// For commercial painting contractors
AI for commercial painting contractors, tested on bids you already priced and logs your crews already kept.
For subcontractors painting offices, schools and hospitals and coating steel, tanks and bridges for owners and public agencies. Start with bid sheets from the paint finish schedule, or with the daily coating log a public owner expects after every shift. Either one becomes a free AI proof of concept on copies of 20 to 30 bids or logs your team already finished, with nothing connected to your estimating or job cost system. Your reviewer, the person on your team who knows that work best, sets each draft beside what your people did.
- First job
- Finish schedule bid sheets, or daily coating logs
- You send
- 20 to 30 finished bids or logs, copied after an NDA
- We touch
- No estimating or job cost system, and no live bid or log
- Never
- Calls a surface ready, a reading acceptable or a coating compliant
- Reviewer
- Named by the owner, often your chief estimator or coating foreman
- Left out
- Certified payroll
- Price
- A range first, then a fixed price
// Jobs we would test
One desk writes the number, one crew writes the record
Bids from the paint finish schedule
The finish schedule, door and frame schedule and painting section read into a draft bid sheet by surface and system: wall and ceiling codes, primer and coat count, gloss, doors and frames, exposed structure and wall-covering exclusions, with every room or surface the documents disagree on listed for your estimator.
See the bid sheets pageDaily coating inspection logs
A crew's field records compiled into the log a public owner asks for: surface preparation standard, ambient conditions and dew point, batch numbers, wet and dry film readings by coat and location, and every entry that is missing, for your coating foreman or inspector to review.
See the coating logs pageExtra work tickets
Field tickets and directives for work beyond the painting section gathered into one record per item, for your project manager to price.
Installed coating schedules at closeout
The list some owners want at the end of a job: manufacturer, product, primer and top coats, number of coats, application method and colors by location, assembled from submittals and field records.
// Why these two first
Paint gets judged two ways, and each way leaves a paper trail
One industry code, two kinds of work. NAICS 238320 covers establishments primarily engaged in interior or exterior painting or interior wall covering, and the examples published with it include bridge painting. A school corridor and a steel girder share that number, yet almost nothing about their paperwork matches, so this page offers two places to start.
The trade's own standard draws that line. PCA P13, from the Painting Contractors Association, says architectural paint on interior surfaces should be accepted as a properly painted surface, the test its P1 standard defines, and names dry film thickness as a criterion for industrial protective coatings, linings and exterior paints. One side of your shop answers to a finish schedule and the other to numbers in a log.
One word can add a coat to every wall. MPI's interior painting guide, revised April 2022, separates Custom Grade, typically one primer and one finish coat, from Premium Grade, typically one primer and two finish coats, and asks that the finish schedule show where each applies. Texas State University's paint standard sets its work at MPI Premium Grade unless otherwise specified. Your estimators have already read that word and carried the labor for it, so each old bid arrives with its answer attached.
The surface belongs to someone else until you start. PCA P4 makes the contracting entity responsible for deciding that a surface is complete and ready for finish. The painter inspects only for reasonable and visible evidence that the finish will adhere, and halts work until directed if unacceptable work isn't corrected. How that applies depends on your contract, and nothing here is legal advice, but who accepted what is exactly what exclusions and daily entries have to show.
Public steel adds a gate before the first blast. Illinois DOT's provision for cleaning and painting existing steel structures, revised October 17, 2025, asks the painting contractor for SSPC-QP1 certification, plus SSPC-QP2 on lead abatement work, unless the plans say otherwise. Whoever manages its quality control must show a named inspector credential and three comparable bridge inspections from the last two years.
Water tanks write a cost into the specification. New York State's 2024 master specification for steel water storage tank painting calls for compliance with AWWA D102, Coating Steel Water Storage Tanks, and NSF 61 for materials touching potable water. It makes dehumidification equipment mandatory, tells bidders to carry its rental, fuel and running costs, and keeps the tank from being filled until the owner's representative has observed the cure and holds the contractor's letter certifying it.
The limit on both jobs. The proof of concept works on copies. It never touches your estimating or job cost system or a live bid or log, and it never decides that a surface is ready to coat, a reading is acceptable or a coating meets a specification. An estimator checks every bid sheet, a qualified foreman or inspector signs every log, and certified payroll stays out.
// How the test runs
One desk or one crew, then a decision
- Step 01
Name the job and the judge
The owner picks the reviewer, usually the chief estimator for bid sheets or the coating foreman or QC lead for logs. You agree the success criteria in writing and hear a price range for the live job, and only then, with the NDA signed, does a file move.
- Step 02
Run it on finished work
Send copies of 20 to 30 bids with their schedules and sections, or 20 to 30 signed logs with their field records. Our name for this stage is the sandbox, a free AI proof of concept run only on paper your team already finished. Anything that can't leave the office becomes a look-alike we build with you.
- Step 03
A month on live work, after a yes
New finish schedules or new shifts go through the same job for about 30 days, and a person approves each item before it goes anywhere. The next job, if you want one, gets its own price, with monthly support after that.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
Rob gives the range on the call, once he knows how many bids you price in a month, how many logs public owners expect, and whether steel, tanks or bridges are in the mix.
// Questions
Questions painting contractors ask early
Does the test need our estimating or job cost software?
We paint offices and also coat steel. Which job should come first?
Will the AI decide a surface is ready or a coating passed?
Does it handle certified payroll on our public jobs?
Can we test on repaints in occupied schools and hospitals?

Rob Eason, founder
// Book a proof of concept call
Start from last quarter's bids or last season's logs.
A half hour with Rob on your company, your role, the desk you'd test first and roughly how many bids or logs you turn out in a month. Schedules, specifications and field records stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
