// Commercial flooring contractors · Takeoffs
Takeoffs from the room finish schedule, by product and room, with every mismatch listed for your estimator.
Commercial flooring takeoffs, tested as a free AI proof of concept on copies of 20 to 30 jobs your estimators already took off. AI reads the room finish schedule, the floor plans and the Division 09 sections and drafts a quantity by product and room: finish codes, base and transitions, patterns and attic stock, plus every room or code that shows on one document and not the other. Your reviewer, the estimator who knows your takeoffs best, compares each draft with the takeoff your team carried.
- Past jobs
- 20 to 30
- Prices set by AI
- None
- Logins to your estimating system
- None
// The one job
From the finish schedule to a quantity your estimator can check
On an office fit-out, a school wing or a hospital floor, the room finish schedule lists each space by number with a code for its floor and its base, and a legend on another sheet says what CPT-1 or LVT-2 actually is. The plans show where those rooms are, the finish plan shows how the pattern runs, and the Division 09 sections add the rest. An estimator holds all of it together, works room by room and turns it into cartons, square yards, roll widths, linear feet and kits. The real work is catching what doesn't agree before it becomes a price.
For the test, AI reads copies of those documents and drafts the takeoff: each room with its finish code, area and base run, transitions counted where two finishes meet, each product's pattern and waste shown as written, and attic stock on its own line. It also lists every room on the schedule with no place on the plans, every plan room with no schedule row, and every code missing from the legend. Nothing is priced or sent.
plans and specs
// Where it gets hard
Three documents describe one floor, and they rarely agree
The general notes move the quantity. One finish sheet, issued by addendum in November 2022 for a Midlands Technical College project, has base wrap corners at doors and windows and return to the jamb. Floor finishes stop at the center of a closed door when material or color changes and run on under base cabinetry, every landing is LVT-1 and every tread LVT-2, and a note warns that the hatching does not show the direction of the carpet or LVT. None of that sits in a room's row. A New York State resilient tile section wants flooring laid before movable partitions go up, without breaking the pattern, and Columbia University installs lab casework on legs after the floor. The draft counts those areas only where a note or section says to, and names the sheet.
An addendum can add a room's whole scope in one note. Addendum 1 to a 2015 New York State project at the Kingsboro Addiction Treatment Center in Brooklyn added a resilient tile section to the project manual and a single drawing note for the dining room: remove the existing vinyl flooring and wall base, prepare the floor, and provide about 1,750 square feet of vinyl composition tile and about 150 linear feet of vinyl base. That room's quantity lives in the note. The draft applies the latest addendum to every room it reaches and names it on the line.
Attic stock has no single rule. Kutztown University wants one box of extra resilient tile per 30 boxes or fraction, for each type and color. The University of Houston's tile section says one per 50, and its sheet section says at least 10 linear feet per 500 or fraction, in roll form at full roll width. The Port of Portland's carpet section asks for the manufacturer's minimum or one box, and Texas State University lowers its overage on jobs over 10,000 square feet. Houston's carpet section also wants the extra from the same run and dye lot as the installed goods. The draft prints attic stock as its own line by finish code and quotes the rule it used.
Pattern and layout decide the waste. CRI 104 lists monolithic, ashlar and quarter turn among the carpet tile methods and defers to the maker. Its shop drawing list wants exact notes where dye lots change, the excess material in each area and how it will be used, and a compass direction on each sheet, and it says the chalk lines need not cross at a room's center, so a layout can reduce waste. Houston wants the tile grid offset from access floor panels. Columbia wants opposite perimeter tiles equal and at least half a tile wide, reducers in one piece where possible, and base joints at least a foot past outside corners. Your estimators' waste factors go into the success criteria first, and the draft shows them room by room rather than folding them into the area.
Terrazzo and resinous count in their own units. New York's 2024 section for resinous terrazzo wants shop drawings of divider, control-joint, accessory and abrasive strips, offers control joints set back to back above the slab's own control joints, and casts precast base no shorter than 36 inches. Its resinous section has integral cove base 4 inches high and a mock-up with 96 inches of it. The draft carries strips and cove by the linear foot and keeps each product apart. Your reviewer will look first at rooms on one document only, codes missing from the legend, base counted across door openings, transitions where two finishes meet, and attic stock counted twice.
