Include a dual-fuel system and one where the coil changed between quote and shipment.

02

The forms they were for

The utility, state or permit forms the certificates went with, so each draft is judged against what that program asked. Blank copies are fine.

03

Matchup data for your lines

The manufacturer's published rating combinations, or directory searches your team saved, for the equipment lines in the sample.

04

An NDA before any copy

Homeowner names and addresses can be masked. We never sign in to your ERP or a manufacturer's dealer site, and if files can't leave, we build look-alikes with your reviewer.

// Before it starts

Agreed before the first quote is copied

The owner settles these in writing, so the test is graded against rules nobody changes halfway.

Certificate test termsOwner signs off
Your reviewer
Named by the owner, often inside sales or the counter lead who pulls certificates
Equipment lines
One or two, picked by your reviewer
Success criteria
Which models, reference number and status must match, and how a held system scores
Sample
Coil swaps, dual-fuel jobs and older stock included on purpose
Price
A range for answering requests live
NDA
Signed before any quote, order or certificate moves

// How it's judged

Each draft beside the certificate your team sent

System by system
Against the order that shipped
On the same 20 to 30 systemsWhat your team sentThe AI draft
Outdoor unit, indoor unit and furnace read from the order, not the quote aloneFilled in on your systemsFilled in on your systems
Line sets, pads, thermostats and kits left out of the matchFilled in on your systemsFilled in on your systems
Furnace listed or left off, by AHRI's same-brand ruleFilled in on your systemsFilled in on your systems
Reference number for that exact combinationFilled in on your systemsFilled in on your systems
Model status and any re-rate notedFilled in on your systemsFilled in on your systems
Cooling capacity and ratings the program's form asks forFilled in on your systemsFilled in on your systems
Disagreements between invoice, quote and certificate listed for a personFilled in on your systemsFilled in on your systems
Blank on purpose. No cell is filled until your own requests have been through the test.Your reviewer scores every row and decides.

// After a yes

About 30 days on new certificate requests

Once your reviewer says yes against the success criteria, new requests go through the same drafting for about 30 days.

A person checks every draft, pulls the certificate from AHRI's directory and decides what goes back to the contractor.

The live month is priced as a fixed figure before you sign. Another equipment line or another job is decided and priced on its own.

// What could come next

Possible next jobs, ranked

Ideas, not a plan
Each with its own price
  1. 01

    Matched ratings on new quotes

    The certificate's ratings carried onto each system quote before the sale, so the contractor can show the homeowner the matched numbers up front.

    Next
  2. 02

    Recovered refrigerant returns

    Recovery cylinders left at the branch, logged by gas and weight for the paperwork your reclaimer asks for.

    Then
  3. 03

    Counter warranty claims

    Failed parts brought back by contractors, drafted as claims in the format each manufacturer uses.

    After that

// One hard limit

It never decides that equipment qualifies, and never files anything.

Drafts land on a review sheet. Whether a system earns a rebate, a credit or a permit stays with the program, the contractor and the homeowner. The test sends nothing to a utility, a building department, AHRI or a customer, and gives no tax advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

What sets the range: how many certificate requests your branches answer in a month, how many equipment lines you carry, and how requests reach you today.

// Questions

What the rebate desk asks

Can it tell a homeowner whether their system gets the rebate?
No. The program decides that. The draft lists what the program's form asks for, what the certificate shows and anything that doesn't line up, and a person at your branch decides what to send.
Does anyone still need an AHRI certificate for the federal tax credit?
The IRS says the energy efficient home improvement credit is not allowed for property placed in service after December 31, 2025. For earlier installs it required the highest CEE tier and, in 2025, a qualified manufacturer's QMID. The draft notes the install date and leaves every tax question to the homeowner and their tax adviser.
Will you pull certificates from AHRI's directory for us?
No. The terms printed on each certificate limit entering its contents into a computer database, so your team pulls and sends certificates as it does now. The draft names the combination and reference number to pull, and the certificate can be checked with AHRI's Verify Certificate link using its reference number, issue date and certificate number.
What if the contractor swapped the coil after the quote?
Then the quoted certificate is probably the wrong one. The draft reads the order or invoice that shipped, compares it with the quote, and holds the system when the indoor model differs, so your reviewer picks the certificate for what actually went out.
Rob Eason

Rob Eason, founder

// Book a call with Rob

Bring last spring's certificate requests.

A half-hour call with Rob. He'll ask about your company and your role, which job to test, and roughly how many certificate requests your branches answer in a month. Hold quotes and orders until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.