30-min call with RobBook a proof-of-concept call
Job 01 · Low voltage estimating

// Security integrators · The first job

Bills of material and proposals, drafted from the bid set for your estimator to check.

Low voltage estimating, tested as a free AI proof of concept on 20 to 30 bids you already sent. Devices are counted from the security plans, schedules or survey, priced from your parts list and labor units, and written into a proposal, and your reviewer compares each draft with the bid your team actually sent.

Book a proof-of-concept call30 minutes with Rob
Past bids
20 to 30
Devices placed by AI
None
System access
None

// The one job

A bid set in. A priced bill of material and a proposal out.

An estimator opens the bid set, finds the security plans and the door and camera schedules, and counts: card readers, door contacts, request-to-exit devices, the locks your bid furnishes, cameras by type, motion and glass-break sensors, panels, power supplies and cable drops. Each count becomes a line from the price book, labor goes on by device and by working condition, and the proposal adds scope, clarifications and exclusions.

In the proof of concept, AI does the same from copies: it reads the plans, schedules and spec sections, counts what they show, prices it from your parts list and labor units, and writes the proposal in your format, with every line pointing to the sheet or paragraph it came from. Nothing goes to a GC, a consultant or an end user.

Security planBid set excerpt
Door schedule
Camera schedule
Spec section
Addenda
Device tagTypeSheet
Illustration, not your bid set
Counted, priced
and written up
ProposalDraft
Bill of material
Labor
Exclusions
Clarifications
Part no.QtySource
Illustration, not a real proposal

// Where it gets hard

What a security bid has to get right

One door, three sections. When MasterFormat 2016 was rebuilt, security cabling, with its conduits, backboxes and cable trays, moved into Division 27 under 27 15 01, Communications Horizontal Cabling Applications, and power sources for electronic safety and security, from 12 to 24 volt supplies to PoE, got a category of their own. A door hardware product manager quoted in The Construction Specifier described a coordination schedule, Section 08 06 71, with a column naming the section responsible for each component of an opening. He noted that 08 71 00 may bid before the Division 28 package, which usually comes out with the electrical, and that the 28 13 00 contractor almost always makes the end-of-line terminations. So the draft lists, door by door, which items your bid carries and which sit with the hardware supplier or the electrician, as the spec assigns them.

Banned makers on federal work. Where a contract carries FAR 52.204-25, the contractor can't provide equipment that uses covered telecommunications or video surveillance equipment as a substantial or essential component of a system. The covered video makers are Hikvision, Dahua and Hytera, with subsidiaries and affiliates, when the equipment serves public safety, security of government facilities, surveillance of critical infrastructure or other national security purposes, and covered equipment found during the work must be reported within one business day. The draft flags every camera, recorder and radio line from that list; whether a job falls under the clause stays with your PM.

Spec words that change a part number. A video section may require ONVIF conformance, and ONVIF counts a product as conformant only when it is registered against a profile: Profiles D, G, M, S and T for video, A, C, D and M for access control. An access control section may call for readers that support OSDP, the SIA protocol the IEC published as 60839-11-5 in 2020. The draft carries each requirement onto its line and flags a part from your price book that doesn't show it.

Counts that look right and still miss. Horizontal cable under TIA-568 runs no more than 90 meters as a permanent link, inside a 100 meter channel with the cords, so a camera far from the nearest telecom room is a question for your designer, not a longer line on the BOM. Cable jackets follow the space: plenum-rated CMP above a plenum ceiling, riser-rated CMR in a shaft. Addenda add and delete devices after the first count. The draft flags each of these with its sheet and leaves the answer to your estimator.

What your reviewer will watch: device counts against the schedules and plans, items your bid furnishes kept apart from the hardware supplier's, labor by device and condition from your own units, the exclusions your company always writes, such as conduit, line-voltage power or patching by others, and any device the drawings don't show, which the draft never adds.

// What you send

What the test needs from your estimating desk

Won and lost bids
Copies only
01

20 to 30 past bids

Bids your estimators already sent, each with its bill of material, labor and proposal. Include some you won, some you lost, and one that changed after an addendum.

02

The bid sets or surveys behind them

The security plans, door and camera schedules, Division 28 spec sections and addenda, or the survey export and photos your sales engineer captured on the walk.

