30-min call with RobBook a proof-of-concept call
Carpet tile, resilient, terrazzo and resinous

// For commercial flooring contractors

AI for commercial flooring contractors, tested on finish schedules you already took off.

For subcontractors who install carpet tile, resilient, terrazzo and resinous floors in offices, schools and hospitals. Start with takeoffs from the room finish schedule, or with the slab moisture reports that stand between your crew and the first bucket of adhesive. Either one runs as a free AI proof of concept on copies of 20 to 30 jobs or reports your team already finished, with nothing connected to your estimating, job cost or testing systems. Your reviewer, the person on your team who knows that work best, compares every draft with what your people did.

Book a proof-of-concept call30 minutes with Rob
Flooring proof of conceptTerms before day one
First job
Finish schedule takeoffs, or slab moisture reports
You send
20 to 30 finished jobs or signed reports, copied after an NDA
We touch
No estimating, job cost or testing system, and no live bid
Never
Decides a slab is ready, or signs a report
Reviewer
Named by the owner, often your chief estimator
Left out
Certified payroll
Price
A range up front, then a fixed price

// Jobs we would test

Between the finish schedule and the first carton

Takeoffs or moisture reports first
Two more, later

// Why these two first

The floor goes in last, and two documents decide how it goes

A floor job is written across many sections. The University of Houston's master specifications keep carpet in 09 68 13, resilient tile in 09 65 19 and sheet in 09 65 16, and point to 09 65 13 for the base and accessories installed with them. New York State's 2024 master spec puts resinous terrazzo in 09 66 23 and resinous flooring in 09 67 23, and the Port of Portland sends slab preparation to 09 05 61. None of those sections says which product goes in which room. The room finish schedule does, which is why a takeoff starts there and why a test can too.

The trade's own standard begins with that schedule. The Carpet and Rug Institute's CRI 104 wants a scale drawing before commercial carpet goes in, to settle quantities, the amount per dye lot, the installation method, adhesives, transition moldings and wall base. On new construction it asks for drawings with space names or numbers and a finish schedule of style, pattern, color and installation method. Every takeoff your estimators finished began from those pages and ended in a quantity, so an old job arrives with its answer attached.

The moisture report is owed to you, and the floor is yours afterward. CRI 104 says that before a direct glue-down or free floating carpet tile job, the owner, the general contractor or their testing agent is to give the flooring contractor a written report on moisture and alkalinity, and it recommends qualified independent testers. Columbia University's resilient tile standard has the flooring contractor check the project for conditions that affect the work, and says defects caused by unsatisfactory conditions are corrected at no cost to the owner. How any of that binds you depends on your contract, and nothing here is legal advice. Either way, the report is the paper everyone reaches for later, and a stack of signed ones makes a ready test.

Old buildings add a step. School and campus renovations often begin with the floor that is already there. Texas State University's standard has the owner test existing resilient flooring for asbestos before removal, and Kutztown University wants a trained and certified abatement contractor to finish any removal of asbestos-containing flooring before new flooring starts. A takeoff has to show what comes out and who takes it out, and that scope is easy to lose in a demolition section.

The judgment stays with your people. Whoever runs a floor job carries most of this in their head, and FCICA, the Floor Covering Installation Contractors Association, built its Certified Installation Manager program for that role. In the proof of concept an estimator checks every takeoff and a qualified tester signs every report. It works on copies, stays away from your estimating, job cost and testing systems and from any live bid or report, and never decides whether a slab is ready for flooring.

// How the test runs

One desk, one job, one decision

  1. Step 01

    Pick the job and the judge

    The owner names the reviewer, often the chief estimator for takeoffs or the project manager who reads your slab reports. You agree the success criteria in writing and get a price range for the live job, and the NDA comes before a single sheet leaves your office.

  2. Step 02

    Run it on finished work

    Send 20 to 30 takeoffs with the schedules, plans and sections behind them, or 20 to 30 signed reports with their field logs. We call this stage the sandbox: a free AI proof of concept on floors you have already finished. If a job can't leave your office, we build look-alikes with you.

  3. Step 03

    About 30 days live, after a yes

    The same job runs on new schedules or new slabs for about 30 days. An estimator approves every takeoff before it reaches a bid, and a qualified tester signs every report before it reaches anyone. The next job, if you want one, is priced on its own, and monthly support follows.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call, from how many takeoffs your estimators finish in a month and how many slabs you test or get reports on.

// Questions

Questions from commercial flooring contractors

Do you need our takeoff program or estimating software?
No. The test runs on PDFs and exports of finished takeoffs, schedules, plans, sections and reports. Nothing logs in to your estimating, job cost or testing system, and no live bid or report is touched. Your systems come up only in the live run after a yes, with a person approving each item.
Will the AI say a slab is ready for flooring?
No. It lays out the method, the locations, the readings and the limit you gave it, then lists the areas that need a decision. Whether a slab is ready belongs to your people, the adhesive maker and the design team, and a qualified tester signs every report.
We mostly lay carpet tile. Does terrazzo or resinous change anything?
It changes what gets counted. Carpet tile runs by the carton with pattern and dye lot, terrazzo adds strip layouts, and resinous adds integral cove by the foot. Put the mix you really bid in the sample, and your reviewer sets the success criteria by product type.
Who should be our reviewer?
For takeoffs, the chief estimator or whoever checks estimates before a bid goes out. For moisture reports, the project manager who reads them or the certified tester on your staff. The owner names one person before the test, and that person's call decides it.
Does this cover certified payroll?
No. School and public jobs often bring prevailing-wage payroll reports, and those hold personal data about your installers. They stay with your payroll people and outside every test here.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring one finish schedule and the takeoff behind it.

Thirty minutes with Rob about your company, your role, the job you'd test first and how many takeoffs or slab reports cross your desk in a month. Schedules and reports stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.