30-min call with RobBook a proof-of-concept call
System page · Deltek Vantagepoint

// Deltek Vantagepoint · Project invoicing

Billing from Deltek Vantagepoint? Test project invoicing on periods you already closed.

For engineering and architecture firms whose billers run drafts in Vantagepoint, then wait while project managers mark them up. AI writes up each project's final invoice from copies of a closed period's labor and expense detail and the project's billing terms, and your reviewer, whoever knows your Vantagepoint billing best, checks it against what the client received. We never log in to Deltek.

Book a proof-of-concept call30 minutes with Rob
Old invoices
20 to 30
Vantagepoint access
None
Before any file
NDA signed

// The one job

From the draft run to the invoice the client gets

Once a project's billing terms are set, Vantagepoint does the arithmetic. The hours go into the loop around it: a biller runs drafts for the period, project managers mark them up, hours get held or moved, fees to date get changed, and the biller runs the drafts again until they read right. Only then are they accepted as final.

For the test, AI works from copies of a closed period: each project's billing terms, the labor and expense lines with their billing status, and the drafts your billers printed, where they kept them. It writes up the invoice each project should have sent, with a note on every change from the draft and the reason for it. Vantagepoint is never touched. Your reviewer compares every write-up with the final invoice on file.

Labor and expense detailOne closed period
Project, phase, task
Employee
Labor category
Billing status
HoursBill statusAmount
Made-up example, not a firm's data
Written up against
the billing terms
Final invoice write-upFor your reviewer
Fee method
Billing group
Billed to date
Backup to print
PhaseFee to dateThis invoice
Made-up example of a write-up

// Inside Vantagepoint

What Vantagepoint's billing terms leave for your billers

The fee method on the Fees tab. Each project's terms name one: Overall Percent Complete, Cumulative Unit or Fee, Current Unit or Fee, or Percent Complete by Phase, set up as a share of the fee or as a fixed amount per phase. Fee to Date and Percent Complete move together, so typing one rewrites the other. The method also decides where earlier billings live. Fee billed to date that is entered by hand goes in one Prior Fee Billing total, or, under the phase methods, phase by phase in the Billed-to-Date column of the Fee Billing Phases grid. The write-up names the method it found and the billed-to-date figure it started from.

A status code on every line. Labor and expense lines carry a billing status: B for billable, H for held, R where part of a line was held or released, T for a line moved to another project, phase or task, and F once it has been billed. A write-off reads W until its invoice posts and X after. A line marked for deletion reads D until a billing run removes it, then O. Read only the hours and amounts and you bill held time and miss transfers. So the test reads the status column in your export and lists each H, R and W line beside what the final invoice did with it.

Billing groups. A client with several projects can get one invoice through a billing group: a main project and its sub-projects, all of the same charge type. With Consolidate Printing on, the main project's terms calculate the whole invoice. With retainage and interest set to Group, only the main project's settings count, and whatever the other projects' terms say is ignored. A project that bills cleanly on its own can come out differently inside its group, so the write-up names the group and the terms each project actually billed under.

Templates, backup and pre-invoices. Each project's invoice prints on a template built in the Invoice Template Editor under Settings > Billing, so one client's format is a template, not a habit. On the Billing Backup tab, Print Supporting Documents can be checked for AP vouchers and disbursements, expense reports and units, so uploaded receipts print with the invoice and ride along in the emailed PDF, though a biller can pull one document off one invoice in Interactive Billing. Some contracts get pre-invoices instead: requests for payment with templates of their own, which Vantagepoint keeps out of the general ledger. Leave Process Pre-Invoices checked on a project and the next run makes a pre-invoice, not an invoice. The write-up lists the backup each invoice should carry and flags any project still set to pre-invoice.

What your reviewer watches. Deltek's own checklist for invoices that need approval runs from a draft run in Batch Billing, through Interactive Approvals and Draft Invoice Approvals, to a final run that accepts the drafts, then a separate posting of the invoice file in the Transaction Center. Your reviewer, usually the billing lead or a project accountant, checks that each write-up used the fee method and terms the project really has, kept held and pending write-off lines off, carried the right backup, and landed on the final invoice's total, or said plainly why it didn't.

// What you send

Exports and PDFs from closed periods

No Vantagepoint login
Two or three periods
01

Final invoices, and the drafts before them

20 to 30 final invoices as clients received them, from two or three closed periods. If your billers kept the draft PDFs from those runs, send them too. The gap between draft and final is where your PMs' time went.

02

Line detail with its billing status

A labor and expense detail export for the same projects and periods, with the billing status column left in. The Billing Backup report works as well, if you print one.

