30-min call with RobBook a proof-of-concept call
Job 03 · Builder order desk

// Building products distributors · Builder POs by lot

Every builder PO for a start, checked against the house package and that lot's options.

When a production builder starts a house, its system sends your yard a purchase order for that lot: community, lot and plan, often elevation and option codes, and a price on every line. Variance and extra POs follow when something changes. Someone on your builder desk reads each one against the agreed house package and price list before the first load ships. In a free AI proof of concept, AI does that check again on copies of 20 to 30 lots your team already shipped: every PO line matched to the package, the lot's options and the agreed price, and every line that doesn't match listed for the person who confirms the order. Your reviewer, the person who knows your builder accounts best, sets that list beside what your desk caught at the time.

Book a proof-of-concept call30 minutes with Rob
Lots tested
20 to 30, already shipped
POs confirmed by AI
None
Before any PO moves
An NDA

// The one job

From a builder's PO to a list of lines that don't match

The PO reaches you through the builder's portal or as a PDF, one per start, sometimes split by delivery. It names the community, lot and plan, prices each line from the builder's own records, and carries codes for the options the buyer picked. Later paper lands on the same lot: a variance PO when a superintendent adds material, a revised PO when an option changes after the start. Your desk confirms the order, sends it back, or calls the builder's purchasing team.

For the test, AI reads copies of those POs beside the house package your team agreed for each plan and the price agreement in force, and drafts a check sheet for every lot: each PO line matched to a package line with item, quantity, unit and price compared, each package line the PO left out, and each variance PO tied back to the lot and line it changes. Nothing is confirmed, rejected or sent. Your reviewer compares the sheet with what your desk flagged when those lots shipped, and with any rebill or credit that came later.

Builder POFrom the builder
Community and lot
Plan and elevation
Option codes
Start date
PO lineQtyBuilder price
Made-up example builder PO
Matched
line by line
Lot check sheetFor your builder desk
Package used
Lines matching
Lines differing
Variance POs
Package lineFieldPO vs. agreed
Made-up example check sheet

// The hard parts

Why a builder's PO and your house package drift apart

The PO comes from the builder's takeoff, not yours. Oracle's guide to JD Edwards EnterpriseOne Homebuilder Management, one ERP production builders run, describes a Lot Start process that turns bids and takeoffs into lot-specific purchase orders. Bid details are kept by area, community, phase, plan, elevation and option, and the process looks for an exact match on those fields before falling back to less specific records. Takeoffs work differently: when several takeoff records match a lot, their quantities are added together. So a PO can be wrong where your package is right, with a quantity counted twice or a price taken from a general record. The draft compares each PO with your package for the same plan, elevation and options, and names the field that differs.

The price is set at the start. Smith Douglas Homes, in its annual report for 2025, says material prices for a home move until construction begins and are then locked in by purchase orders. Oracle's guide gives each bid an effective date and a cancel date, and has Lot Start compare them with the lot's commitment start date. ICI Homes' published PO terms, effective September 15, 2025, call the price on its purchase order a ceiling that can't rise without the builder's written approval in advance. A line priced under your agreement is a loss once the load ships, unless someone catches it first. The draft checks every line against the agreement in force on the date your success criteria name, usually the start, and lists lines priced from an expired list or one not yet in effect.

Changes arrive on separate paper. The same ICI Homes terms show authorized changes separately on a Variance Purchase Order or Change Order, and make the purchase order the seller's invoice once the job is complete. Oracle calls extra purchase orders field purchase orders, because they start at the construction site, and uses them for lots only. Smith Douglas says the system behind its paperless POs, which lets trade partners check their job schedules and orders online, helps it avoid variance orders. A variance PO filed to the wrong lot leaves two lots wrong. The draft ties every variance or extra PO to its lot, its original PO and the line it changes, and lists any it can't place.

The agreement may be national while the PO is local. D.R. Horton's annual report for fiscal 2025 lists negotiating national purchasing contracts among its corporate functions, while most of its direct homebuilding runs through local divisions. Smith Douglas says it sets national specifications with its distributors and has distribution agreements for lumber among other supplies. The price a division's PO should carry can sit in an agreement written somewhere else, with its own item names. The draft keys each PO line to whichever agreement, price exhibit or list you send, and marks any item the agreement doesn't name.

Who bought it on the lot matters later. Oracle's guide separates turnkey bids, where a subcontractor buys labor and materials, from takeoffs, where the builder buys and delivers the material itself, so your customer on a lot may be the builder or a framer. Notice rules can turn on that. Washington's lien statute, for one, says that on new construction of a single-family residence a notice of the right to claim a lien may be given at any time but protects only materials supplied from ten days before it, where the general rule reaches back sixty days. The draft keeps each lot's address and customer of record beside its POs; whether a notice is due is for your credit manager and counsel, and this is not legal advice. Your reviewer, usually the builder account manager or order desk lead, watches option codes, doubled lines, stale prices and stray variance POs.

