// Environmental consulting · SWPPP inspections
SWPPP inspection reports, written up from the inspector's notes for the permittee's signatory to sign.
Your inspectors walk construction sites and industrial yards on each permit's schedule, and every visit has to become a report, often within 24 hours. In a free AI proof of concept, AI writes up copies of 20 to 30 inspections your team already filed, from the field notes, photos and rain readings, in the format each permit asks for. Your reviewer, the person who runs your stormwater work, checks each draft against the report that was signed.
- Past inspections
- 20 to 30
- Compliance calls it makes
- None
- Reports it signs
- None
// The one job
The inspector leaves the site. The report is due within a day.
An inspection leaves a checklist, photos of controls and discharge points, notes on what needs fixing, and the rainfall that set it off. Back at the office someone turns that into the report the permit asks for, in the client's form or the permit's own, lists the maintenance and corrective items, and sends it to the operator's signatory.
For the test, AI reads copies of finished inspections and drafts each report in the format of the permit that covers the site: date and inspectors, the trigger and its reading, every area and control with the inspector's observation, and each item the inspector wrote down, with the date it falls due. Nothing is signed, certified or sent. Your reviewer compares each draft with the signed report.
the signatory
// What makes it hard
Why the same visit reads differently under each permit
The trigger decides what the report has to carry. Under EPA's 2022 Construction General Permit, a site is inspected at least every 7 calendar days, or every 14 days and within 24 hours of a storm that drops 0.25 inches of rain in 24 hours or a snowmelt from 3.25 inches of snow, a figure EPA bases on NOAA's average of 13 inches of snow to an inch of rain. The 24 hours run continuously, not in business hours, and stretch to the end of the next business day only when they fall wholly outside working hours. A storm of 0.30, 0.25 and 0.10 inches over three days calls for two inspections, not three. Sites draining to sediment or nutrient-impaired waters, or to Tier 2, 2.5 or 3 waters, need both the weekly and the storm visits. A storm inspection's report must include the rain gauge or weather station reading that triggered it.
Dewatering and reduced schedules add records of their own. On each day a site discharges dewatering water, the permit wants a separate inspection that records when the discharge started and stopped, an estimate in gallons per day, any plume, sheen or foam, and photos of the water before and after treatment, the controls and the discharge point. Stabilized areas can drop to twice in the first month and then monthly, and frozen or seasonally dry periods have their own schedules, each with start and end dates written into the SWPPP. For projects covered on or after February 17, 2023, the inspector must have passed EPA's construction inspection course exam or hold a current certification that covers the permit's topics. The draft checks each visit against the schedule the SWPPP says the site is on and lists any missing photo, reading or date.
States set different numbers and words. Texas's TPDES permit, TXR150000, calls the plan a SWP3, sets inspections every 14 days and within 24 hours of the end of a storm of 0.5 inches, or every 7 days, and lets a site change schedules no more than once a calendar month, in its first five business days. The report must locate erosion, controls that need maintenance or failed, and controls still needed, and a report that finds no noncompliance must carry a certification that the site complies with the SWP3 and the permit. Inspectors there need not hold signatory authority; the report is signed under 30 TAC 305.128. The draft follows the permit your reviewer names for each site and leaves every compliance certification to the signatory.
Corrective actions run on the clock of discovery. Under EPA's construction permit, a problem that needs no new control or significant repair is fixed by the close of the next business day; one that does needs the new control working within 7 calendar days, or a written reason and a schedule. The corrective action log needs an entry within 24 hours of finding the condition and another within 24 hours of finishing the work, each signed. Whether a note is routine maintenance or a corrective action is the inspector's call. The draft carries the inspector's own label, works out the dates that follow from it, and flags any note that gives none.
Industrial yards are inspected another way. Under the 2021 MSGP, a hired inspector must be joined by at least one member of the facility's stormwater team, inspections come at least quarterly with one a year during a discharge, and the report records the date and time, the inspectors and their signatures, the weather, any discharges seen, control measures needing work, and any incidents of noncompliance. The quarterly visual assessment uses a sample taken in the first 30 minutes of a discharge at least 72 hours after the last one, examined in a clean, colorless container in a well-lit area for color, odor, clarity, solids, foam and oil sheen. Neither record goes to EPA unless asked; both feed the annual report. Your reviewer will check triggers, readings, dates, deadlines and every listed item against the report the signatory signed.
