30-min call with RobBook a proof-of-concept call
Job 02 · Inspection office

// Fire protection contractors · The second job

Every inspection report read for gaps before it leaves your office.

Inspection report review for sprinkler, fire alarm and extinguisher work, tested as a free AI proof of concept on 20 to 30 reports your inspectors already turned in. AI reads each report against its form, the building's earlier reports and the systems on record, then lists what looks missing or out of line. Your inspection lead compares those flags with the fixes your office actually asked for.

Book a proof-of-concept call30 minutes with Rob
Past reports
20 to 30
Reports changed by AI
None
System access
None

// The one job

A report comes in from the field. Someone reads it before it goes anywhere.

An inspector closes out an annual visit at a mid-rise office: a wet riser and a dry system for the loading dock, a fire alarm panel with a few hundred devices, and forty extinguishers. Before the report goes to the property manager and, in many places, to the jurisdiction, someone in your office reads it for blank lines, readings that look off, device counts that don't add up and problems mentioned in a comment but never listed.

In the proof of concept, AI reads the same reports and writes a review sheet for each one: every line it thinks needs another look, the reason, and the earlier report or form item it compared against. It never edits the report, signs it or decides whether a system passes. Your inspection lead checks the flags against the corrections your office really asked inspectors to make.

Completed reportInspector's copy
Property
System type
Riser or panel
Signed
ItemResultReading
Illustration, not one of your reports
Read against
the last report
Review sheetDraft flags
Report
Compared with
Form
Flags
LineFlagReason
Illustration, not a real review

// Where it gets hard

What a careful reader catches that a checklist misses

The form wants numbers and cross-references, not just checkmarks. California's Title 19 wet pipe report, Form AES 2.1, shows how much a single page asks for: the main drain test by riser as initial static, residual and final static pressure; a waterflow alarm time measured against a 90-second maximum; a recalled-sprinkler line that fails if any are present; and a field-service test line marked F until the lab results come back. Each finding is coded D for deficiency or C for comment, and the inspector signs that the equipment is fully operable except as noted. The draft checks that every line has a result, that every F has a deficiency behind it, and that nothing described as a problem in a comment is missing from the deficiency list.

A reading means little without last year's. NFPA 25's main drain test is annual, and quarterly where a system's only supply runs through a backflow preventer or pressure-reducing valve. Residual pressure is compared with the acceptance test where one exists and with recent results; a drop past the standard's threshold means someone has to find the cause. Dry pipe reports carry the valve's trip time and trip air pressure, and on California's five-year forms, pressure gauges come up for calibration. The draft sets each reading beside the building's earlier reports and flags a drop or a missing comparison for your inspector to explain, without saying what it means.

Alarm reports carry the whole visit. NFPA 72's System Record of Inspection and Testing, in its 2013-edition form, is filled in by the testing contractor during the test. It records the monitoring organization and account, who was told before and after testing, with times, battery capacity in standby hours and alarm minutes, supervising station signal and restoration times, and device test sheets for every initiating device and notification appliance. Defects left uncorrected get their own section, and the owner's representative signs to accept the report. Smoke detector sensitivity is checked within a year of installation and every other year after, stretching to as long as five years only when results stay in range and nuisance alarm records are kept. The draft compares device counts with last year's sheets and flags a missing section, a detector due for sensitivity testing with no result, or an unsigned acceptance.

Extinguisher tags and filings have their own rules. Under NFPA 10, the annual maintenance tag shows the month and year, the person and the company. Stored-pressure units on a 12-year hydrostatic cycle, such as dry chemical units, are emptied for an internal examination every six years and get a metal label punched with the month and year; nonrechargeable units leave service 12 years after manufacture. Where your jurisdiction collects reports through The Compliance Engine, your office pays a filing fee with each report, types in the deficiencies and updates them once corrected; St. Charles, Illinois lists 19 system types in its program. The check in this test happens before any filing, inside your office.

What your inspection lead will look for first: flags that match the corrections your office actually requested, gaps the draft missed, false alarms on lines that were fine, readings compared with the wrong earlier report, and any flag that strays into judging whether a system is compliant.

