30-min call with RobBook a proof-of-concept call
Job 03 · Architectural review

// HOA and condo management · One job

HOA architectural review, checked against the guidelines and drafted for your committee to decide.

One job for the desk that handles architectural review requests: fences, paint colors, solar panels, additions. AI reads each application and its plans, checks every item against that community's design guidelines and the laws that limit them, and drafts the decision letter with the outcome left blank. Your reviewer compares the drafts with what your committee actually sent.

Book a proof-of-concept call30 minutes with Rob
Decided applications
20 to 30
Applications approved or denied by the AI
None
Logins to your homeowner portal
None

// The one job

An application arrives. The committee gets a finished file.

An owner wants a cedar fence, a new body color, panels on the south roof or a sunroom. The request comes through your homeowner portal, by email or on a paper form, with a plot plan, drawings, a color chip or a photo. Someone at your company checks that it is complete, pulls the right pages of that community's guidelines, sends it to the committee, watches the deadline and writes the letter once the committee decides.

For the test, AI does that preparation on copies of applications your committee already decided. It drafts the review file: what is missing, each item set against the guideline that covers it, any law that limits the answer, the due date, and a letter with the outcome line empty. We call this step the sandbox. Nothing goes to an owner or a neighbor.

Architectural applicationPortal, email or paper
Community and lot
Project
Materials and colors
Plans attached
ItemProposedShown on
Sketch only, not a real application
Checked
for the committee
Decision letterDraft, outcome open
Guideline cited
Finding
Conditions
Decision: your committee
ItemGuidelineFinding
Sketch only, not a real letter

// What makes it hard

Why an architectural decision is harder than it looks

The clock starts the day the application lands. In California, a solar application not denied in writing within 45 days is deemed approved under Civil Code 714, unless the delay came from a reasonable request for more information, and section 4745 allows 60 days for an electric vehicle charger. Section 4766, new for 2026, gives the reviewing body 30 calendar days to tell an owner rebuilding after a disaster whether the file is complete, then 45 days to review it. The draft records the date received and each request for more information, and shows the due date every rule produces.

Guidelines reach only as far as the documents. Florida's section 720.3035 limits review to what the declaration, or guidelines it authorizes, state or reasonably imply. Where the documents offer a choice of materials or designs, the committee can't narrow it. A lot has one front for setbacks unless the documents say otherwise, and a central air system out of sight that matches an approved one needs no review at all. So each finding in the draft cites its section, and a finding with no written rule behind it goes to your manager as a question, not into the letter.

Some requests can be shaped but not refused. Texas's section 202.010, which since 2025 covers solar roof tiles too, lets an association bar a roof-mounted device only for set reasons, such as rising above the roofline or a frame in a color other than silver, bronze or black; refusing one that meets those terms takes a written finding. Florida lets an association choose where on the roof solar collectors go only within 45 degrees of due south, and only if the spot doesn't impair how they work, and it must adopt hurricane protection specifications and approve requests that meet them. Federal law bars rules that unreasonably delay a satellite dish one meter or less across, and protects the U.S. flag. The draft names the rule behind each protected item and lists only the conditions still open to the committee.

A denial has to explain itself. California's section 4765 calls for a written decision; a disapproval says why and how to ask the board to reconsider, at an open board meeting. Florida wants the exact rule relied on and the part of the plan that fails it. In Texas, for associations of more than 40 lots, a denial goes by certified mail, hand delivery or electronic delivery with the reasons and any changes that would win approval, and the owner has 30 days to ask for a hearing, which the board holds within 30 days, with 10 days' notice, at a noticed open meeting. Once your committee picks an outcome, the draft adds what that state wants said.

Who decides changes by state. Texas keeps board members, their spouses and anyone in their household off the review authority, and since 2025 has the association invite volunteers at least 10 days before filling seats. Arizona does the opposite: a board member chairs the design committee. In Vantaca's architectural review voting, a vote is approve or decline only, so a conditional approval needs a later step, which Vantaca suggests giving to the committee chair or a management company employee. Your reviewer, usually the coordinator or manager who prepares these files, will look hardest at completeness, the sections cited and the protected items.

// What you send

What we need from your architectural review desk

Copies only
No portal access
01

20 to 30 decided applications

Applications from a few communities with their plans and photos, each with the letter that went out. Include a conditional approval, a denial, one returned as incomplete and one for solar or another protected item.