// What you send

What the test needs from your builder desk

Copies only
No builder portal login
01

20 to 30 lots you shipped

For each lot, the builder's PO as it arrived, every variance or extra PO against it, your confirmation or sales order, and the delivery tickets. Include a lot whose options changed after the start and one your desk sent back.

02

Packages and price agreements

The house package your team agreed for each plan, elevation and option, and the price list, builder agreement or pricing exhibit in force when each of those lots started.

03

What your desk caught

Emails to the builder's purchasing team, revised POs you asked for, and the rebills and credits on those lots. That record is the answer key the draft is graded against.

04

NDA before any agreement

Builder agreements and price lists are confidential, so the NDA is signed before a file moves. We never sign in to a builder's portal or your ERP. If POs can't leave, your reviewer helps us build look-alike lots with the same problems in them.

// Before it starts

Settled before the first PO moves

A PO that is short one bundle may not be worth a call, so the owner decides what counts as a mismatch before anything is graded.

Builder PO test termsOwner decides
Your reviewer
Named by the owner, often the builder account manager or order desk lead
Mismatch rule
Which differences count: item, quantity, unit, price or a missing line
Price date
Which list applies to a lot: its start date, the PO date or the ship date
Success criteria
Written and agreed, for matched lines, missed lines and variance POs
Sample
Picked by your reviewer, option changes and returned POs included
Price
A range for running builder POs live
NDA
Signed before any PO or builder agreement is shared

// How it's judged

Each check sheet beside what your desk caught

Lot by lot
Every PO line read
On the same 20 to 30 lotsWhat your desk didThe AI draft
Each PO matched to its community, lot, plan and elevationChecked on your lotsChecked on your lots
Every PO line matched to a house package lineChecked on your lotsChecked on your lots
Option codes on the PO against that lot's optionsChecked on your lotsChecked on your lots
Item, quantity and unit on every lineChecked on your lotsChecked on your lots
Price against the agreement in force for that lotChecked on your lotsChecked on your lots
Variance and extra POs tied to the lot and line they changeChecked on your lotsChecked on your lots
Package lines the PO left outChecked on your lotsChecked on your lots
Lines listed for your desk, and whyChecked on your lotsChecked on your lots
Nothing scored yet. These cells fill only once your own lots have been through the test.Your reviewer marks each line, and that decides it.

// After a yes

About 30 days on new starts

Once your reviewer says yes against the success criteria, the same check runs on new builder POs and variance POs for about 30 days.

Each check sheet goes to the person who confirms builder orders, and only they accept a PO, send it back or call the builder. Nothing loads on the strength of a draft.

The live run has a fixed price agreed before you sign, and a next job is priced by itself.

// What could come next

Possible next jobs, ranked

Ideas to weigh together
One job at a time
  1. 01

    Delivery tickets against the PO

    What loaded on each truck compared with the PO lines for that delivery, with shorts and substitutions listed before the invoice goes out.

    Next
  2. 02

    Trim and door packages

    The millwork for each start drafted from the plan's door schedule, so the builder's trim PO has a package to be checked against.

    Then
  3. 03

    Rebills and credits

    Rebills and credit requests drafted for lines a builder disputes, with the PO, ticket and agreement attached for your desk to review and send.

    After that

// One hard limit

It never confirms, prices or returns a builder's PO.

The draft lists what differs; a person on your desk decides whether to accept the PO, ask for a revision or call the builder. During the test nothing reaches a builder, a superintendent or a builder portal, no material is ordered or loaded, and every file is a copy. Lien notices and other legal deadlines stay with your credit team and counsel, and nothing here is legal advice.

Builder POs are priced as their own job: a range before the proof of concept, then a fixed figure before you sign.

The range depends on how many starts your builders release in a month, how many plans and option codes they carry, and how many builders send POs through a portal rather than by email.

// Questions

Questions from builder desks

Do you log in to the builder's portal?
No. The test works from the PO printouts or exports your desk already keeps, plus the variance POs on the same lots. Nothing is accepted, rejected or changed in a builder's system or in your ERP.
Our house packages live in the estimating program. Is that a problem?
No. Send each plan's package as an export or printout, with its elevations and options. The check is only as good as that package, so your reviewer picks plans whose packages the desk trusts.
What if the builder's PO is right and our package is wrong?
The line still goes on the list as a difference, and your reviewer decides which side was right. The draft never assumes the package or the PO wins; the success criteria say how each kind of difference is scored.
Will it tell us when to send a lien notice?
No. It keeps each lot's community, lot number, address and the customer you sold to in one place for your credit team. Whether a notice is due, and when, stays with your credit manager and counsel.
Who should our reviewer be?
Whoever confirms builder orders today, often the account manager on your largest production builder or the order desk lead. The owner names that person before the test, and their call against the success criteria decides it.
Rob Eason

Rob Eason, founder

// Book a call with Rob

Bring one lot with a variance PO on it.

Thirty minutes with Rob. Have three answers ready: your company and role, the job you'd test, and about how many builder starts reach your desk in a month. POs and price agreements stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.