30-min call with RobBook a proof-of-concept call
Job 02 · Inspection program

// Door and hardware distributors · Fire door inspection reports

Fire door inspection reports, drafted from field notes for your inspector to sign.

Your inspector walks a building door by door and comes back with notes and photos, and then someone has to turn those into a report for the owner and a repair quote. In a free AI proof of concept, AI drafts both from copies of 20 to 30 inspections your team already closed. Your reviewer, the person on your staff who knows this work best, compares each draft with what you actually delivered.

Book a proof-of-concept call30 minutes with Rob
Past inspections
20 to 30
Doors certified
None
Reports signed
None

// The one job

From a walk-through to a report and a quote someone can sign

An inspector walks the building with a door list, a gauge and a camera, works each fire door through its full close and latch, and writes down what passed and what didn't. Back at the office, someone types that into a report for the building's owner, line by line and door by door, then builds the repair quote from the same notes.

In the test, AI reads copies of those notes and photos and drafts the report and the quote behind it: each opening and its location, each listed item as your inspector marked it, each deficiency with its photo, and one quote line per deficiency at your own rates. Nothing is certified, signed or sent, and your reviewer sets every draft beside the report and quote you issued.

Field notes and photosWalk-through
Building
Door ID
Location
Inspector
ItemResultPhoto
Illustration, not a real inspection
Written up
door by door
Inspection reportDraft
Building
Door ID
Edition
Deficiencies
ItemResultRepair
Made-up report, for illustration

// What makes it hard

Where an inspection report goes wrong

One door, one form, and the lines move with the edition. The Kansas State Fire Marshal's Form 817, revised March 31, 2026, wants a separate form for each fire door and runs eleven pass or fail lines under the 2010 edition of NFPA 80, from open holes through gasketing. A July 2026 article in Buildings magazine lists thirteen criteria, with a legible label and door signage among them. Which version applies turns on what the jurisdiction has adopted, so your reviewer sets the edition and the form before the first draft, and every draft keeps your inspector's answer on each line.

A gap is a number on a named edge. The same Kansas form allows at most 3/4 inch under the bottom of a door, or 3/8 inch where that bottom sits more than 38 inches above the finished floor. At the top and vertical edges and between a pair, it calls for 1/8 inch, give or take 1/16, on steel and no more than 1/8 on wood, measured from the pull face. A note that says "big gap at head" can't fill that line. Pairs with a coordinator have their own line too, because the inactive leaf has to close first. The draft carries the reading your inspector wrote and leaves a line open when the notes give no number.

Hospitals split the door list. CMS memo S&C 17-38-LSC, dated July 28, 2017, requires annual inspection and testing under the 2010 edition of NFPA 80 for all fire door assemblies in health care occupancies. Non-rated doors, including corridor doors to patient care rooms and smoke barrier doors, fall outside that rule and belong in routine maintenance, and fire door deficiencies get cited under K211. So a hospital report keeps rated and non-rated openings apart, using your inspector's own call. Life Safety Code chapters for assembly, education and day care occupancies carry a separate door inspection reference, which your reviewer can add to the form.

A missing label is not a parts line. The Steel Door Institute says a removed label can't be put back, and that holes other than fastener holes count as field modifications. Intertek's field labeling page gives the usual reasons for field work: modifications, doors that left the factory without labels, incorrect labeling, labels painted over or removed. It says a certified or listed party has to do the labeling. Each quote therefore separates what your crew can repair, what gets replaced, and what needs a labeling service, and the draft sends that last kind to a person with no price on it.

The record outlives the walk-through. The Institute notes inspection records are kept three years unless otherwise specified and acceptance test records for the life of the assembly, that deficiencies get fixed without delay, and that some authorities want them addressed within 60 days. NFPA 80 doesn't name a required certificate, though DHI runs a Certified Fire and Egress Door Assembly Inspector credential. Your reviewer will watch for a line marked without a note behind it, a deficiency with no quote line, photos filed under the wrong door, and anything that sounds like a compliance ruling. These rules are summarized for context, not as code advice.

// What you send

Inspections your team already closed

Copies only
Photos screened first
01

20 to 30 finished inspections

Signed reports across several buildings and occupancies. Include a hospital or clinic if you inspect them, a building with many deficiencies, and one report your team had to correct.

