30-min call with RobBook a proof-of-concept call
Job 01 · Estimating

// Commercial flooring contractors · Takeoffs

Takeoffs from the room finish schedule, by product and room, with every mismatch listed for your estimator.

Commercial flooring takeoffs, tested as a free AI proof of concept on copies of 20 to 30 jobs your estimators already took off. AI reads the room finish schedule, the floor plans and the Division 09 sections and drafts a quantity by product and room: finish codes, base and transitions, patterns and attic stock, plus every room or code that shows on one document and not the other. Your reviewer, the estimator who knows your takeoffs best, compares each draft with the takeoff your team carried.

Book a proof-of-concept call30 minutes with Rob
Past jobs
20 to 30
Prices set by AI
None
Logins to your estimating system
None

// The one job

From the finish schedule to a quantity your estimator can check

On an office fit-out, a school wing or a hospital floor, the room finish schedule lists each space by number with a code for its floor and its base, and a legend on another sheet says what CPT-1 or LVT-2 actually is. The plans show where those rooms are, the finish plan shows how the pattern runs, and the Division 09 sections add the rest. An estimator holds all of it together, works room by room and turns it into cartons, square yards, roll widths, linear feet and kits. The real work is catching what doesn't agree before it becomes a price.

For the test, AI reads copies of those documents and drafts the takeoff: each room with its finish code, area and base run, transitions counted where two finishes meet, each product's pattern and waste shown as written, and attic stock on its own line. It also lists every room on the schedule with no place on the plans, every plan room with no schedule row, and every code missing from the legend. Nothing is priced or sent.

Room finish scheduleFrom the drawings
Room no.
Room name
Floor code
Base code
RoomFloorBase
Made-up example schedule
Read against
plans and specs
Draft takeoffFor your estimator
Finish code
Rooms covered
Waste, as written
Attic stock
ProductQuantityUnit
Made-up example takeoff

// Where it gets hard

Three documents describe one floor, and they rarely agree

The general notes move the quantity. One finish sheet, issued by addendum in November 2022 for a Midlands Technical College project, has base wrap corners at doors and windows and return to the jamb. Floor finishes stop at the center of a closed door when material or color changes and run on under base cabinetry, every landing is LVT-1 and every tread LVT-2, and a note warns that the hatching does not show the direction of the carpet or LVT. None of that sits in a room's row. A New York State resilient tile section wants flooring laid before movable partitions go up, without breaking the pattern, and Columbia University installs lab casework on legs after the floor. The draft counts those areas only where a note or section says to, and names the sheet.

An addendum can add a room's whole scope in one note. Addendum 1 to a 2015 New York State project at the Kingsboro Addiction Treatment Center in Brooklyn added a resilient tile section to the project manual and a single drawing note for the dining room: remove the existing vinyl flooring and wall base, prepare the floor, and provide about 1,750 square feet of vinyl composition tile and about 150 linear feet of vinyl base. That room's quantity lives in the note. The draft applies the latest addendum to every room it reaches and names it on the line.

Attic stock has no single rule. Kutztown University wants one box of extra resilient tile per 30 boxes or fraction, for each type and color. The University of Houston's tile section says one per 50, and its sheet section says at least 10 linear feet per 500 or fraction, in roll form at full roll width. The Port of Portland's carpet section asks for the manufacturer's minimum or one box, and Texas State University lowers its overage on jobs over 10,000 square feet. Houston's carpet section also wants the extra from the same run and dye lot as the installed goods. The draft prints attic stock as its own line by finish code and quotes the rule it used.

Pattern and layout decide the waste. CRI 104 lists monolithic, ashlar and quarter turn among the carpet tile methods and defers to the maker. Its shop drawing list wants exact notes where dye lots change, the excess material in each area and how it will be used, and a compass direction on each sheet, and it says the chalk lines need not cross at a room's center, so a layout can reduce waste. Houston wants the tile grid offset from access floor panels. Columbia wants opposite perimeter tiles equal and at least half a tile wide, reducers in one piece where possible, and base joints at least a foot past outside corners. Your estimators' waste factors go into the success criteria first, and the draft shows them room by room rather than folding them into the area.

Terrazzo and resinous count in their own units. New York's 2024 section for resinous terrazzo wants shop drawings of divider, control-joint, accessory and abrasive strips, offers control joints set back to back above the slab's own control joints, and casts precast base no shorter than 36 inches. Its resinous section has integral cove base 4 inches high and a mock-up with 96 inches of it. The draft carries strips and cove by the linear foot and keeps each product apart. Your reviewer will look first at rooms on one document only, codes missing from the legend, base counted across door openings, transitions where two finishes meet, and attic stock counted twice.

// What you send

What the test needs from your estimating desk

Copies only
No logins
01

20 to 30 takeoffs you finished

For each job, the takeoff your estimator carried and the bid or quote it fed. Mix carpet tile and resilient with at least one job that has terrazzo or resinous, and add one that changed by addendum.