// What you send
Inspections your team already filed
20 to 30 signed reports
Inspection reports as the signatory signed them, from routine, storm and dewatering visits. Mix construction sites and industrial facilities if you serve both, and include at least one with a corrective action.
The field record behind each
The inspector's checklist or notes, the photos, and the rain gauge or weather station readings each trigger relied on.
The permit and the SWPPP pages
Which general permit covers each site, the inspection schedule its SWPPP sets, the site map, and the client's own report form if it uses one.
NDA, then copies
Nothing moves before the NDA. Site and client names can be masked, and we never sign in to an inspection app, EPA's reporting tools or a state portal.
// Before it starts
Agreed before any inspection is copied
Put in writing by the owner, or a principal who can sign off for the firm.
- Your reviewer
- Named by the owner, usually your stormwater lead or a senior inspector
- Success criteria
- In writing: which fields must match, and which items must be flagged
- Inspections
- Chosen by your reviewer, storm and dewatering visits included
- Who signs
- The permittee's signatory, never the draft
- Price
- A range for the live job, before anything moves
- NDA
- In place before any copy is sent
// How the test is judged
The signed report beside each draft
| On the same 20 to 30 inspections | What your team filed | The AI draft |
|---|---|---|
| Inspection date, inspectors and their titles | Filled in on your inspections | Filled in on your inspections |
| Trigger and the rain or snow reading behind it | Filled in on your inspections | Filled in on your inspections |
| Each area, control and discharge point with its observation | Filled in on your inspections | Filled in on your inspections |
| Maintenance and corrective items, with their due dates | Filled in on your inspections | Filled in on your inspections |
| Unsafe areas and missing photos or readings flagged | Filled in on your inspections | Filled in on your inspections |
| The permit's own report fields and wording followed | Filled in on your inspections | Filled in on your inspections |
| Compliance statements left for the signatory | Filled in on your inspections | Filled in on your inspections |
// After a yes
About 30 days on live inspections
After your reviewer says yes, new inspections get the same write-up for about 30 days.
Each report waits for your inspector to correct it and the permittee's signatory to sign it, and your team delivers it the way it does now. Corrective actions stay with the people the permit names.
The comparison runs through the whole month, and a second job starts only if you choose one.
// Later, in this order
Where inspection reports could lead
- 01Next
Corrective action logs
Log entries drafted from each report's open items, with the dates the permit sets, for the signatory to sign.
- 02Then
MSGP annual report summaries
A year of routine inspections and visual assessments summarized for a facility's annual report, for the operator to review and submit.
- 03After that
SPCC plan five-year reviews
The plan, the container list and the change records read together, for the owner and the certifying engineer.
- 04Later
Phase I ESA report sections
Descriptive sections drafted from the records review and site notes, for your environmental professional to finish.
// One hard limit
It never decides whether a site complies.
Whether a condition needs corrective action, whether a site meets its permit, and every certification belong to your inspector and the permittee's signatory. The test never signs a report, never makes your environmental professional's findings, opinions or conclusions, never submits anything to EPA or a state, and never contacts a client, lender, owner, operator or agency. It works only on copies of filed inspections. Your inspector, your environmental professional and the permittee's signatory decide and sign.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
Rob gives the range on the call, once he knows how many sites your inspectors cover, how often they go out, and how many permits and client forms you report to.
// Questions
SWPPP inspection report questions
Does the AI decide what needs corrective action?
Who signs the drafts?
Our clients are in different states. Can one test cover them?
Will it upload reports to EPA or a state portal?
Our inspectors use a tablet app. Does that matter?
Does it check whether our inspectors are qualified?

Rob Eason, founder
// Book a proof of concept call
Start with last month's inspection reports.
A 30-minute call with Rob covers your firm and role, the permits your clients hold, and about how many inspections your team writes up each week. Keep reports and site photos on your side until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