02

Each community's guidelines

The architectural article of the declaration, the design guidelines and any amendments, the application form and checklist, and the conditions your committees attach most often.

03

Your procedure and letters

The review procedure with its deadlines, how each committee votes, and your templates for approval, conditional approval, denial and requests for more information.

04

NDA, then owner details out

We sign the NDA before any application is copied. Black out owner and neighbor names, signatures, emails and phone numbers. Keep lot numbers, so each file can be matched to its community's rules.

// Before it starts

What your company's owner decides first

Rob and your company's owner put these in writing before any application leaves the office.

Settled in writingOwner's call
Reviewer
The owner's pick, usually the architectural coordinator or a senior community manager
Success criteria
Written: which findings, citations and dates must match, and what counts as a pass
Price
A range for the live job
Applications
Picked by your reviewer, denials and protected items included
NDA
Signed before the first file is copied

// How the test is judged

Application by application, against what your committee sent

Your letter beside the draft
one row per check
Across your 20 to 30 applicationsWhat your committee sentThe draft
Missing items caught before the committee sees the fileFilled in from your applicationsFilled in from your applications
Each finding tied to the right section of that community's guidelinesFilled in from your applicationsFilled in from your applications
Protected items named, with the conditions still allowedFilled in from your applicationsFilled in from your applications
Due date counted from the date receivedFilled in from your applicationsFilled in from your applications
Wording your state requires for the outcome chosenFilled in from your applicationsFilled in from your applications
Usual conditions carried into conditional approvalsFilled in from your applicationsFilled in from your applications
Minutes to ready one application for the committeeFilled in from your applicationsFilled in from your applications
Nothing scored yet. No application of yours has been reviewed.Your reviewer fills in both columns and decides.

// After a yes

About 30 days of new applications, every decision your committee's

With your reviewer's yes, new architectural applications for the communities you pick run through the job for about 30 days.

Each file reaches your committee or manager with the outcome still open. They choose it, edit the letter, sign it and send it the way they do now. The AI never answers an owner or a neighbor. No second job starts that month.

// Later, ranked

Where architectural review leads

Possibilities, ranked
One live job at a time
  1. 01

    Completion inspection reports

    Site photos compared with the approved plans and conditions once work is done, for the manager to sign; Arizona requires reviews like these when an association holds a construction deposit.

    Next
  2. 02

    Annual disclosure packages

    The yearly summary of what needs approval and how to apply, assembled with the other mailings each state requires.

    Then
  3. 03

    Violation letters for unapproved work

    Inspection findings checked against the approvals log first, so finished work that was approved never draws a letter.

    After that

// One hard limit

No approvals, no denials.

The AI never approves, conditions or denies an application, never decides what a community's documents or a statute require, and never contacts an owner, a neighbor or the board. It drafts with the outcome left blank. Your committee, manager or board decides, and the association's attorney answers legal questions.

Priced on its own. You get a range before the proof of concept and a fixed price before you sign.

Expect the range on the call. It turns mostly on how many applications arrive in a month and how many sets of guidelines they are checked against.

// Questions

Architectural review questions

Will the AI approve or deny applications?
No. It prepares the file: what is missing, each finding with the guideline section behind it, the laws that apply and the due date. The outcome line stays blank until your committee or manager decides, and every letter goes out over their signature.
Some of our communities have thin guidelines, or only a declaration. Does it still work?
Yes. The draft checks each request against what the documents actually say and marks the ones they don't cover, instead of inventing a standard. Whether a community's documents allow a given condition is for your manager and the association's attorney to settle.
How does it handle solar panels, EV chargers and satellite dishes?
It tags them as protected items and names the state or federal rule that limits what the committee may require. It also shows any deemed-approval deadline, such as California's 45 days for solar, counted from the day the application arrived.
Can it read plans and drawings?
It reads what the plans show and state: dimensions, materials, colors and where on the lot the work sits. It does not check engineering or the building code. That stays with the owner's contractor and the local permit office.
Which association software do we need?
None for the test. Exported applications and PDFs are enough, whether they came from Vantaca's homeowner portal, another system or a scanned paper form. We never log in to your portal, and we are not affiliated with any association software company.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring a month of decided applications.

A half-hour call with Rob. Expect questions about what your company manages, your role, the job to test and how many applications your committees see in their busiest month. No application changes hands before the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.