02

The documents behind them

Room finish schedule and legend, floor and finish plans, the Division 09 sections, every addendum, and any partition or casework plan, as they came in.

03

Your own counting rules

Waste by product, how you count base and transitions, how you split attic stock, and the units you buy in: cartons, square yards, roll widths, linear feet, kits.

04

NDA first, look-alikes if needed

Owners' drawings and your numbers are private, so the NDA is signed before any file moves. We never log in to your takeoff program or job cost system. If a job can't leave your office, we build a look-alike from it with your reviewer.

// Before it starts

Agreed before the first schedule moves

The owner puts these in writing. Waste factors and how rooms are counted decide most of the grading.

Takeoff test termsOwner signs off
Your reviewer
Named by the owner, often the chief estimator
Success criteria
Written first, for rooms, codes, base, transitions and attic stock
Waste and units
Your estimators' factors and the units you buy in
Sample
Picked by your reviewer, with an addendum and a terrazzo or resinous job
Takeoffs
Checked by your estimator, never used in a live bid
Price
A range for the live job, before day one
NDA
Signed before any plan or takeoff is shared

// How it's judged

Each draft beside the takeoff your team carried

Room by room
Finish code by finish code
On the same 20 to 30 jobsYour estimator's takeoffThe AI draft
Every room on the schedule matched to the plansCounted on your jobsCounted on your jobs
Finish code and legend entry for each roomCounted on your jobsCounted on your jobs
Quantity by product, in the units you buyCounted on your jobsCounted on your jobs
Base by room, with door openings taken outCounted on your jobsCounted on your jobs
Transitions at every change of finishCounted on your jobsCounted on your jobs
Pattern, direction and waste shown by roomCounted on your jobsCounted on your jobs
Attic stock by code, with the rule it followedCounted on your jobsCounted on your jobs
Rooms and codes found on one document onlyCounted on your jobsCounted on your jobs
Empty until your jobs are in. No row gets a mark before your own takeoffs are compared.Your estimator grades each row against the criteria agreed first.

// After a yes

About 30 days on schedules out for bid

Once your reviewer says yes, new finish schedules run through the same job for about 30 days.

Your estimator approves every takeoff before a number reaches a bid, and your team still sends everything that goes out.

You fix the live job's price before you sign. Any job after it is priced alone, and monthly support begins when one is running.

// What could come next

After takeoffs, if you choose

Ideas, ranked
One job at a time
  1. 01

    Addendum change lists

    Each new addendum checked against the last takeoff, listing the rooms and finish codes it added, dropped or changed.

    Next
  2. 02

    Submittal packages by finish code

    Product data, samples and adhesive paperwork gathered for each code on the legend, in the order the section asks.

    Then
  3. 03

    Slab moisture test reports

    A tester's field log drafted into a report, with the areas that need a decision listed for your project manager.

    After that

// One hard limit

It never prices a job, and it never touches a live bid.

The proof of concept works on copies of finished jobs. It never logs in to your estimating, takeoff or job cost system, never touches a live bid, and never contacts a general contractor, architect or supplier. An estimator checks every takeoff. Which attic stock, pattern or accessibility rule applies stays with your team and the design team, and nothing on this page is legal or engineering advice. Certified payroll is out of scope.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range depends on how many finish schedules your estimators work through in a month, how many product types they cover, and whether terrazzo or resinous is in the mix.

// Questions

Takeoff questions from flooring estimators

Does the AI measure off the drawings?
It works from areas and dimensions the drawings state, and marks anything it had to scale from a sheet so your estimator can check it. Whether scaled quantities count is written into the success criteria before the test. Nothing it measures goes into a bid without your estimator.
What happens to rooms on the schedule that aren't on the plans?
They are listed with the sheet and room number, along with plan rooms that have no schedule row. Your estimator decides what each one means. The draft never assumes a finish for a room the documents leave out.
Does it handle broadloom, plank and sheet as well as carpet tile?
Yes, if they are in your sample. Each product stays in its own units and rules: cartons for tile and plank, roll widths for sheet, square yards for broadloom, linear feet for base. Your reviewer sets the success criteria by product.
Can it pick the waste factor?
No. Your estimators' waste factors are written down first and the draft shows them room by room. If a room looks out of line for its shape or pattern, the draft says so and leaves the number alone.
Who should review the drafts?
The estimator who checks takeoffs before a bid, or the chief estimator on your largest school or hospital work. The owner names one person ahead of time, and that person's call against the success criteria decides it.
Rob Eason

Rob Eason, founder

// Book a call with Rob

Bring one finish schedule with its legend.

Thirty minutes with Rob on your company, your role, the job you'd hand off first and how many finish schedules your estimators work through in a typical month. Plans and takeoffs stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.