03

Your price book and labor units

An export of the parts list, assemblies and labor units your estimators priced from. If prices have moved since those bids, send the current list and we note the date on every draft.

04

An NDA first, or look-alikes

A customer's drawings can show where every camera and reader sits, so the NDA comes first and your reviewer decides which copies move. If a set can't leave your office, we build look-alike bid sets with you.

// Before it starts

Settled before the first bid set moves

Who scores the drafts, what fails one, and what the live job would cost are fixed before any drawing leaves your office.

Agreed up frontOwner signs off
Reviewer
Named by the owner. Usually the lead estimator or the sales engineer who signs off bids.
Success criteria
In writing first, including which missed devices or exclusions fail a draft
Price
A range for the live job, before the test
Bids
Chosen by your reviewer: won and lost, from drawings and from surveys
Copies
Your reviewer approves every page that leaves
NDA
Signed before any drawing or survey moves

// How it's judged

Bids, compared line by line

Your bid beside ours
on the same drawings
Same 20 to 30 bidsWhat your team sentThe proof of concept
Device counts against plans and schedulesFilled in on your bidsFilled in on your bids
Part numbers that meet the spec's requirementsFilled in on your bidsFilled in on your bids
Who furnishes each item at the doorFilled in on your bidsFilled in on your bids
Labor by device and working conditionFilled in on your bidsFilled in on your bids
Scope, clarifications and exclusionsFilled in on your bidsFilled in on your bids
Flags raised, such as covered makers or long runsFilled in on your bidsFilled in on your bids
Blank until it runs. The table stays empty until drafts exist for your own past bids.Your reviewer scores every row against the criteria set first.

// After a yes

About 30 days on live bids

Once your reviewer says yes, the same job runs on new bids for about 30 days.

Your estimator approves every bill of material and proposal before it goes to a GC, a consultant or an end user, and only your designers decide what a system needs.

You agree the live job's fixed price before signing. RMR contracts, or whichever job you choose next, get their own price, and monthly support starts once a job is running.

// Later, one at a time

What could come next

Possibilities, ranked
Each after its own yes
  1. 01

    RMR contracts

    Signed monitoring, service and cloud agreements drafted into recurring billing lines and renewal dates, checked against what is actually running.

    Next
  2. 02

    Addenda checks

    Each addendum and revised sheet compared with the bid you sent, listing devices added, deleted or changed before the number is final.

    Then
  3. 03

    Accounts from acquired integrators

    A bought company's sites, agreements and recurring lines mapped onto your own forms and billing codes before they move over.

    After that

// One hard limit

It never designs a system or places a device.

Designing a system, choosing where each device goes or what it covers, touching a live security system or a credential, and handling site security details beyond the copies your reviewer approves are all outside the proof of concept. It counts what the drawings or your survey already show. How the system fits together stays with a license holder and your client.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range depends on how many bids your team sends a month, whether they start from drawings or surveys, and how your price book and labor units are kept.

// Questions

Estimating questions

Our surveyor already builds the device list in an app. What does the test add?
The steps after the list. A survey app counts what your surveyor placed; the test checks those lines against the spec, adds power, cable and labor from your own units, and writes the proposal in your format for your reviewer to compare.
Will it add devices the drawings missed?
No. If the plans show a door with no reader or a lobby with no camera, the draft lists it as a question for your estimator. Adding, moving or removing a device is a design decision, and it stays with your designer, a license holder and the client.
Some bids come as a written scope with no device plan. Can those be tested?
They can sit in the set, but the device list has to come from your team, since choosing devices for a narrative scope is design. The test works best on bids with drawings or a survey behind them.
Which estimating software do we need?
None in particular. Send exports from D-Tools, a survey app, a spreadsheet or whatever your estimators use, with the proposals as PDFs. The test never logs in to any of them.
Will you see our customers' security layouts?
Only in the copies your reviewer approves, after the NDA. Bid drawings can show every camera and reader in a building, so your reviewer can mask anything counting doesn't need. Nothing touches a live system, a credential or a customer account.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring 30 bids, won and lost.

30 minutes with Rob. The booking form asks your company and role, the job you want tested, and roughly how many bids your team sends in a month. Hold drawings and surveys until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.