30-min call with RobBook a proof-of-concept call
Job 04 · After a deal closes

// Engineering firms · For firms that buy firms

An acquired firm's open projects, mapped onto your setup before they bill.

When you buy a firm, its open contracts arrive with their own project numbers, phases, rate tables and billing habits. This tests whether AI can map each open project onto your projects, phases and billing terms, and list every gap for your integration lead, on copies of 20 to 30 projects from a deal you already integrated. Your reviewer, the person who knows that integration best, checks each map against how your team set the project up.

Book a proof-of-concept call30 minutes with Rob
Projects from a past deal
20 to 30
Contracts changed
None
Invoices sent
None

// The one job

The deal closes. The seller's projects need a home in your books.

Someone on your team pulls the seller's project list, contracts and billing history. They decide where each project lands in your structure, rebuild its fee and rates, carry over what has already been billed, and work out what happens to time that was never invoiced. Until that is done, the acquired projects either can't bill or keep billing from the old system.

For the proof of concept, AI takes the first pass on copies. For each project it drafts the setup in your terms: project and phase numbers, billing terms by phase, the labor categories and rates it needs, opening figures, and a gap list. It writes into no system and changes no contract.

Seller's projectExport and contract
Contract
Phases
Rate table
Billed to date
PhaseFeeUnbilled
Illustration, not a real project
Mapped
and checked
Setup and gap listFor your integration lead
Your project no.
Billing terms
Labor categories
Gaps
ItemMaps toGap
Illustration, not a real setup

// What makes it hard here

Two firms' habits, one set of books

The structures rarely fit. Ajera lets a project carry as many as six levels of phases, and uses invoice groups when one project goes out as more than one invoice, for a joint venture or a phase of additional services. Vantagepoint allows three levels, project, phase and task, with phase and task IDs of seven characters at most. It bills at the project level, though each phase and task can carry its own billing terms. So a seller's deep phase tree has to fold into fewer levels, and a project that went out as two invoices needs a decision about how it bills on your side. The map shows every fold and the reason for it.

Rates belong to contracts, not to firms. The seller's open contracts carry rate schedules it negotiated, often keyed to its own job titles, and those rates keep billing as signed even where your standard rates differ. In Vantagepoint, an employee's labor category comes from the Labor Category field on their employee record unless the project's own category table says otherwise. Each acquired employee therefore needs a category that lines up with the classifications on the contracts they work, so the signed rates apply to their hours.

Who the contract is with can change. After an asset purchase, a federal contract does not simply move to the buyer. Under FAR 42.1204 the government may recognize a successor in interest through a novation agreement, and federal law otherwise bars transferring the contract. A stock purchase in which the contracting company stays the same needs no novation. State DOTs have their own steps. Florida's DOT asks firms to tell it before a merger or acquisition happens, to protect prequalification, and notes that the last overhead audit described the firm's cost pools from before the deal. Under its Rule Chapter 14-75, a reorganized firm prepares projected rates. The map records each contract's status, because invoices follow it.

Opening figures and unbilled time. Each project needs its fee, what has been billed against it, any retainage the client still holds, and the work done but not yet invoiced. Unbilled hours are the hard part. Some go out on the seller's final invoice, some carry over to bill on yours, and some get written off; those are your integration lead's calls, and the gap list names each one. The integration has a cost rule of its own, too. The AASHTO Uniform Audit and Accounting Guide, used by state DOTs to audit overhead rates, treats the cost of planning or carrying out a merger or acquisition as unallowable, so time spent on the deal stays out of the overhead pool.

What your reviewer will watch. Does every open project land somewhere, with each phase's billing method intact? Do the contract rates survive, tied to the right labor categories? Do fee, billed to date and retainage tie to the seller's records? Is every unbilled hour listed, with the decision left open? And is each gap stated plainly instead of quietly filled with your defaults?

// What you send

One deal you already integrated

Copies only
Neither firm's system touched
01

20 to 30 converted projects

Open projects from a firm you bought, as the seller kept them: project lists, phase structures, fee and billed-to-date reports, rate tables and unbilled detail.

