30-min call with RobBook a proof-of-concept call
Job 01 · Permits and plan design

// Traffic control companies · Permit plan packets

Permit plan packets, read from the right-of-way permit into a draft for your traffic control designer.

Before anyone draws a taper, somebody has to work out what this city will allow on this street, in these hours, with how much warning. In a free AI proof of concept on copies of 20 to 30 permits you already closed, AI drafts that packet and lists every requirement with no matching document. Your reviewer, the designer or permit lead who knows these agencies best, sets each draft beside what your office actually filed.

Book a proof-of-concept call30 minutes with Rob
Past permits
20 to 30
Plans designed by the AI
None
Permit portals opened
None

// The one job

From a permit's conditions and a job's scope to a packet your designer can start from

A customer sends a scope: a utility cut on a collector, a crane set on a downtown block, a paving shift on an arterial. Someone at your office reads the agency's permit conditions beside it, sorts out which hours apply, how many lanes can close and for how long, who must be told and how far ahead, which typical drawings the agency accepts, and what has to be attached. Only then does your designer open the drawing.

In the test, AI reads copies of those same papers and drafts the packet: hours allowed, lane closure limits as stated, notification periods with who gets notified, the typical plan references the agency names, and a list of every requirement with no matching document. It draws nothing and files nothing. Your reviewer checks each draft against the packet your team sent.

Permit and scopeAgency and customer
Agency
Street class
Work description
Requested dates
ConditionSource pageAs written
Illustration, not a real permit
Read into
one packet
Plan packetDraft for your designer
Hours allowed
Lane closure limits
Notices due
Typical plan named
RequirementDocumentMissing
Made-up packet, for illustration

// What makes it hard

What a permit packet has to catch before the plan is drawn

Allowed hours come in layers. San Diego's Information Bulletin 177, dated May 2026, sets standard workdays at Monday through Friday, 8:30 a.m. to 3:30 p.m., and night work at Sunday through Thursday, 9 p.m. to 5 a.m. Wilmington, North Carolina's September 2024 worksheet says contractors generally work 7 a.m. to 6 p.m., then takes away 6 to 9 a.m. and 4 to 7 p.m. on major roadways, weekends on those roadways, and city holidays along with the day before and the day after. Its school zone line says closures are generally restricted from 9 a.m. to 2 p.m., which a careful reader could take either way. The draft quotes a line like that and hands it to your designer instead of picking a meaning.

Lane limits depend on what closes. Brazoria County's toll road authority, in a policy adopted in July 2022, allows a shoulder or a single managed lane to close from 9 a.m. to 3 p.m. on weekdays and 10 p.m. to 5 a.m. at night, with a weekend window from 10 p.m. Friday to 5 a.m. Monday. Two lanes, a ramp, a connector or a total closure get no weekday daytime window at all. Seattle's Client Assistance Memo 2111 holds a lane left open in one direction to a minimum of 11 feet, or 10 feet with spotters or flaggers, and wants separate work-hours and non-work-hours plans, with a new plan at each construction phase change even when the devices stay put. Houston takes its standard traffic drawings for a single lane, needs a plan before permit approval for multiple lanes or a full closure, and asks for the approved plan's EAM number on the application.

Notice runs on several clocks at once. San Diego wants five working days' warning before work begins, the same five days for police and fire dispatch, no-parking signs up 72 hours ahead, and any extension request five working days before the permit expires. Its permit runs up to three weeks, with extensions for up to six. Wilmington asks for 72 hours with businesses on the block, three days for handouts and three to five days for message boards. Brazoria County takes a standard closure request 48 hours out and a total or ramp closure three weeks out, and for a major pattern change wants changeable message signs posted two weeks ahead. Houston requires seven days of public notice for a full street closure. The draft turns each one into a line with its own party and its own lead time.

Typical plans are the agency's own shorthand. Wilmington's worksheet pairs closure types with MUTCD typical applications, TA-18 for a lane on a minor street and TA-28 or TA-29 for a sidewalk, and with North Carolina's drawings 1101.02 and 1103.03. It then sorts submissions into four levels, from standard details up to a site-specific plan with a detour or message boards and a written summary. On a Tukwila, Washington fast-track permit, the applicant just cites a state plan, TC-420 for flagging or TC-16 for a sidewalk. Pennsylvania's Publication 213 calls its figures PATA, and its March 2021 revision stretched a short-term operation from under 24 hours to under 72 and added PATA 116B, a red-arrow detour for roads carrying under 1,500 vehicles a day. Minnesota lists three district lane closure manuals beside its 2018 field manual. The draft copies each reference exactly and says nothing about whether it fits the street.

