// Foam fabricators · Flammability test report files
Flammability test report files, matched to the customer's requirement for your quality manager to review.
A customer asks for proof your foam meets a fire requirement. Somebody has to find the report that answers it, see what it really covers and decide whether a certificate can go out. In a free AI proof of concept, AI sets the requirement as written beside your reports and supplier certificates, naming the lot or foam grade each one covers, its date and what is missing, using copies of 20 to 30 files you have already closed. Your reviewer, the person who knows this work best, compares each draft with what your quality manager did.
- Closed files
- 20 to 30
- Test results judged
- None
- Certificates signed
- None
// The one job
A requirement on a print or purchase order becomes a side-by-side file
A print, a purchase order or a customer's material spec names a fire requirement, sometimes a rule by number and sometimes only the word compliant. Your quality manager works out which foam the part runs in, pulls the lab report and the foam supplier's certificate, checks that they describe the same grade and the same construction, and decides whether a certificate can go out.
In the test, AI reads copies of files your team has finished and drafts the comparison: the requirement in the customer's words, the report or certificate it read, the lot or foam grade that document covers, the date on it, and a not shown mark beside anything no document answers. It gives no verdict. Your quality manager's decision on each closed file is what the draft is measured against.
your records
// What the quality desk watches
Where a report and a requirement stop agreeing
A vehicle report may describe a different construction from the one you ship. FMVSS No. 302, at 49 CFR 571.302, names seat cushions, headlining, arm rests and head restraints among the occupant compartment parts it covers, and it reaches any portion of a single or composite material within a set distance of the cabin's air space. Its adhesion rule is the one a laminator lives with: a material that does not adhere to its neighbor at every point of contact is tested on its own, and one that does is tested as a composite with what it adheres to. So a bare foam report and a flame laminated part are not automatically one answer, and a layer glued only in spots raises a question of its own. The draft records the construction the report tested beside the construction the customer ordered, with the burn rate field as the report states it.
TB 117-2013 is four tests, and only one of them is about your foam. The Polyurethane Foam Association's bulletin on the California standard, whose test methods have applied to upholstered furniture sold anywhere in the United States under 16 CFR Part 1640 since June 25, 2021, describes separate tests for cover fabric, barrier materials, resilient filling materials and decking. The cover fabric test runs the fabric over a standard foam with no flame retardant in it, so a report headed TB 117 may say nothing about the foam you cut. California's bureau calls the standard a semi-composite test and says every layer of resilient filling has to meet Section 3, or a barrier has to fully encase it. The federal rule's own certification is a permanent label on the finished product, and it says these products are not subject, for that standard, to section 14(a) of the Consumer Product Safety Act, the section that otherwise calls for a certificate. The draft says which section a report covers, and a request for a federal certificate goes to your quality manager as a question.
The two trades can ask opposite things about additives. The association's transportation bulletin says a fire retardant is typically required in the foam to meet the vehicle standard. Its furniture bulletin says the California standard can be met without those chemicals, does not prohibit them, and puts two boxes on the California label: contains added flame retardant chemicals, or contains none. The bureau's FAQ adds that it has no record keeping rule of its own and recommends a quality program. One part number sold to both trades can tell two stories, so the draft shows what each file says about additives and infers nothing.
A mattress maker needs your foam to stay the foam it tested. Under 16 CFR Part 1633, prototype records list materials, components and specifications with supplier names and addresses, plus any flame retardant treatment, and are kept while the set is in production and for three years after. Quality assurance includes incoming inspection, and a component may differ from the tested prototype when the maker can show, on an objectively reasonable basis, that the set will still meet the test criteria. The smoldering rule, Part 1632, has the maker keep records on substituted core or interior materials, and its mattress pad definition takes in convoluted foam pads totally enclosed in ticking and leaves out those that aren't. The draft notes the program or prototype a file names, the grade on the supplier certificate and any note of a change.