02

Their contracts

The contracts and amendments for those projects, with any public contracts that carry approved rates or labor classifications.

03

How your team set them up

The projects, phases, billing terms and opening figures your team created, and the issues list it kept along the way. The drafts are checked against these.

04

NDA, then copies

Nothing moves before the NDA, and nobody signs in to either firm's system. If client contracts can't leave the building, your reviewer helps build look-alikes.

// Before it starts

Agreed before any project is copied

Whoever signs for the firm decides these first, in writing.

Before the proof of conceptOwner signs off
Reviewer
The owner's pick, often the integration lead or the controller
Success criteria
Written down, for example every open project mapped and every gap named
Deal
One past acquisition, picked by the reviewer
Price
A range for the live job, given up front
NDA
Signed before the first file

// How the test is judged

Your team's setup beside each draft

Project by project
against what your team built
On the same 20 to 30 projectsWhat your team set upThe AI draft
Project and phase structure on your sideMeasured on your projectsMeasured on your projects
Billing terms by phase, as the contract readsMeasured on your projectsMeasured on your projects
Contract rates and labor categories carried overMeasured on your projectsMeasured on your projects
Fee, billed to date and retainage tied to the seller's recordsMeasured on your projectsMeasured on your projects
Unbilled time listed, with the decision left openMeasured on your projectsMeasured on your projects
Gaps your team found that the draft missedMeasured on your projectsMeasured on your projects
Time to set up one projectMeasured on your projectsMeasured on your projects
No results yet. Every cell waits for a proof of concept on a deal you already closed.Your reviewer fills them in, and that judgment decides it.

// After a yes

About 30 days on live projects

A yes from your reviewer moves the job onto live work for about 30 days: the open projects of your next acquisition, or ones still waiting from a recent deal.

Each draft setup waits for your integration lead to approve it before anyone enters it in your system. Contracts, invoices and anything that goes to a client or an agency stay with your team.

No second job starts until those 30 days are over.

// Later, in this order

What could follow the integration

Options to rank with you
Each quoted on its own
  1. 01

    Project invoicing

    The newly mapped projects billed from timesheets and expenses in each client's format, for your billing lead to check.

    Next
  2. 02

    Subconsultant invoices

    The seller's open subconsultant agreements checked invoice by invoice against their phase fees before the costs bill through.

    Then
  3. 03

    Proposal material from both firms

    Resumes and project descriptions from the acquired firm merged into the library your marketing team draws on.

    After that

// One hard limit

It never changes a contract or sends an invoice.

Contracts, novations, rate changes and every invoice stay with your people. The test reads copies of one past deal's projects and writes a map and a gap list for your reviewer. It signs in to neither firm's system and contacts no client or agency.

Priced per job. A range before the proof of concept, a fixed price before signing.

The range follows from the call: how many firms you expect to buy, and roughly how many open projects each one brings.

// Questions

Questions about acquired projects

We haven't closed our next deal yet. Can we still test?
Yes. The test runs on a deal you already closed, where your team's setup is the answer key. If you have not bought a firm before, your reviewer can help build look-alike projects from your own records instead.
The seller used Ajera and we use Vantagepoint. Does that matter?
Not for the test, which works from exports and contracts. It matters to the map, because the two structure projects differently, and each draft shows how the seller's phases fold into yours.
Will the AI decide what happens to unbilled time?
No. It lists every unbilled entry it finds with the hours, the phase and the contract terms that apply. Whether that time bills on the seller's final invoice, carries over or is written off is your team's call.
What about federal and DOT contracts?
The map marks each one with what the contract file shows, such as whether a novation is needed after an asset purchase. Anything filed with an agency stays with your contracts staff and counsel.
Do you keep the seller's rates or switch them to ours?
Neither by default. The draft keeps each contract's signed rates and shows where your standard rates would differ. Whether to renegotiate is for your principals and the client to decide.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring the last firm you bought.

A 30-minute call with Rob covers your firm and role, the deal you would test on, and roughly how many open projects it brought. Hold the contracts and exports until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.