30-min call with RobBook a proof-of-concept call
Job 01 · Backflow testing

// Plumbing contractors · Start here

Each backflow test drafted onto the purveyor's form, with every gap listed for your tester.

Backflow test reports for commercial buildings, tested as a free AI proof of concept on 20 to 30 reports your certified testers already signed and filed. AI reads the field sheet, gauge photos and nameplate shots behind each test, drafts the report on the form of the purveyor that serves the building, and lists every reading, date or license detail the notes don't show. Your reviewer compares each draft with the report your tester actually signed.

Book a proof-of-concept call30 minutes with Rob
Past reports
20 to 30
Reports signed or filed by AI
None
Portal logins
None

// The one job

The test takes minutes at the assembly. The report waits at the office.

Picture a tester's morning at a medical office building: a reduced pressure assembly on the domestic service, a double check detector on the fire line, a pressure vacuum breaker on the irrigation. Readings go onto a test sheet or a tablet, the gauge and each nameplate get photographed, and the truck moves on. Later someone in the office types each assembly onto the form of the purveyor serving that address and chases the tester for whatever is blank before it can be signed and filed.

In the proof of concept, AI does that typing from the same notes and photos: one draft per assembly, laid out the way that purveyor's form is, plus a list of what the notes leave out. It never signs a report, marks a pass or files anything. Your reviewer sets each draft beside the one your tester signed, box by box.

Field sheetTester's notes
Address
Assembly
Serial
Gauge
CheckReadingNote
Illustration, not one of your sheets
Placed on the
purveyor's form
Test reportDraft, unsigned
Purveyor
Assembly type
Kit accuracy date
License
TestResultMissing
Illustration, not a real report

// Where it gets hard

Every purveyor's form wants something the field sheet forgot

The form sets the order of the work. Texas's version, form TCEQ-20700, is meant to be filled in at the assembly while the test runs, and an electronic copy counts only if the tablet was there too. Each assembly gets its own form, and a retest by a different licensed tester goes on a separate one. It names six assembly types (RPBA, RPBA-D, DCVA, DCVA-D, PVB and SVB), wants the old model and serial number when an assembly was replaced, and only fits a Type II detector assembly with a single check bypass. On a double check, the second check needs a number, not just a box. The licensed tester signs the printed original for the public water system unless the commission has approved electronic recordkeeping, and records are kept at least three years.

Washington asks for things Texas doesn't. Its report rule, in force since January 2014, wants the downstream hazard in the state's own categories when the tester knows it, whether the air gap under a reduced pressure assembly's relief valve meets the requirement, and any missing or defective part, shutoff valves and test cocks included. It also wants the tester's department-issued certification number, a statement that the tester personally inspected and field tested the assembly, and a signature that may be original, a copy, a fax or electronic. A draft built for one state's form leaves holes on another's, so the success criteria name every form in your sample.

The gauge is part of the record. Texas wants the differential pressure gauge's make, model, serial number and accuracy date on every report, an accuracy check each year, and a gauge used on potable assemblies kept off non-potable ones; the form asks which kind the gauge serves and whether the assembly sits on an auxiliary supply. Washington asks for the date of the kit's latest laboratory accuracy check or calibration. EPA's manual describes the instrument as a differential gauge with a 0 to 15 psi range and a 500 psi working pressure. When a sheet names the kit but no accuracy date, the draft lists the date as missing instead of carrying last year's forward.

Procedures and credentials change under your testers. Texas bases its tester license on the field test procedures in the USC Foundation for Cross-Connection Control and Hydraulic Research's Manual of Cross-Connection Control, Tenth Edition, first printed in December 2009. The Foundation's fifth printing, dated 2020, corrected errors in Appendix A that it says also appear in its laminated field test procedures dated 2020.01.15. In California, testers used by public water systems need certification from an organization the State Water Board recognizes from July 1, 2026, and from July 1, 2027 only from organizations accredited by ANSI to ISO/IEC 17024; the board recognized ASSE 5110 in a letter dated June 17, 2025. The draft prints the license your office has on file and lists one with no number or a past expiry, leaving whether it is acceptable to your tester and the purveyor.

Field notes are rarely tidy. EPA's manual has the tester get the owner's permission before shutting the water off, warns that hospitals and continuous process plants can't lose supply without a planned, coordinated shutdown, and offers two assemblies in parallel as one way to keep water flowing. On a reduced pressure assembly it says to wait a moment before connecting hoses, since water from the relief valve probably means a fouled first check and the test can't go on until it is serviced. So a real sample holds postponed tests, repairs and retests on a later visit; the draft keeps the initial test apart from the test after repair and copies each part as written. Your reviewer will look first at readings in the right boxes for the assembly type, serial numbers that match earlier reports, complete kit and license details, and any box filled where a gap should have been listed.

