// Electronics manufacturers · BOM quoting
BOM quoting, drafted the way your team scrubs and costs a BOM.
For EMS providers and contract electronics manufacturers. One job, tested on RFQs your team already answered. Each AI draft scrubs the customer's BOM into manufacturer part numbers, flags lifecycle risk, works out buy quantities and counts the assembly cost from your own rates. Your quoting lead checks every line, sets the price and decides whether to bid.
- Past BOMs
- 20 to 30
- Part data
- As saved with each quote
- System access
- None
// The one job
A BOM arrives. A costed BOM comes back.
An OEM sends a spreadsheet of parts, usually with Gerbers, an assembly drawing and three or four build quantities. Before anyone can price it, someone turns every line into a part you can actually buy, checks what is going away, works out how many to order at each quantity and counts what your machines and people will do to the board.
In the proof of concept, AI works through copies of BOMs you already quoted and returns a costed BOM laid out the way your team builds one: scrub notes, the part chosen and its alternates, lifecycle status, buy quantity, then the assembly and NRE lines. Every price and lead time names the saved quote data it came from, and a line with nothing behind it stays blank.
from your saved data
// What the scrub catches
Where a BOM quote goes wrong
The BOM disagrees with itself. The quantity on a line should equal the number of reference designators beside it, and on customer BOMs it often doesn't: R14 through R22 listed with a quantity of eight, or a part marked DNP still counted. Some lines carry only a description, such as a 10k 0402 resistor, and some put a distributor's stock number where the manufacturer part number belongs. The draft fixes nothing silently. Each line it touched shows what the customer wrote, what the draft read and why, and a part it had to choose is marked as a proposal for the OEM.
A part can be active today and gone by the build. Lines get flagged as not recommended for new designs, end of life with a last-time-buy date, or obsolete. Suppliers announce discontinued parts in notices that often cite JEDEC's JESD48; one discrete maker's notices allow six months to place a last order on a multiple-source part, nine months on a sole-source part, and a year from the notice for delivery. The draft carries the status and any last-order date your team saved with the quote, and offers alternates from your approved vendor list or the OEM's. A part on neither list becomes a question for the OEM.
Buy quantity is not BOM quantity. Quantity per board times the build is only the start. Small chip parts lose pieces to the tape leader that feeds the placement machine, so assemblers add attrition, and one published model asks for a hundred or more extra pieces of an 0402 or larger chip part. The total then rounds up to the supplier's minimum, package or reel, and a full reel can cost less than the cut tape it replaces. Trade guidance has long told EMS shops to name minimum-buy, non-cancelable non-returnable and reeled material in the first quote, because someone ends up owning the leftovers. The draft shows each step and the price break it landed on at every build quantity.
Assembly cost is counted off the board. The draft counts SMT placements on each side, through-hole parts and whether they go through wave, selective solder or hand work, BGAs that need X-ray, press-fit connectors and areas to mask before conformal coat. Test changes the NRE: a flying probe needs no fixture, while in-circuit test needs a bed-of-nails fixture built for that board. A stencil for each pasted side, machine programming and first article each get a line. Rates and minutes come from your quoting rules, and the bare board is priced only from a fab quote you send, at the IPC-6012 class and finish the fab drawing calls out.
Your reviewer. The owner names the person who knows your quoting best, often the quoting manager or a senior buyer. They hold each draft against the costed BOM that went out: every part chosen, every flag, every buy quantity, the assembly and NRE lines and each question put to the OEM. Include a BOM with consigned parts, one with an obsolete line and one box build, if you quote them.
// What you send
What your quoting team pulls together
20 to 30 RFQ packages as they arrived
Each customer's BOM in its own layout, with the Gerbers, assembly drawing, build quantities and notes that came with it. Add a few you lost or passed on.
The costed BOMs behind your quotes
Your scrubbed BOM for each RFQ, with the part chosen per line, alternates, prices, lead times and lifecycle status as your buyer saw them, plus the quote that went to the OEM.
Your quoting rules
Placement and through-hole rates, labor for test and box build, your attrition table, markup rules and the NRE lines you charge, exported from CalcuQuote, Cetec ERP, Epicor Kinetic or your own workbook.
An NDA before any BOM moves
Signed first, because a BOM and its Gerbers describe the customer's product. No login to your ERP, your quoting tool, an Octopart or SiliconExpert account, or any distributor portal.
Look-alike BOMs if files must stay
When an OEM's agreement keeps its files in your building, we build look-alike BOMs with you that keep the same kinds of messy lines, consigned parts and status flags.
// Before it starts
Agreed before the first BOM is copied
The owner and your quoting lead sign off on each of these before any customer file is shared.
- Your reviewer
- Named by the owner, often the quoting manager
- Success criteria
- In writing: lines that must match, and how flags are scored
- Part data
- Only what your team saved with each quote
- Price
- A range for live BOM quoting, given before the test
- RFQs
- Commercial programs your reviewer picks, lost bids included
// How it's scored
Your costed BOM, beside the draft
| Compared on the same BOMs | What your team sent | The AI draft |
|---|---|---|
| Time from BOM received to costed draft ready for review | Filled in from your BOMs | Filled in from your BOMs |
| Scrub fixes: quantity against reference designators, DNP lines, missing part numbers | Filled in from your BOMs | Filled in from your BOMs |
| Manufacturer part number chosen per line, and alternates proposed | Filled in from your BOMs | Filled in from your BOMs |
| Lifecycle flags: NRND, last time buy, obsolete | Filled in from your BOMs | Filled in from your BOMs |
| Buy quantity with attrition and rounding to package or reel | Filled in from your BOMs | Filled in from your BOMs |
| Assembly lines: placements per side, through-hole, test and NRE | Filled in from your BOMs | Filled in from your BOMs |
| Questions for the OEM your quoting team also asked | Filled in from your BOMs | Filled in from your BOMs |
// After a yes
About 30 days on new RFQs
After a yes, each new RFQ gets a draft costed BOM as it arrives, for about 30 days.
Your quoting lead checks every line, sends any alternate to the OEM for approval and sets the price, then sends the quote from your own system. Scoring carries on through the month, so the live run is judged the same way the test was.
// Later, ranked
Where BOM quoting could lead
- 01Next
Engineering change orders
A revised BOM held against the current revision, with every job, stock bin and open PO it touches listed for your engineer.
- 02Then
Compliance declarations
RoHS, REACH and conflict minerals replies for a customer's assembly, built from your component suppliers' declarations for your quality lead to sign.
- 03After that
Last-time-buy notices
A supplier's discontinuance notice matched to each customer BOM that uses the part, with a note to every OEM drafted for your program manager.
// One hard limit
It never approves a part substitution.
An alternate outside the OEM's approved list is a proposal until the OEM says yes. Whether to bid, the margin, the lead time you promise and the final price stay with your people, and a line with no saved data stays blank. BOMs from defense, aerospace or ITAR-controlled programs never come in.
BOM quoting is priced as a job of its own: a range before the test, and a fixed price before you sign.
The range depends on how many RFQs arrive each month and how many lines a typical BOM carries.
// Questions
BOM quoting questions from EMS shops
Does it check live distributor stock and pricing?
Our customers' BOMs have no standard layout. Can it handle that?
Will it pick parts for lines that give only a description?
Does it price the bare board?
Will it send quotes or questions to our customers?

Rob Eason, founder
// Book a proof of concept call
Test it on BOMs your team already costed.
Thirty minutes with Rob. The booking form asks for your company and role, the job you want tested and roughly how many RFQs arrive each month. Keep BOMs and Gerbers back until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
