// Traffic control companies · Permit plan packets
Permit plan packets, read from the right-of-way permit into a draft for your traffic control designer.
Before anyone draws a taper, somebody has to work out what this city will allow on this street, in these hours, with how much warning. In a free AI proof of concept on copies of 20 to 30 permits you already closed, AI drafts that packet and lists every requirement with no matching document. Your reviewer, the designer or permit lead who knows these agencies best, sets each draft beside what your office actually filed.
- Past permits
- 20 to 30
- Plans designed by the AI
- None
- Permit portals opened
- None
// The one job
From a permit's conditions and a job's scope to a packet your designer can start from
A customer sends a scope: a utility cut on a collector, a crane set on a downtown block, a paving shift on an arterial. Someone at your office reads the agency's permit conditions beside it, sorts out which hours apply, how many lanes can close and for how long, who must be told and how far ahead, which typical drawings the agency accepts, and what has to be attached. Only then does your designer open the drawing.
In the test, AI reads copies of those same papers and drafts the packet: hours allowed, lane closure limits as stated, notification periods with who gets notified, the typical plan references the agency names, and a list of every requirement with no matching document. It draws nothing and files nothing. Your reviewer checks each draft against the packet your team sent.
one packet
// What makes it hard
What a permit packet has to catch before the plan is drawn
Allowed hours come in layers. San Diego's Information Bulletin 177, dated May 2026, sets standard workdays at Monday through Friday, 8:30 a.m. to 3:30 p.m., and night work at Sunday through Thursday, 9 p.m. to 5 a.m. Wilmington, North Carolina's September 2024 worksheet says contractors generally work 7 a.m. to 6 p.m., then takes away 6 to 9 a.m. and 4 to 7 p.m. on major roadways, weekends on those roadways, and city holidays along with the day before and the day after. Its school zone line says closures are generally restricted from 9 a.m. to 2 p.m., which a careful reader could take either way. The draft quotes a line like that and hands it to your designer instead of picking a meaning.
Lane limits depend on what closes. Brazoria County's toll road authority, in a policy adopted in July 2022, allows a shoulder or a single managed lane to close from 9 a.m. to 3 p.m. on weekdays and 10 p.m. to 5 a.m. at night, with a weekend window from 10 p.m. Friday to 5 a.m. Monday. Two lanes, a ramp, a connector or a total closure get no weekday daytime window at all. Seattle's Client Assistance Memo 2111 holds a lane left open in one direction to a minimum of 11 feet, or 10 feet with spotters or flaggers, and wants separate work-hours and non-work-hours plans, with a new plan at each construction phase change even when the devices stay put. Houston takes its standard traffic drawings for a single lane, needs a plan before permit approval for multiple lanes or a full closure, and asks for the approved plan's EAM number on the application.
Notice runs on several clocks at once. San Diego wants five working days' warning before work begins, the same five days for police and fire dispatch, no-parking signs up 72 hours ahead, and any extension request five working days before the permit expires. Its permit runs up to three weeks, with extensions for up to six. Wilmington asks for 72 hours with businesses on the block, three days for handouts and three to five days for message boards. Brazoria County takes a standard closure request 48 hours out and a total or ramp closure three weeks out, and for a major pattern change wants changeable message signs posted two weeks ahead. Houston requires seven days of public notice for a full street closure. The draft turns each one into a line with its own party and its own lead time.
Typical plans are the agency's own shorthand. Wilmington's worksheet pairs closure types with MUTCD typical applications, TA-18 for a lane on a minor street and TA-28 or TA-29 for a sidewalk, and with North Carolina's drawings 1101.02 and 1103.03. It then sorts submissions into four levels, from standard details up to a site-specific plan with a detour or message boards and a written summary. On a Tukwila, Washington fast-track permit, the applicant just cites a state plan, TC-420 for flagging or TC-16 for a sidewalk. Pennsylvania's Publication 213 calls its figures PATA, and its March 2021 revision stretched a short-term operation from under 24 hours to under 72 and added PATA 116B, a red-arrow detour for roads carrying under 1,500 vehicles a day. Minnesota lists three district lane closure manuals beside its 2018 field manual. The draft copies each reference exactly and says nothing about whether it fits the street.