// What you send

What the test needs from your backflow desk

20 to 30 reports
Copies only
01

20 to 30 signed reports

Reports as they were filed, from several purveyors and testers, with some repairs and retests among them, not only clean first passes.

02

The notes behind each one

Field test sheets or tablet exports, photos of gauges and nameplates, and any note about a shutdown, a parallel assembly or a second visit.

03

Kit and license records

The accuracy certificate for each test kit in the sample and each tester's license or certification, as your office keeps them today.

04

Blank forms, then the NDA

A blank copy of each purveyor's form and its instructions. The NDA is signed before anything moves, and where a building owner won't allow copies, we build look-alike reports with your reviewer.

// Before it starts

Agreed before a single report is copied

The owner names who judges the drafts and what counts as a pass before anything is sent.

Backflow report test termsOwner signs off
Reviewer
Named by the owner. Often the lead certified tester, or whoever checks reports before filing.
Success criteria
In writing first, including how a wrong box and a missed gap each count
Reports
Drafted only. Never signed, passed or filed by AI
Price
Your range for running it live, given up front
NDA
Signed before any report or photo moves

// How it's judged

Each draft beside the report your tester signed

Assembly by assembly
Box by box
Same 20 to 30 testsThe signed reportThe proof of concept
Assembly type, make, model, size and serialFilled in from your reportsFilled in from your reports
Readings placed in the right boxesFilled in from your reportsFilled in from your reports
Initial test kept apart from the test after repairFilled in from your reportsFilled in from your reports
Kit serial number and accuracy dateFilled in from your reportsFilled in from your reports
Tester license or certification and expiryFilled in from your reportsFilled in from your reports
Gaps listed that your office had to chaseFilled in from your reportsFilled in from your reports
Empty until your reports are in. No row is scored before your own copies have been drafted.Your reviewer marks each row against the criteria agreed first.

// After a yes

About 30 days on this season's tests

After your reviewer's yes, new tests are drafted for about 30 days as testers turn in their notes.

Each draft goes back to the tester who did the work. They fix it, make the pass or fail call, sign it and file it through the purveyor's portal or by mail, the same as today. No draft reaches a building owner or a purveyor on its own.

The live job carries a fixed price agreed after the test. Medical gas testing records, or any other job, are priced separately, and monthly support begins once a job is live.

// After backflow reports

What could come next

Ranked possibilities
Each after its own yes
  1. 01

    Medical gas installer testing records

    The installer's tests on a health care job drafted gas by gas from the crew's pressure logs, for the ASSE 6010 foreman to sign.

    Next
  2. 02

    Assembly lists by building

    Every assembly your office tests, with its location, serial number, purveyor and last test date, gathered per building from past reports.

    Then
  3. 03

    Cross-connection survey write-ups

    A surveyor's walk-through notes placed on the purveyor's survey form, each hazard and assembly they mention listed for the surveyor to confirm.

    After that

// One hard limit

It drafts the report. It never signs, files or passes one.

The proof of concept never signs or certifies a backflow test report, never decides that an assembly passed or failed, never files with a purveyor or its portal, and never prices a repair or sends a quote. It contacts no building owner, purveyor or inspector, and it works only on copies. Your certified tester decides and sends. Which rules apply stays with them and the purveyor, and nothing on this page is compliance advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range comes on the call, once we know roughly how many assemblies your testers report on each year and how many purveyors' forms they fill in.

// Questions

Backflow report questions from testing managers

Will the AI decide whether an assembly passed?
No. Pass or fail is the certified tester's call at the assembly. The draft copies the mark the tester made and the readings behind it; where the two look inconsistent, it points at both and leaves the answer to the tester.
Does it file reports with the water purveyor?
No. Filing by portal, email or a mailed original stays with your office and your tester. The draft is finished, checked and signed by your people before any of that starts.
Our testers write on paper and photograph the gauge. Is that enough?
Yes, if that is how they work. Send what they really hand in, handwriting and photos included. Anything the draft can't read is listed as unreadable, never guessed.
Can it handle detector assemblies on fire lines?
Include them if your testers test them. Forms such as the Texas one have separate boxes for reduced pressure and double check detector assemblies and their bypass. Who may test a fire line is set by your jurisdiction, not by us.
Which test procedure and gauges does it assume?
None of its own. It records the kit and the procedure your tester used, as the notes show them, and lists a missing kit serial number or accuracy date. Whether a kit or procedure is acceptable is a question for your tester and the purveyor.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring reports from three different purveyors.

30 minutes with Rob on your company, your role, the job you'd start with and about how many assemblies your testers report on in a year. Nothing needs to be sent before the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.