30-min call with RobBook a proof-of-concept call
Job 02 · Closeout

// Firestopping contractors · Firestop inspection records

Firestop inspection records pulled into one closeout draft, with every missing record and open deficiency listed.

By closeout, the history of each firestop sits in installers' logs, an inspector's reports and a folder of photos. A free AI proof of concept assembles those into one draft record, using copies of 20 to 30 closeouts you already turned over. Your reviewer, the person who builds those packages today, compares each draft with the record the owner actually received.

Book a proof-of-concept call30 minutes with Rob
Past closeouts
20 to 30
Inspections signed
None
Installations passed by AI
None

// The one job

From three piles of paper to one closeout record

Installers write down what they sealed and where. The inspector's reports say what was looked at, on what day and how it came out. Photos and label notes live somewhere else. Near the end of a job, someone ties those together location by location, chases whatever is missing, and hands the owner a package.

In the test, AI reads copies of those same records and drafts the closeout record: location, system number, installer, date, photo reference and inspection result, with a separate list of locations that have no record or still show an open deficiency. It quotes the inspector's words instead of restating them. It signs nothing and passes nothing, and your reviewer sets every draft beside the record you delivered.

Logs and inspector reportsInputs
Location
System no.
Installer
Date
LocationResultPhoto
Made-up records, for illustration
Tied together
by location
Closeout recordDraft
Location
System no.
Inspector
Status
LocationResultOpen item
Made-up closeout, no real job shown

// What makes it hard

Three records of the same firestop rarely agree

One hospital's form shows the grain the owner expects. Cleveland Clinic publishes a Fire Stop Penetration Tracking Form with a row for every penetration: item number, contractor, room number, penetration location and type, description, wall or floor rating, UL system or engineering judgment number, third-party pass or fail, and inspection date. Above the rows sit a permit number with issue and expiration dates, each worker's certification number and expiration, the third-party inspector and company, and a permit status of closed, still active or cancelled. Loose logs rarely carry all of that. The draft fills the columns your reviewer names and leaves the blanks showing.

The label on the wall is one more record. New York State's master section wants a warning, the contractor's name, address and phone, the testing agency's designation, the installation date, the manufacturer and the installer on a label within 6 inches of the system. The University of Maryland, