30-min call with RobBook a proof-of-concept call
Job 02 · Quality

// Aluminum extruders · Alloy and origin certificate files

Alloy and origin certificate files, assembled from mill and plant records for your quality manager.

One job, tried on copies of shipments you have already closed. AI assembles the file a load carries: alloy, temper, heat or lot, mechanical test fields, chemistry fields, country of smelt and cast where a public source shows importers are asked for it, finish records, and a list of what is missing. Your quality manager reviews and releases every certificate.

Book a proof-of-concept call30 minutes with Rob
Closed shipments
20 to 30
Who releases
Your quality manager
Customs calls made
None

// The one job

From scattered mill and plant records to one file for each load

A customer's PO asks for certs, maybe a country of origin line, sometimes a finish report. Someone in quality chases the billet or mill record for the cast number, the press lot and tensile result, and the finishing line's record, then types up a certificate and a cover note.

In the test, AI works from copies of those records for shipments you already closed and builds the file for each load, every field traced back to the record it came from: alloy and temper, heat or lot, test values, chemistry, finish, and smelt and cast where a record states them. What it can't find goes on the missing list and stays blank. Your reviewer, the quality manager or the person who knows these files best, holds each draft against the certificate that actually shipped.

Mill and plant recordsBillet cert, press log, finish record
Cast or heat no.
Alloy and temper
Test results
Finish record
RecordLotValue
Made-up records, no mill's data
Traced field
by field
Draft certificate fileFor your quality manager
Alloy and temper
Lot numbers tied
Smelt and cast
Missing list
FieldSource recordStatus
Made-up file, for illustration

// What your quality manager reads for

Why a shipment's file is more than a template

Lot numbers have to connect. ASTM B666, the practice for marking aluminum products, lists what goes on a wrought product or its tags: the company name or trademark, alloy and temper, the basic specification number, ordered dimensions for some forms and a lot number, and it leaves package marking out. Your billet supplier's cast number, your press lot and the finishing rack or batch can each sit on a different sheet. The draft ties them together through whatever record connects them and lists any link it can't find.

Tests and chemistry are fields until a spec gives them meaning. ASTM B221, the specification for extruded bars, rods, wire, profiles and tubes, expects tensile strength, yield strength and elongation to conform and notes that elongation doesn't apply below certain sizes. The Aluminum Association's Teal Sheets, its registration record for wrought alloy composition, gives a limit for each element, then other elements each and in total, and says only limits identical to a registered designation belong to that designation. It warns that local, national or international rules can tighten a composition further and advises writing those into the sales agreement, so a customer's added chemistry line becomes a question. The draft copies what your mill or lab reported and never decides that a result passes.

Importers are asked where the metal began. U.S. Customs and Border Protection's March 7, 2025 guidance has importers report ISO country codes for primary smelt, secondary smelt and most recent cast on Section 232 aluminum goods. It says goods made only from recycled aluminum report a secondary smelt in the country of origin, importers must be able to provide manufacturing documents on request, and goods of U.S. origin are not covered by that reporting. A message dated June 13, 2025, effective June 28, lets filers report UN for unknown on derivative imports, with an extra heading required. An April 3, 2026 message tells filers to keep reporting these countries for subject aluminum and derivatives. So a customer that imports, or buys from one that does, can ask for those lines, and the draft fills them only from a record that states them.

Cast is its own record. Commerce's import licensing rule, 19 CFR 361.103, published December 23, 2020, defines the country of smelt as where new metal is made from alumina and the country of most recent cast as where the metal was last melted and cast solid, a billet or ingot included. A license application may say not applicable for the primary smelt field when only secondary aluminum was used, but it may not say unknown or not applicable for cast. That is why a billet supplier's certificate can answer one line and leave another open. We date these because trade rules change often, and they appear here as background: this page is not legal, customs or engineering advice, and the draft makes no customs determination.

A finish record has its own codes. Michigan State University's storefront standard writes clear anodize as AA-M12C22A41, Class I, 0.018 mm or thicker, under AAMA 611. The University of Texas at Arlington writes AA-M10C21A41, Color #14 Clear, 0.7 mil. Albuquerque Public Schools calls for a clear Class II finish, AA-M12C22A31, 0.4 mil minimum, and Maryland's June 2013 sections list AA-M12C22A42/A44. AAMA 611-26, announced in February 2026, covers anodic coatings on architectural extrusions and panels, batch or continuous coil. The draft carries the code, class and thickness reading your finish record shows and lists any mismatch for your quality manager, who checks it against the certificate that shipped.