02

The field notes and photos

Handwritten sheets, tablet exports or checklists, along with the photos your inspector took, so the draft reads what the office read.

03

The repair quotes that followed

Each quote built from those reports, plus the labor and parts rates your office used at the time, written as they appear in your own files.

04

Copies, once the NDA is signed

Remove any photo showing a patient, a student or a security detail before it moves. Nobody from Massmarket opens your inspection app or ERP. Files that can't leave the office get look-alikes, built with your reviewer.

// Before it starts

Agreed before any report is copied

Your owner confirms each of these before a single inspection leaves the office.

Terms for the inspection testSet by the owner
Your reviewer
The owner's pick: often your lead inspector or program manager
Success criteria
In writing: which lines must match, and how open lines count
Edition and form
Named by your reviewer, for each jurisdiction in the sample
Who decides
Your qualified person, on every result and every signature
Price
A range for running it live, given up front
NDA
Signed ahead of any copying

// How the test is judged

The report you delivered beside each draft

Door by door
against what the owner received
Across the same 20 to 30 inspectionsReport and quote you issuedDraft from the test
Openings listed, identified as on your reportCompleted on your inspectionsCompleted on your inspections
Each inspection line, as your inspector marked itCompleted on your inspectionsCompleted on your inspections
Clearance readings carried from the notesCompleted on your inspectionsCompleted on your inspections
Deficiencies with their location and photoCompleted on your inspectionsCompleted on your inspections
Repair quote lines, one for each deficiencyCompleted on your inspectionsCompleted on your inspections
Lines left open for a person, with the reasonCompleted on your inspectionsCompleted on your inspections
Time from field notes to a draft ready to signCompleted on your inspectionsCompleted on your inspections
Blank for now. Nothing goes in these cells until your own inspections have been run.Your reviewer scores it and makes the call.

// After a yes

About a month of live inspections

With your reviewer's yes, new walk-throughs get the same drafting for roughly 30 days.

Every report waits for your qualified person to review and sign it, and every quote waits for someone on your team before it reaches a building's owner.

Your reviewer keeps comparing drafts with what goes out. Any further job is a separate decision with its own price.

// Possible next jobs

After inspection reports, if you want more

Ranked, not promised
Separate prices
  1. 01

    Repair work orders

    Approved quote lines grouped by building and crew, with the parts each opening needs called out for your service manager.

    Next
  2. 02

    Next year's door lists

    Last year's openings and open deficiencies carried into a list for the next walk-through at each building.

    Then
  3. 03

    Door hardware schedules

    Draft schedules from the Division 08 section and hardware sets, if your detailers want the same kind of test.

    After that

// One hard limit

A qualified person signs every inspection.

The proof of concept never touches a live report or your detailing, estimating or ERP system. It never certifies a fire door, never decides whether an opening complies, never signs a report and never contacts a building's owner or an authority having jurisdiction. It organizes what your inspector recorded, and a qualified person on your team reviews and signs. Rules named on this page are general information, not legal or code advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call, once he knows how many buildings you inspect in a year and how many fire doors a typical one has.

// Questions

Fire door inspection questions

Does the AI inspect or certify fire doors?
No. A qualified person on your team inspects each door, makes every pass or fail call and signs the report. The draft is built only from what that person recorded.
Our inspectors use an app and some still use paper. Does that matter?
Send both kinds. Tablet exports and scanned sheets go through the same test, and a line it can't read stays open rather than being guessed. No login to the app is needed.
Which edition of NFPA 80 does the draft follow?
Whichever your reviewer names for each jurisdiction before the test starts. Editions and adopted codes vary, and this page doesn't offer code advice, so that choice stays with your qualified people.
Can it handle hospitals, where surveyors look at doors differently?
Yes, if your inspector's records mark which doors are rated. The draft keeps rated and non-rated openings apart using that marking, and it never decides a door's rating on its own.
Does it price the repair quote?
It drafts one line per deficiency at the rates your office supplied. Repairs that need a labeling service go to a person with no price on them, and someone on your team approves every quote before it goes out.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start from last season's closed inspections.

A half-hour call with Rob covers your inspectors, the kinds of buildings you walk and about how many inspections you close each year. Reports, notes and photos stay in your office until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.