A component certificate has its own checklist, and foam has its own flame classes. Where a certificate rests on component testing, 16 CFR 1109.5(g) lists what the certifier must receive: the part's identity, lot or batch, the rules it was tested against, method and sampling, date or date range, results and test values, who tested, any certificates, traceability records and an attestation of due care. The tested part has to be identical in all material respects to the one used. On a UL 94 line, UL's public page gives HBF, HF-1 and HF-2 as the ratings for foamed material, with calculated density taken into account, so a V-0 callout on a drawing and an HF-1 report are different classifications. Your quality manager will check that each requirement was read as written, each document tied to the right lot, grade and date, and nothing marked answered that wasn't. Each rule above is paraphrased from its public text for context, and none of it is legal or engineering advice.
// What you send
What your quality desk pulls from the file
20 to 30 closed certificate files
The customer's requirement as it reached you on a print, purchase order or spec, with the certificate or reply that went back. Include a few you had to hold, retest or turn down.
Your test reports
In-house and outside lab reports with their dates, lots and whatever construction was tested: foam alone, laminated samples and any one-off tests run for a customer.
Supplier certificates
What your foam and laminate suppliers sent, by grade or lot, along with any letters about additives or changes.
Your own rules
How old a report can be, which labs you accept, when a bare foam report may stand in for a laminate, and who signs. Your quality manager's notes are enough.
NDA first, then copies
Nothing moves until it is signed. If a customer's terms or a lab's terms keep a report on site, we make look-alike files with you instead. No one logs in to your quality system, shop system or a customer's portal.
// Before it starts
Agreed before any report is copied
Your owner and quality manager settle these first.
- Your reviewer
- The owner's pick, usually the quality manager
- Success criteria
- Agreed in writing: the fields that must match your quality manager's file, and how a not shown mark counts
- Reports that count
- Set by your reviewer: age, lab, lot or grade, construction tested
- Who decides
- A qualified person, on every result and every certificate
- Price
- A range for the live job, stated up front
- NDA
- Signed before anything is copied
// How the test is judged
Your quality manager's file beside each draft
| Across the same 20 to 30 files | Your quality manager's file | Draft from the test |
|---|---|---|
| Requirement read as the customer wrote it | Filled in from your files | Filled in from your files |
| Report or certificate matched to the requirement | Filled in from your files | Filled in from your files |
| Lot or foam grade each document covers | Filled in from your files | Filled in from your files |
| Construction tested against construction ordered | Filled in from your files | Filled in from your files |
| Date on each document | Filled in from your files | Filled in from your files |
| Burn rate, char length or class field quoted as the report states it | Filled in from your files | Filled in from your files |
| Anything no document answers, marked not shown | Filled in from your files | Filled in from your files |
// After a yes
A month on live certificate requests
If your reviewer approves, new requirements and their files get the same comparison for about 30 days.
A qualified person judges every result and signs every certificate. A person approves each file before it goes anywhere, and how approved files reach your records is decided for that month only.
// Later, ranked
Other paperwork behind the same foam
- 01Next
Foam part quote requests
Drawings and descriptions read into a worksheet, with every fire requirement pulled onto its own line.
- 02Then
Supplier certificate tracking
Incoming certificates filed by grade and lot, with gaps listed for your quality manager.
- 03After that
Softness and delamination claims
Complaints set beside the order, the cut spec, the lot and any report on file.
// One hard limit
It never judges a test result or signs a certificate.
It sets a requirement beside your documents and says what they show and what they don't. It never decides that a foam or a part passes, never picks a foam, never sets a price, and never signs or issues a certificate. It never touches your shop or quality system, a customer portal, a live quote or a live certificate. A qualified person makes every call and signs every record. Defense and aerospace work stays out, and none of this is legal or engineering advice.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
The range depends on how many certificates or report requests your quality manager handles in a month and how many foam grades sit behind them.
// Questions
Report file questions
Will it say whether a report is good enough for this customer?
Our report is on foam alone and the part is laminated. What does the draft do?
What if a customer just asks for a certificate of compliance and names no rule?
Can it read outside lab reports and supplier certificates?
We have reports older than our own rule allows. Does that matter?
Will it send certificates to our customers?

Rob Eason, founder
// Book a proof of concept call
Bring the last 30 certificates you sent.
Half an hour with Rob about your shop, your role, the fire requirements your customers name most often and roughly how many report requests your quality manager handles each month. Reports and certificates stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