// What you send

Shipments your quality office already closed

Copies only
Commercial work only
01

20 to 30 closed shipments

Each with the customer's PO, the certificate that shipped and any cover letter. Include one with a missing record and one your team had to correct after the fact.

02

Mill and billet records

Producer certificates and any supplier declaration on smelt and cast, as your file holds them today.

03

Plant records

Press logs, lab or tensile results and any aging or heat treatment sheet the shipment carried.

04

Finish records

Anodize or paint records, thickness readings and any outside finisher's certificate.

05

An NDA before anything moves

Signed first. No login to your ERP, lab, plant or finishing systems or to any customs portal. If mill certs can't leave the building, we build look-alikes with your reviewer.

// Before it starts

Written down before any certificate is copied

The owner and your quality manager agree on these first.

Before the proof of conceptOwner decides
Your reviewer
Named by the owner, usually your quality manager
Success criteria
In writing: which fields must be carried and what counts as missing
Smelt and cast
Shown only where a record states them
Customs and legal
Your broker and your counsel, never the test
Price
A range for the live job, given up front

// How it's scored

The certificate that shipped, set beside each file

Shipment by shipment
field by field
Compared on the same shipmentsCertificate that shippedThe AI file
Alloy and temperFilled in on your shipmentsFilled in on your shipments
Heat, cast or lot numbers tied togetherFilled in on your shipmentsFilled in on your shipments
Mechanical test fieldsFilled in on your shipmentsFilled in on your shipments
Chemistry fieldsFilled in on your shipmentsFilled in on your shipments
Country of smelt and cast, where shownFilled in on your shipmentsFilled in on your shipments
Finish records attachedFilled in on your shipmentsFilled in on your shipments
Missing items listedFilled in on your shipmentsFilled in on your shipments
Nothing scored yet. Each cell waits until one of your own closed shipments has been through it.Your reviewer marks each row and gives the verdict.

// After a yes

About 30 days on new shipments

With a yes, each new shipment gets the same file for about 30 days.

Your quality manager reviews and releases every certificate, and nothing goes to a customer or a broker unless a person sends it. The live month is scored on the same table.

// Possible next jobs

After certificate files, if you want more

Ranked, not promised
Separate prices
  1. 01

    Profile quote requests

    A customer's print and request read into a draft for your estimator.

    Next
  2. 02

    Recycled content and EPD requests

    A building products customer's question matched to the declaration your team already cites.

    Then
  3. 03

    Bow, twist and finish complaints

    A complaint set beside the lot's certificate, the print's tolerance note and the finishing record.

    After that

// One hard limit

It signs nothing and makes no customs call.

The proof of concept never touches your ERP, a plant system or a live certificate, and it never prices a job, sets a die plan, makes a customs determination or signs a certificate. A quality manager reviews and releases every certificate. Defense and aerospace work stays out.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range follows how many shipments leave with a certificate file each month and how many separate records each file pulls from.

// Questions

Questions about certificate files

Does the AI decide whether a lot meets the specification?
No. It lists each field beside what the record shows. Whether a lot conforms stays with your quality manager, who reviews and releases every certificate.
Can it tell us our country of smelt or cast?
Only if a record in your file states it. If none does, the line goes on the missing list, so your quality manager and your broker can decide what to ask your supplier.
Is this customs advice?
No. CBP and Commerce pages are cited on this page with dates as background, and trade rules change often. The draft makes no customs determination and files nothing with anyone.
We finish some work outside. Does that break the file?
No, include some of that work. An outside finisher's certificate goes in as its own record, and the draft notes which shipments have one and which don't.
Do you need access to our ERP or lab system?
No. The test works from copies and exports. How live files would reach your own system is settled only after a yes.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with the files from last month's shipments.

A half-hour call with Rob on your plant, your role, which customers ask for what, and roughly how many shipments carry a certificate file each month. Mill records stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.