The signature line changes too. Tukwila's May 2026 guide sends higher-tier work to a custom 11-by-17 plan stamped by a certified Traffic Control Supervisor or a Professional Engineer, and any field deviation belongs to whoever stamped it. A speed limit of 40 miles an hour or more, night work, work within 300 feet of a signal or a pedestrian path in the roadway puts a job in the top tier, where the supervisor stays on site and files a daily log. Wilmington accepts a plan based on its standards or from a certified professional or engineer. Texas, in its 2024 Item 502, wants contractor-proposed changes to a plan signed and sealed by a licensed professional engineer. Brazoria's request form asks for the applicable standard or a signed and sealed drawing. So the draft names the credential each agency asks for and leaves the signature blank. Your reviewer will check that every stated restriction reached the page, that no limit was invented, that each attachment answers a requirement, and that the missing-document list holds up. None of this is legal or engineering advice, and each agency's current permit controls.
// What you send
Permits your office has already closed
20 to 30 closed permits
Right-of-way, encroachment or lane closure permits with their conditions, from several cities and counties. Include one the agency sent back and one that needed an extension.
The packet your designer built
The plan set or reference sheet that went in, its cover notes and attachments, and the agency's comments on each round.
The job behind each permit
The customer's scope, the street and dates requested, and the notice letters or message board schedule your team sent out.
An NDA, or stand-in permits
The NDA gets signed ahead of any copying. If permits must stay put, we build look-alikes with your reviewer. Nobody from Massmarket signs in to a permit portal, your plan software or your dispatch system.
// Before it starts
Settled while every permit is still in your files
A packet can look tidy and still miss one condition, so your owner decides how a miss counts before a copy is made.
- Your reviewer
- Named by the owner: commonly the traffic control designer or permit lead
- Success criteria
- On paper: which conditions must appear, and how a missed one scores
- The permits
- Your reviewer's pick: several agencies, lane and full closures, short and long
- Who signs
- A certified designer, on every plan, as the agency requires
- Price
- A range for running it live, before any permit is copied
- NDA
- Both signatures before the first permit moves
// How the test is judged
What your team filed beside each draft packet
| On the same 20 to 30 permits | The packet you filed | Draft from the test |
|---|---|---|
| Hours allowed, day and night, as stated | Filled in on your permits | Filled in on your permits |
| Lane closure limits, as stated | Filled in on your permits | Filled in on your permits |
| Notification periods and who gets told | Filled in on your permits | Filled in on your permits |
| Typical plans or drawings the agency names | Filled in on your permits | Filled in on your permits |
| Credential and signature the agency asks for | Filled in on your permits | Filled in on your permits |
| Requirements with no matching document | Filled in on your permits | Filled in on your permits |
| Time from permit in hand to a packet ready to check | Filled in on your permits | Filled in on your permits |
// After a yes
A month or so on new permits
If your reviewer says yes, new permits get the same draft packet for about 30 days.
Someone on your team approves each packet before it goes anywhere, and a certified designer still draws and signs every plan. Your office files with the agency the way it does today.
The side-by-side comparison carries on with live permits. Any job after this one is a fresh decision with a price of its own, and monthly support once it runs.
// Possible next jobs
After permit packets, if it earns the next one
- 01Next
Device and flagger billing logs
Daily field tickets read against each customer's rate sheet, with every difference listed for billing.
- 02Then
Permit expiry and extension tracking
Open permits listed with their end dates and each agency's deadline for asking to extend.
- 03After that
Flagger and supervisor card files
Each person's card type, issuing state and expiration date on one list for whoever staffs crews.
// One hard limit
The AI draws no plan and calls no closure allowed.
The proof of concept reads copies and drafts a packet. It never touches your dispatch or billing system, a permit portal, a live plan or a live invoice, and it never designs a traffic control plan, decides that a closure is allowed, changes an invoice or contacts an agency or customer. A certified designer signs every plan. The agencies and rules named on this page differ by place and change over time, and nothing here is legal or engineering advice.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
Rob gives the range on the call, once he knows how many permits you pull in a month and how many different agencies issue them.
// Questions
Permit packet questions
Does the AI design the traffic control plan?
Can it tell us whether a lane closure will be allowed?
What if an agency's conditions live only on its website?
Does it handle both city permits and state encroachment permits?
Do you need access to our plan drawing software?

Rob Eason, founder
// Book a proof of concept call
Bring the permit that came back with comments.
Thirty minutes with Rob: what you do, your role, which agencies you file with and about how many permits a month go through your office. Permits and plans stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.