30-min call with RobBook a proof-of-concept call
Plating, anodizing, powder coat, heat treat

// AI for metal finishing job shops

AI for metal finishing job shops, starting with the traveler and the cert.

For independent commercial plating, anodizing, powder coating and heat treating shops whose customers are industrial plants and commercial vehicle builders. Start with customer POs turned into draft travelers, or with the process certification for a finished lot. Whichever you choose runs as a free AI proof of concept on copies of 20 to 30 lots you already shipped. Your shop system, your lab equipment and every live traveler and certificate stay untouched. Your reviewer, the person on your staff who knows that work best, judges each draft against what your team actually did.

Book a proof-of-concept call30 minutes with Rob
Metal finishing proof of conceptCommercial and industrial lots
First job
Customer POs into draft travelers
Also open
Process certifications for finished lots
From you
Copies of 20 to 30 shipped lots, after an NDA
Never
A live traveler or cert, or a ruling that a lot passes
Reviewer
Named by the owner before anything starts
Price
A range first, a fixed price before you sign

// Jobs we'd test

Two desks every lot has to cross

Traveler or cert first
Then one job at a time

// Why the traveler and the cert

Every lot belongs to someone else, and its paperwork says how to run it

You work on parts you don't own. The Census Bureau's industry codes define plating and anodizing shops (332813) and heat treaters (332811) by doing that work for the trade, and powder coating sits in the same family of codes. EPA's metal finishing rule uses the same idea: a job shop owns no more than half, by annual area, of the materials it finishes. So each lot lands with a customer's purchase order, that customer's print and a packing slip, and all three describe the job in their own way. Someone in your front office has to settle them before a rack gets loaded or a furnace gets charged.

Shipped lots are the answer key. A lot that already left your dock also left the traveler that ran it and the certificate that went with it. Those two records let your reviewer score an AI draft against what your team actually wrote, field by field, so nobody has to imagine what a good answer looks like.

Vehicle customers bring their own layer. AIAG publishes special process assessments for this trade: CQI-9 for heat treat, CQI-11 for plating and CQI-12 for coating, the last written as a common approach to a coating management system for automotive production and service part organizations. A customer working from those can ask for records a general industrial order never mentions, so your reviewer should pick lots from both kinds of customer.

Regulated paperwork comes later, and a person owns it. EPA's Part 433 reaches electroplating, electroless plating, anodizing, coating, chemical etching and milling and circuit board manufacture, yet it leaves out existing job shops that discharge to a sewer and fall under Part 413. Wastewater treatment sludge from electroplating is listed waste F006, except from processes such as sulfuric acid anodizing of aluminum or segregated zinc plating on carbon steel, and F010 through F012 cover heat treating residues where cyanides are used. A chrome tank controlled by a wetting agent fume suppressant has a bath surface tension limit under 40 CFR 63.342: 40 dynes per centimeter by stalagmometer, 33 by tensiometer. Which of these reaches your shop is for your permit writer or counsel, and nothing here is legal advice, which is why waste and discharge records sit last on this list.

One limit covers every job here. The proof of concept never touches your ERP, your shop system, your lab equipment or a live traveler or certificate, and it never decides that a lot passes a specification. A person checks every traveler, and quality staff sign every certificate. Defense and aerospace work stays out of the sample.

// From dock to decision

One desk, one test, then a live month

  1. Step 01

    Pick the desk and the reviewer

    The owner decides which job runs first and names the reviewer, often the front-office lead for travelers or the quality manager for certs. Written success criteria, a price range for the live job and a signed NDA are all settled before a single page moves.

  2. Step 02

    Run it on shipped lots

    Send copies from 20 to 30 lots that already left: POs, prints, packing slips and the travelers that ran them, plus the records behind each cert for the second job. Prints a customer won't let leave your building become look-alike jobs we build with you.

  3. Step 03

    A month on live lots

    After a yes, incoming work goes through the same job for about 30 days. Someone on your staff approves each item before it posts anywhere, and quality staff sign every cert. A further job, if you want one, is its own decision with its own price.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

On the call Rob sets the range from lots per month, the processes you'd include and how many customers' paperwork formats the job has to read. Monthly support follows once a job is live.

// Questions

Questions finishing shops ask first

Does the test need our shop system or ERP?
No. It runs on copies and exports of POs, prints, travelers, test records and certs, and drafts come back as files for your reviewer. Nobody logs in to your shop system, your ERP, a gauge, a furnace controller or a customer portal.
Can plating, anodizing, powder coat and heat treat share one test?
One job goes in at a time, but its sample can cross processes. If you run plating and heat treat under one roof, your reviewer can choose lots from both, so the drafts are tested on the mix your front office really sees.
Will the AI decide whether a lot is good?
No. It lines up what the order called out with what your records show and names anything missing or out of range. Accepting a lot, holding it and signing the certificate all stay with your quality staff.
Our customers' prints are confidential. Can they be in the test?
Only after the NDA is signed, and only where your agreement with that customer allows it. Prints that can't leave your building become look-alike jobs we build with you, carrying the same callouts and the same conflicts.
Will it touch our air monitoring or worker medical records?
No. OSHA's hexavalent chromium standard, 29 CFR 1910.1026, sets an exposure limit of 5 micrograms per cubic meter with an action level of 2.5, and the records it calls for are about your employees. Neither job uses them, and this answer is not legal advice.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Bring a month of shipped lots to the call.

Thirty minutes with Rob: your shop, your processes, which job you'd test first and about how many lots cross your dock in a month. POs, prints and test records stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.