30-min call with RobBook a proof-of-concept call
Job 02 · Medical gas

// Plumbing contractors · Or start here

Medical gas testing records drafted from your crew's logs, before the verifier is booked.

Installer testing records for medical gas and vacuum piping in hospitals, surgery centers and clinics, tested as a free AI proof of concept on 20 to 30 records your crews already signed. AI reads the daily logs, pressure readings and gauge photos behind each area, drafts the record test by test and gas by gas, and lists every blank the logs leave. Your foreman compares each draft with the record the crew signed.

Book a proof-of-concept call30 minutes with Rob
Past records
20 to 30
Tests passed or signed by AI
None
Contact with verifiers
None

// The one job

The crew runs the tests. Somebody still has to write them up.

Take a surgical suite renovation in a hospital wing: new outlets for oxygen, medical air and vacuum, nitrous oxide in two rooms, a WAGD line, zone valve boxes and an area alarm. Before a verifier is booked, your crew runs the installer tests one system at a time and logs them: pressures with start and stop times, a photo of each gauge, the outlets flowed for the cross-connection test, a leak found at a joint and rebrazed. Someone then writes up the area's testing record, pulls the brazing papers into the job file, and the ASSE 6010 foreman signs.

In the proof of concept, AI builds the draft testing record for each area from the same logs and photos, and lists every missing date, reading, hold time, witness and brazer record. It never marks a test passed, signs the record or speaks to a verifier. Your foreman sets each draft beside the record the crew actually signed.

Daily test logCrew's notes
Area
System
Gauge photo
Brazer
TestPressureTime
Illustration, not one of your logs
Written up
test by test
Testing recordDraft, unsigned
Facility and area
Test gas
Witness
Brazer file
SystemTested byMissing
Illustration, not a real record

// Where it gets hard

Seven tests, eight systems, and a witness who isn't on your payroll

The record lists seven tests, with a row for each system. The installer performance testing record Hamilton County Public Health in Ohio posts, revised in September 2014, says testing follows ASSE 6010 and NFPA 99, is done only by credentialed medical gas installers, and uses nitrogen NF; Kentucky's Department of Housing, Buildings and Construction posts a record of the same title. The tests run in order: initial blowdown, initial pressure test, initial pressure test for vacuum piping, initial cross-connection test one system at a time, piping purge, then 24-hour standing tests for positive pressure piping and for vacuum. Rows run from oxygen, medical air, nitrous oxide, carbon dioxide and nitrogen to instrument air, medical-surgical vacuum and WAGD, under the columns date, tested by, pass or fail, and test accepted by. The initial pressure test is at one and a half times working pressure with a 150 psig floor, and the standing vacuum test holds 12 inches of mercury.

Brazing papers come before the first joint. The 2025 California Plumbing Code wants installers certified to ASSE/IAPMO/ANSI 6010, and before any installation work it has the installer keep the brazing procedure and brazer qualification records on the job site. Those records state the filler metal, base metals, cleaning and joint clearance. A brazer qualifies on a test coupon examined visually and then sectioned, and stays qualified indefinitely unless more than six months pass without brazing under that procedure or there is a specific reason to doubt the brazer's ability. An employer relying on an outside group's procedure, or on a brazer's records from an earlier employer, signs and dates copies of them. The draft lists each brazer named in the logs and whether a record for that brazer is in the job file, and leaves whether it still holds to your foreman.

One test needs a witness, and the verifier wants proof of it. Under the same code, the 24-hour standing pressure test on positive pressure piping is witnessed by an ASSE 6020 inspector, an ASSE 6030 verifier, or the authority having jurisdiction or its designee, and a form showing it was performed and witnessed goes to the verifier when the verifier's tests begin. The standing vacuum test is witnessed by the authority having jurisdiction or its designee. Leaks found along the way are located, repaired or replaced, and retested. The draft lists a standing test with no witness named, and a repaired joint with no retest logged after it, as gaps for your foreman before anyone else asks.

The verifier is somebody else. New Mexico's medical gas rule, in force since November 15, 2019, has systems verified by third parties meeting ASSE 6030, who may not be, or work for, the installing contractor, the design professional or the manufacturer, or represent an equipment distributor, and no state or local inspector there issues a final inspection without complete documentation from the verifier. Installers there are certified journeymen meeting ASSE 6010, endorsed after a 32-hour course, recertified every three years and allowed up to two apprentices each on commercial work. The installer's record is the contractor's own, and this test stays on that side of the line.

What your foreman will check first: every system piped in the area listed under every test that applies to it, pressures and hold times carried from the logs into the right test, retests after a repair kept as their own entries, tested-by names that match certified installers on the job, and the accepted-by and witness lines left blank for the people who sign them.

