30-min call with RobBook a proof-of-concept call
Fasteners and class-C parts for OEMs and maintenance buyers

// AI for fastener distributors

AI for fastener distributors, tested on prints and lot files your desk already closed.

For independent distributors selling fasteners and class-C parts to OEMs and maintenance buyers. Pick one desk: RFQ lines and customer prints drafted as a quote, or the certs on an order checked against its lots before it ships. Either one becomes a free AI proof of concept on copies of 20 to 30 you already finished, with nobody logging in to your ERP, bin system or quoting tool. Whoever on your team knows that desk's work best becomes your reviewer and gives the verdict.

Book a proof-of-concept call30 minutes with Rob
Fastener distributor proof of conceptFree, one job
Open jobs
Customer print quotes, or lot and cert checks
You send
Copies of 20 to 30 closed RFQs or shipped orders, once the NDA is signed
Logins
None: no ERP, bin system or quoting tool
Never
A substitute grade accepted, or a certificate ruled sufficient
Who decides
Your reviewer, named by the owner
Price
A range first, a fixed figure before you sign

// Jobs we would test

Four jobs between the RFQ and the loading dock

Two open now
Two later, one at a time
JOB.01 · START HERE

RFQ lines and customer prints

A customer's part number and print read for the standard they describe: thread, length, grade, plating and head style. Drafted as a quote, with specials sent to your buyer and print conflicts marked.

See the customer print quotes page
JOB.02 · OR START HERE

Lot traceability and certs

The lot on each label matched to the maker's test report, the grade and the coating the order asked for, with re-packed lots that break the chain listed for a person.

See the lot traceability page
JOB.03

Bin and kanban replenishment

Bin scans and two-bin kanban cards from the plants you stock, read into a draft replenishment list for your rep. Nothing is ordered and no min or max moves.

JOB.04

Supplier price and tariff notices

Increase letters and surcharge notices from your import suppliers read against open POs and your price file, so a buyer sees which items moved before anything is repriced.

// Why these two first

One fastener line is five specifications and a lot number

A cheap part with a long name. Class-C parts are the low-value items a plant buys in the greatest variety, and a fastener makes the point: one line has to fix thread, length, grade, plating and head style before anyone can price it, and the print behind it may say something the description doesn't. Each closed RFQ sits beside the quote that answered it, so every AI draft can be graded against what your team actually sent.

The trade counts in hundreds. Fasteners are commonly sold by the hundred or the thousand, and ASME B18.2.1, the inch standard for hex bolts and cap screws, carries an appendix giving the weight in pounds of 100 steel hex cap screws for each diameter and length. A draft quote has to keep the customer's count, your box quantity and your price unit straight on the same line.

Delivery and price swing together. The National Fastener Distributors Association, founded in 1968, publishes the Fastener Distributor Index, a monthly reading drawn from surveys of North American fastener distributors. Its report tracks sales, employment, supplier deliveries, inventories and pricing, and two of those columns land on your quote desk, where last month's cost and lead time may no longer hold.

The law has its own words for you. The Fastener Quality Act calls a distributor someone who buys fasteners to resell at wholesale to unaffiliated parties in the United States, and an importer a US distributor who contracts for the first purchase of fasteners made abroad. One company can be both, depending on which container a lot came in, so your lot records have to show which it was. How the Act reaches any given part is a question for your counsel, and nothing here is legal advice.

Head marks can be looked up. The USPTO posts its Register of Active Fastener Insignia as a download, and the federal rules say records on fastener insignia are open to public inspection. When a report names one maker and a head mark suggests another, a person on your team has somewhere to check. The second job lists the maker each report names, so the question gets asked.

Inspection has written rules too. ISO 3269 sets an acceptance inspection procedure for a purchaser where no earlier agreement exists, and says it is not meant for high-volume machine assembly or specially engineered work needing more advanced in-process control and lot traceability. ISO 16426 sets quality assurance requirements for manufacturers and distributors, from raw material to delivery. Your reviewer settles which rules each account answers to. We describe them for context and give no legal or engineering advice.

One limit across both jobs. The proof of concept never touches your ERP, your bin management or quoting system, or a live quote or shipment. It never accepts a substitute grade and never decides that a certificate satisfies a requirement. Drafts stop on a review sheet, a person checks every quote and every certificate, and commercial and industrial orders are the only ones in the test.

// How the test runs

A desk, a stack of closed files, one decision

  1. Step 01

    Pick the desk, name the reviewer

    The owner names your reviewer, often the senior inside salesperson for quotes or the quality lead for certs. Written success criteria, a price range for running the job live and a signed NDA all come before any file moves.

  2. Step 02

    Copies only

    Send 20 to 30 closed RFQs with the quotes that answered them, or 20 to 30 shipped orders with their lot labels and reports. We call this step the sandbox, a free AI proof of concept run on fastener paperwork you've already closed. Files that can't leave the building get look-alikes built with your team.

  3. Step 03

    A month on new work, after a yes

    The same job runs on new RFQs or orders for about 30 days. A person approves each quote before a customer sees it and each cert check before the order ships. A second job, if you want one, is decided and priced on its own, with monthly support after that.

Every fastener job is priced alone: a range before the proof of concept, a fixed figure before you sign.

Rob sets the range on the first call from how many RFQ lines or certified orders your desk handles in a month and how many of them turn into specials.

// Questions

What fastener distributors ask first

Does the test connect to our ERP, bin system or quoting tool?
No. It works from copies and exports: RFQs, prints, quotes, lot labels and test reports. Your ERP, bin management and quoting systems are never opened, and how approved drafts would reach them is scoped and priced only after a yes.
Can the AI approve a substitute grade?
No. When a line's grade, plating or head style might be met by something else you stock, the draft says so and stops there. Accepting a substitute is a decision for your team and your customer.
We sell stock items and specials. What goes in the sample?
Both, if you sell both. Stock lines test the match against your item file, and specials test whether the draft recognizes a line that needs your buyer instead of a shelf price.
Does this check whether we comply with the Fastener Quality Act?
No. The test compares documents and lists what doesn't line up. Whether the Act or a standard applies to a part, and whether a document meets it, stays with your quality lead and your counsel.
We keep kanban bins at customer plants. Is that a job you test?
It could be, as a separate proof of concept after the first job is decided. Bin scans and kanban cards would be its own files with their own success criteria, and nothing would ever be written to your bin system.
Who should be our reviewer?
For quotes, the inside salesperson others take a hard print to. For lot and cert checks, your quality lead or whoever signs off shipments that need paper. The owner names one person, and that person's judgment against the written success criteria settles it.
Rob Eason

Rob Eason, founder

// Book a call with Rob

Start with last quarter's hardest prints.

A 30-minute call with Rob about your company and role, which desk to test and roughly how many RFQ lines or certified orders you handle in a month. Prints, quotes and reports stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.