// What you send

What the test needs from your inspection office

20 to 30 reports
Copies only
01

20 to 30 completed reports

Sprinkler, alarm, extinguisher and hood reports as first turned in, from several buildings and inspectors, on the forms they really use.

02

What happened to each one

The corrected version where your office sent a report back, any report a jurisdiction returned, and a short note on what was fixed and why.

03

The building's history

The prior one or two reports for each building, plus device lists, riser counts and acceptance test results where you keep them.

04

NDA first, look-alikes if needed

Reports show your customers' buildings and their weak spots, so the NDA comes before anything moves. Where an owner won't allow copies, we rebuild reports as look-alikes with your inspection lead.

// Before it starts

Settled before the first report moves

Before anything is sent, the owner names the judge and the pass mark.

Review test termsOwner signs off
Reviewer
Named by the owner. Often the inspection manager or a senior inspector who reads reports today.
Success criteria
Written down first, including how missed gaps and false flags count
Reports
Read only, never edited or signed by AI
Price
A range for the live job, before the test begins
NDA
Signed before any report moves

// How it's judged

The draft's flags beside the fixes your office asked for

Report by report
Flag by flag
Same 20 to 30 reportsYour office's correctionsThe proof of concept
Blank or unanswered form linesFilled in from your reportsFilled in from your reports
Fails with no deficiency listedFilled in from your reportsFilled in from your reports
Readings checked against earlier reportsFilled in from your reportsFilled in from your reports
Device and riser counts against the recordFilled in from your reportsFilled in from your reports
Extinguisher service dates and labelsFilled in from your reportsFilled in from your reports
Flags that turned out to be wrongFilled in from your reportsFilled in from your reports
Left blank on purpose. Nothing appears here until your own reports have been read.Your inspection lead marks each row against the criteria agreed first.

// After a yes

About 30 days on reports from the field

After your inspection lead's yes, the job runs for about 30 days on reports as inspectors turn them in.

Each review sheet goes to a person, never to the customer or the jurisdiction. The inspector who wrote the report makes any correction and signs it as before; the draft only points at the line and says why.

The live job is signed at a fixed price agreed after the test. Deficiency quotes, if they aren't already running, or another job get their own price, and monthly support starts once a job is live.

// After report review

What could come next

Ranked possibilities
Each after its own yes
  1. 01

    Deficiency quotes

    The deficiencies on each reviewed report drafted into a priced repair quote for your service manager.

    Next
  2. 02

    Filing checklists by jurisdiction

    Each jurisdiction's report forms and filing steps gathered per building, so the office knows what each report must carry before it is filed.

    Then
  3. 03

    Building system records

    Device lists, riser details and acceptance results pulled from years of reports into one record per building.

    After that

// One hard limit

It reads reports. It never signs, certifies or changes one.

Reading is all it does. It never signs, certifies or alters an inspection report, never judges a system impaired or compliant, and never designs a system or runs hydraulic calculations. Your inspectors and licensed staff decide those, and the authority having jurisdiction rules on compliance. The draft lists what looks missing and leaves every answer to them.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range comes on the call, once we know how many reports your office reads each month and how many kinds of form your inspectors use.

// Questions

Report review questions from inspection managers

Will the AI correct or sign our reports?
No. It writes a separate review sheet that points at lines and says why. The inspector who did the work makes any change and signs the report, exactly as they do now.
Can it tell us whether a system passed?
No. Whether a system is compliant or impaired is your inspector's call on site and, beyond that, the jurisdiction's. The draft can say a reading dropped from last year or a line is blank, and stops there.
Does it file reports with The Compliance Engine or our fire marshal?
No. Filing, fees and deficiency updates stay with your office. The review happens before a report is filed, so the people who file it see the flags first.
Our inspectors use NFPA forms, state forms and the forms in our software. Which do you need?
Whichever they actually fill in. A fair test mixes them, because a gap looks different on a state form than on a software checklist, and the success criteria can cover each form type.
How do you know what the draft should have caught?
From your own history: reports your office sent back to an inspector, or that a jurisdiction returned. Your inspection lead scores the draft's flags against those, and against reports that needed no fixes.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring the reports your office sent back.

30 minutes with Rob, who will ask about your company, your role, the job to start with and about how many reports your office reads each month. Hold reports back until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.