// What you send

What the test needs from your medical gas jobs

20 to 30 records
Copies only
01

20 to 30 signed testing records

Installer records as signed, one per area or phase, from several health care jobs, including some where a leak was found, repaired and retested.

02

The logs behind them

Daily reports, pressure logs, gauge photos, outlet lists and the zone drawings the crew worked from, in whatever form they were kept.

03

Brazing and installer papers

The brazing procedure and brazer qualification records and the ASSE 6010 cards from each job file, plus any witness forms that went to a verifier.

04

NDA first, look-alikes if needed

Hospital drawings and facility details are covered by the NDA, signed before anything moves. Where an owner won't release them, we build look-alike records with your foreman.

// Before it starts

Settled before the first log is copied

The owner names the judge and the pass mark before any record leaves the office.

Medical gas record test termsOwner signs off
Reviewer
Named by the owner. Often the ASSE 6010 foreman or the medical gas project manager.
Success criteria
In writing first, including how a wrong reading and a missed blank each count
Records
Drafted only. Never signed, witnessed or passed by AI
Price
A live-job range agreed before any copying starts
NDA
Signed before any log, drawing or record moves

// How it's judged

Each draft beside the record your crew signed

Area by area
Test by test
Same 20 to 30 recordsThe signed recordThe proof of concept
Every system in the area listed for each testFilled in from your recordsFilled in from your records
Dates, pressures and hold times carried from the logsFilled in from your recordsFilled in from your records
Leak repairs and retests kept as separate entriesFilled in from your recordsFilled in from your records
Tested-by names matched to certified installersFilled in from your recordsFilled in from your records
A brazer record found for each brazer namedFilled in from your recordsFilled in from your records
Witness and acceptance lines left for the right personFilled in from your recordsFilled in from your records
Blank until your records are drafted. No row shows a score before your own logs have been read.Your foreman scores each row against the criteria agreed first.

// After a yes

About 30 days on the jobs you have open

After your foreman's yes, records for new areas are drafted for about 30 days as crews hand in their logs.

Every draft goes to the installer who ran the tests. They correct it, make every pass or fail call, sign it and hand it on to the verifier as they do today. No draft goes to a facility, an inspector or a verifier on its own.

The live job is priced at a fixed figure agreed after the test. Backflow reports, or another job, are priced on their own, and monthly support starts once a job is live.

// After medical gas records

What could come next

Ranked possibilities
Each after its own yes
  1. 01

    Backflow test reports

    Each annual assembly test drafted from the tester's notes onto the water purveyor's form, for the certified tester to sign and file.

    Next
  2. 02

    Installer and brazer register

    Every installer's ASSE card number and renewal date, and each brazer's qualification records, kept in one list across all your jobs.

    Then
  3. 03

    Zone valve and alarm lists

    Zone valve boxes and area alarms listed from the drawings with the rooms and outlets each one serves, for your foreman to check against the labels.

    After that

// One hard limit

It drafts the record. It never signs, witnesses or passes a test.

The proof of concept never signs or certifies an installer testing record, never decides that a test passed, never witnesses or verifies a system, and never prices or sends a quote. It contacts no facility, verifier, inspector or authority having jurisdiction, and it works only on copies. Your ASSE 6010 installer decides and signs. Which NFPA 99 edition and plumbing code apply stays with your people and the authority having jurisdiction, and nothing on this page is compliance advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range comes on the call, once we know roughly how many medical gas areas your crews test in a quarter and how many testing record forms they use.

// Questions

Medical gas record questions from foremen and PMs

Will the AI mark tests passed or sign the record?
No. The ASSE 6010 installer who ran each test makes the pass or fail call and signs. The draft carries the readings and marks from the logs as written, and lists what is blank or missing.
Does this replace the verifier's tests or report?
No. Verification is a separate round done by a separate, qualified party, and its tests and written report are the verifier's own. The proof of concept covers only your installer record and never contacts a verifier.
Our crews write pressures on tape and photograph the gauges. Is that enough?
Yes, if that is what they keep. Send the logs and photos as they are; anything the draft can't read or place is listed as a gap for your foreman, never filled in by guesswork.
Which edition of NFPA 99 does the draft follow?
None on its own. It follows the testing record form you send and lists what that form asks for that the logs don't show. Which edition and local code apply is decided by your installer and the authority having jurisdiction.
Do patient records or hospital security details have to leave our office?
Patient records are never part of it. The test needs only your logs, the drawings for the areas tested and the signed records, all under the NDA, and look-alikes are built where a facility won't allow copies.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring the testing records from your last two hospital jobs.

Half an hour with Rob about your company, your role, the job to start with and roughly how many medical gas areas your crews test in a quarter. Keep logs and drawings in the office until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.