// AI for tank and pressure vessel fabricators
AI for tank and pressure vessel fabricators, tested on RFQs your estimators already worked up.
For shops building storage tanks and code pressure vessels for process plants, utilities, and food and chemical makers. Begin with a customer's RFQ package read into a draft specification sheet, or with the data report package assembled from your shop records. Either one becomes a free AI proof of concept on copies of 20 to 30 jobs you have closed. Your reviewer, whoever on your staff knows that paperwork best, lays each draft beside what your team produced and makes the call.
- First job
- RFQ packages into draft specification sheets
- Also open
- Data report packages from shop records
- You send
- Copies of 20 to 30 closed jobs, once the NDA is signed
- Never touched
- Estimating, quality or ERP systems, any live quote or data report
- Code decisions
- Your quality staff and the authorized inspector, every time
- Left out
- Defense and aerospace work
- Price
- A range before the test, a fixed price before signing
// Two jobs open now
Start where a job enters the shop, or where it leaves
RFQ packages into specification sheets
A customer's RFQ package and data sheets read onto one draft sheet: design code and edition, design pressure and temperature fields, materials, nozzle schedule, corrosion allowance, inspection and stamping requirements. Whatever a person has to clarify before estimating is listed at the foot.
See the specification sheet pageData report and turnover packages
A turnover book assembled from shop records: material test reports matched to heat numbers on the plate and nozzle list, welding procedure and welder references, examination and hydrostatic test records, and the items with no record, for your quality manager and authorized inspector to review.
See the data report pageCustomer drawing comments
Marked-up general arrangement drawings and approval comments listed against the revision they were made on, with each open item named for your project engineer.
Repair and alteration records
For shops holding the National Board's R certificate: field notes, material records and test results for a repair or alteration laid out against the report's own fields, for your quality staff to complete.
// Why these two first
The paperwork at each end of a vessel job already has an answer key
Closed jobs show what right looked like. Every RFQ your estimators worked up has a sheet or estimate input behind it, and every vessel you shipped has a book that someone assembled by hand. Your reviewer can set a draft beside each one, on the same documents, and mark the differences.
The first question is which book governs. ASME Section VIII, Division 1, in its 2025 edition, covers design, fabrication, inspection, testing and certification of vessels above 15 psig and holds the rules for the U, UM and UV marks. API 650 sets minimum requirements for vertical, aboveground welded storage tanks, open-top or closed. API 620 is for large, welded, low-pressure tanks. UL 142 is limited to shop-fabricated atmospheric tanks for stable flammable and combustible liquids. AWWA D100 covers welded carbon steel tanks for water storage. Each one changes what an RFQ has to say and what your shop hands back at the end, so the test starts by naming which standard and edition a package really calls for.
A label on one job, a report on the next. UL says its Listing Mark is permanently fixed to the tank and carries the UL symbol, the word LISTED, a control number and the name of the tank construction, and that makers leak test every listed primary and secondary containment tank. A Section VIII vessel closes on a Manufacturer's Data Report instead. A shop that builds both keeps two kinds of closing file, and a sample can hold either.
Water systems write the code into their rules. The Texas Commission on Environmental Quality's construction notes for hydropneumatic tanks, revised in February 2019, want ASME Section VIII, Division 1 at 1,000 gallons and up, with a permanently attached ASME nameplate and an access port for inspection. Utah's R309-540-8 wants NSF/ANSI 61 certification and ASME certification on the same tank. A small water system's request can be as code-bound as a process plant's.
Chemical buyers answer to OSHA. Under 29 CFR 1910.119, the process safety management rule, pressure vessels and storage tanks are named as covered process equipment, the employer documents that equipment complies with recognized and generally accepted good engineering practices, and on new plants and equipment it must assure that what was fabricated suits the process. Those duties fall on the employer rather than the fabricator, and they are one reason a covered plant asks for the records it does.
Dairies and food plants bring other words. A 2025 Dairy Foods article lists insulated tanks, uninsulated tanks and silos among the equipment 3-A Sanitary Standards cover. One request may cite those next to a pressure code, another may give only a finish and a cleaning method. The draft keeps each customer's words, and your estimator decides what they mean for the job.
One limit covers both jobs. The proof of concept never touches your estimating, quality or ERP system or a live quote or data report. It never performs a design calculation, decides that a vessel meets a code, or signs or stamps anything. An estimator checks every specification sheet, and the certificate holder's quality staff and the authorized inspector make every code decision. Defense and aerospace work stays out. Nothing on this page is legal or engineering advice.
// How the test runs
Three steps, starting from jobs you have closed
- Step 01
Name the job and its judge
The owner picks the reviewer, usually the chief estimator for specification sheets or the quality manager for data reports. You get written success criteria and a price range for running it live, and the NDA is signed before any file is copied.
- Step 02
Run it on closed work
Send 20 to 30 RFQ packages with the sheets your estimators built, or 20 to 30 shipped vessels with their turnover books. Your reviewer holds each draft against what your team did, on the same documents, and that verdict settles it. Where a customer's terms keep files inside your building, we build look-alikes with you.
- Step 03
After a yes, about 30 days live
New RFQs or new vessels go through the same job for roughly 30 days, and someone on your team approves every item before it goes anywhere. Another job is a separate decision at its own price, with monthly support after that.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
Rob sets the range on the call from three counts: RFQs your estimators work up each month, tanks or vessels shipped each month, and how many customer document lists your books have to meet.
// Questions
Questions tank and vessel shops raise first
Will the AI do our design calculations?
Does it decide whether a vessel meets Section VIII?
Do you sign in to our estimating, quality or ERP system?
We build API tanks and ASME vessels. Can one test cover both?
We also build heat exchangers. Does this fit?

Rob Eason, founder
// Book a proof of concept call
Start with the RFQ that took your estimators longest.
Thirty minutes with Rob. He'll ask what you build, your role, which job you'd test first and about how many RFQs or shipped vessels you handle in a month. RFQs, drawings and data reports stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