03

Billing terms and groups

For each project in the sample: fee method, fee and billed to date, rate and limit settings, retainage, its invoice template and any billing group. Screenshots or a report are both fine.

04

An NDA, then the copies

The NDA comes before any file. No one asks for a Vantagepoint, Deltek cloud or file server login at any point. If invoices can't leave the office, your reviewer helps us build look-alikes that keep the awkward projects.

// Before it starts

What the owner decides first

Settled with the owner, or whoever signs for the firm, before any export leaves the office.

Before the proof of conceptOwner's call
Your reviewer
The owner's pick: whoever runs billing in Vantagepoint, often the billing lead
Success criteria
Agreed in writing: totals that match the final invoice, every change from the draft explained
Sample
Chosen by your reviewer, with a billing group and a phase-billed project in it
Price
A range for the live job
NDA
Signed before the first export

// How it's judged

Each write-up beside the final invoice

Same closed periods
Project by project
Compared on the same projectsThe final invoice sentThe AI write-up
Fee method read from the billing terms, billed to date carried inFrom your invoicesFrom your invoices
Held, partly held and transferred lines kept off or movedFrom your invoicesFrom your invoices
Pending write-offs left off the invoiceFrom your invoicesFrom your invoices
Billing group projects billed under the main project's termsFrom your invoicesFrom your invoices
Receipts and vouchers attached where the Billing Backup tab calls for themFrom your invoicesFrom your invoices
Projects still set to pre-invoice caught before the runFrom your invoicesFrom your invoices
Every change from draft to final, with its reasonFrom your invoicesFrom your invoices
Blank for now. Not one cell fills until your own closed periods have gone through.Your reviewer fills in each row, and that verdict is the one that counts.

// After a yes

About 30 days on live periods, still with no Deltek login

If the write-ups meet the success criteria, your next billing periods get the same treatment for about 30 days, built from the exports your billers already pull.

A person on your team approves or corrects every write-up before anything changes in Vantagepoint or reaches a client. Changes go in the way your billers make them today, in Interactive Billing or your draft approvals, and the final run, posting and sending stay with your team.

// Later, one at a time

Jobs that could follow in a Vantagepoint firm

Possibilities to weigh
Each priced on its own
  1. 01

    A mid-period look at held time

    Each week, held, partly held and transferred hours listed by project, so fewer decisions pile up for the draft run.

    Next
  2. 02

    Billing terms for new contracts

    Signed contracts read and their billing terms drafted, fee method, limits, retainage and template, for your billing lead to enter.

    Then
  3. 03

    Subconsultant invoices

    Invoices from your subconsultants checked against their agreements and phases before your AP approval step.

    After that

// One hard limit

No Deltek login, and no say over what gets billed.

Everything runs on copies and exports you send. We never sign in to Vantagepoint, its cloud or any Deltek product, and we claim no integration, partnership or certification with Deltek. Your project managers still decide percent complete, what stays on hold and what gets written off. Deltek and Vantagepoint are named here only because they are the system you bill from; they are trademarks of Deltek, Inc.

Priced as one job: a range before the proof of concept, then a fixed price before you sign.

The range turns on how many projects you bill each period, how many sit in billing groups and how many invoice templates you keep.

// Questions

Questions from Vantagepoint firms

Is this a Deltek integration?
No. We are not a Deltek partner and have no integration, certification or connection with Deltek. The proof of concept runs on copies and exports you send, and we never log in to Vantagepoint.
We bill from Ajera. Does this page apply?
Ajera is Deltek's separate product for smaller A&E firms, with its own billing types and screens, so the field names here won't match yours. The test itself runs the same way: copies of past invoices and what went into them, your reviewer, no login.
We're still on Deltek Vision. Can we test?
Yes. Deltek introduced Vantagepoint in 2017 as the next version of Vision, and Deltek partners report that Vision support ends after December 31, 2026. Vision has billing terms and billing groups too, so its exports work for the test. The screen names on this page are Vantagepoint's.
What do you need out of Vantagepoint?
Exports, not access: the final invoices, the labor and expense detail with its billing status, and each project's billing terms and billing group. Draft PDFs from the same runs help if your billers kept them.
Will the write-ups change percent complete or post anything?
No. They sit on a review sheet outside Vantagepoint, so no fee to date, billing status or invoice changes. Where a phase's percent complete looks out of line with its hours, the write-up says so and leaves the number to the project manager.
Rob Eason

Rob Eason, founder

// Book a call with Rob

Bring last quarter's final invoices, and the drafts if you kept them.

Rob takes the call, 30 minutes. Expect three questions: what your firm does and your part in it, which job you would test, and how many projects Vantagepoint bills for you each period. Keep exports on your side until there is a signed NDA.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.