The signature line changes too. Tukwila's May 2026 guide sends higher-tier work to a custom 11-by-17 plan stamped by a certified Traffic Control Supervisor or a Professional Engineer, and any field deviation belongs to whoever stamped it. A speed limit of 40 miles an hour or more, night work, work within 300 feet of a signal or a pedestrian path in the roadway puts a job in the top tier, where the supervisor stays on site and files a daily log. Wilmington accepts a plan based on its standards or from a certified professional or engineer. Texas, in its 2024 Item 502, wants contractor-proposed changes to a plan signed and sealed by a licensed professional engineer. Brazoria's request form asks for the applicable standard or a signed and sealed drawing. So the draft names the credential each agency asks for and leaves the signature blank. Your reviewer will check that every stated restriction reached the page, that no limit was invented, that each attachment answers a requirement, and that the missing-document list holds up. None of this is legal or engineering advice, and each agency's current permit controls.

// What you send

Permits your office has already closed

Copies only
Several agencies
01

20 to 30 closed permits

Right-of-way, encroachment or lane closure permits with their conditions, from several cities and counties. Include one the agency sent back and one that needed an extension.

02

The packet your designer built

The plan set or reference sheet that went in, its cover notes and attachments, and the agency's comments on each round.

03

The job behind each permit

The customer's scope, the street and dates requested, and the notice letters or message board schedule your team sent out.

04

An NDA, or stand-in permits

The NDA gets signed ahead of any copying. If permits must stay put, we build look-alikes with your reviewer. Nobody from Massmarket signs in to a permit portal, your plan software or your dispatch system.

// Before it starts

Settled while every permit is still in your files

A packet can look tidy and still miss one condition, so your owner decides how a miss counts before a copy is made.

Terms for the permit packet testOwner decides
Your reviewer
Named by the owner: commonly the traffic control designer or permit lead
Success criteria
On paper: which conditions must appear, and how a missed one scores
The permits
Your reviewer's pick: several agencies, lane and full closures, short and long
Who signs
A certified designer, on every plan, as the agency requires
Price
A range for running it live, before any permit is copied
NDA
Both signatures before the first permit moves

// How the test is judged

What your team filed beside each draft packet

Permit by permit
condition by condition
On the same 20 to 30 permitsThe packet you filedDraft from the test
Hours allowed, day and night, as statedFilled in on your permitsFilled in on your permits
Lane closure limits, as statedFilled in on your permitsFilled in on your permits
Notification periods and who gets toldFilled in on your permitsFilled in on your permits
Typical plans or drawings the agency namesFilled in on your permitsFilled in on your permits
Credential and signature the agency asks forFilled in on your permitsFilled in on your permits
Requirements with no matching documentFilled in on your permitsFilled in on your permits
Time from permit in hand to a packet ready to checkFilled in on your permitsFilled in on your permits
Nothing scored yet. Each cell waits for a permit from your own files.Your reviewer marks every row and gives the verdict.

// After a yes

A month or so on new permits

If your reviewer says yes, new permits get the same draft packet for about 30 days.

Someone on your team approves each packet before it goes anywhere, and a certified designer still draws and signs every plan. Your office files with the agency the way it does today.

The side-by-side comparison carries on with live permits. Any job after this one is a fresh decision with a price of its own, and monthly support once it runs.

// Possible next jobs

After permit packets, if it earns the next one

Ranked, not promised
One price each
  1. 01

    Device and flagger billing logs

    Daily field tickets read against each customer's rate sheet, with every difference listed for billing.

    Next
  2. 02

    Permit expiry and extension tracking

    Open permits listed with their end dates and each agency's deadline for asking to extend.

    Then
  3. 03

    Flagger and supervisor card files

    Each person's card type, issuing state and expiration date on one list for whoever staffs crews.

    After that

// One hard limit

The AI draws no plan and calls no closure allowed.

The proof of concept reads copies and drafts a packet. It never touches your dispatch or billing system, a permit portal, a live plan or a live invoice, and it never designs a traffic control plan, decides that a closure is allowed, changes an invoice or contacts an agency or customer. A certified designer signs every plan. The agencies and rules named on this page differ by place and change over time, and nothing here is legal or engineering advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob gives the range on the call, once he knows how many permits you pull in a month and how many different agencies issue them.

// Questions

Permit packet questions

Does the AI design the traffic control plan?
No. The draft is the reading that comes before the plan: conditions, hours, notices and references. Your certified designer chooses the layout, draws the plan and signs it.
Can it tell us whether a lane closure will be allowed?
No. It copies what the permit and the agency's guidance say, with the page each line came from. Whether a closure fits, and whether to ask for an exception, stays with your designer and the agency.
What if an agency's conditions live only on its website?
Print or save the page with the date showing and put it in the sample. The draft cites what it was given and marks a condition that has only a link behind it, so your reviewer can see how current the source was.
Does it handle both city permits and state encroachment permits?
Yes, if both are in the sample. Each draft names the agency and the documents it read, and it keeps one agency's typical drawings from landing on another agency's street.
Do you need access to our plan drawing software?
No. The test runs on packets and conditions as they left your office, whether they came out of a drawing program or a scanner. Your software stays exactly as it is.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Bring the permit that came back with comments.

Thirty minutes with Rob: what you do, your role, which agencies you file with and about how many permits a month go through your office. Permits and plans stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.