// What you send
What the test needs from your estimating desk
20 to 30 takeoffs you finished
For each job, the takeoff your estimator carried and the bid or quote it fed. Mix carpet tile and resilient with at least one job that has terrazzo or resinous, and add one that changed by addendum.
The documents behind them
Room finish schedule and legend, floor and finish plans, the Division 09 sections, every addendum, and any partition or casework plan, as they came in.
Your own counting rules
Waste by product, how you count base and transitions, how you split attic stock, and the units you buy in: cartons, square yards, roll widths, linear feet, kits.
NDA first, look-alikes if needed
Owners' drawings and your numbers are private, so the NDA is signed before any file moves. We never log in to your takeoff program or job cost system. If a job can't leave your office, we build a look-alike from it with your reviewer.
// Before it starts
Agreed before the first schedule moves
The owner puts these in writing. Waste factors and how rooms are counted decide most of the grading.
- Your reviewer
- Named by the owner, often the chief estimator
- Success criteria
- Written first, for rooms, codes, base, transitions and attic stock
- Waste and units
- Your estimators' factors and the units you buy in
- Sample
- Picked by your reviewer, with an addendum and a terrazzo or resinous job
- Takeoffs
- Checked by your estimator, never used in a live bid
- Price
- A range for the live job, before day one
- NDA
- Signed before any plan or takeoff is shared
// How it's judged
Each draft beside the takeoff your team carried
| On the same 20 to 30 jobs | Your estimator's takeoff | The AI draft |
|---|---|---|
| Every room on the schedule matched to the plans | Counted on your jobs | Counted on your jobs |
| Finish code and legend entry for each room | Counted on your jobs | Counted on your jobs |
| Quantity by product, in the units you buy | Counted on your jobs | Counted on your jobs |
| Base by room, with door openings taken out | Counted on your jobs | Counted on your jobs |
| Transitions at every change of finish | Counted on your jobs | Counted on your jobs |
| Pattern, direction and waste shown by room | Counted on your jobs | Counted on your jobs |
| Attic stock by code, with the rule it followed | Counted on your jobs | Counted on your jobs |
| Rooms and codes found on one document only | Counted on your jobs | Counted on your jobs |
// After a yes
About 30 days on schedules out for bid
Once your reviewer says yes, new finish schedules run through the same job for about 30 days.
Your estimator approves every takeoff before a number reaches a bid, and your team still sends everything that goes out.
You fix the live job's price before you sign. Any job after it is priced alone, and monthly support begins when one is running.
// What could come next
After takeoffs, if you choose
- 01Next
Addendum change lists
Each new addendum checked against the last takeoff, listing the rooms and finish codes it added, dropped or changed.
- 02Then
Submittal packages by finish code
Product data, samples and adhesive paperwork gathered for each code on the legend, in the order the section asks.
- 03After that
Slab moisture test reports
A tester's field log drafted into a report, with the areas that need a decision listed for your project manager.
// One hard limit
It never prices a job, and it never touches a live bid.
The proof of concept works on copies of finished jobs. It never logs in to your estimating, takeoff or job cost system, never touches a live bid, and never contacts a general contractor, architect or supplier. An estimator checks every takeoff. Which attic stock, pattern or accessibility rule applies stays with your team and the design team, and nothing on this page is legal or engineering advice. Certified payroll is out of scope.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
The range depends on how many finish schedules your estimators work through in a month, how many product types they cover, and whether terrazzo or resinous is in the mix.
// Questions
Takeoff questions from flooring estimators
Does the AI measure off the drawings?
What happens to rooms on the schedule that aren't on the plans?
Does it handle broadloom, plank and sheet as well as carpet tile?
Can it pick the waste factor?
Who should review the drafts?

Rob Eason, founder
// Book a call with Rob
Bring one finish schedule with its legend.
Thirty minutes with Rob on your company, your role, the job you'd hand off first and how many finish schedules your estimators work through in a typical month. Plans and takeoffs stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
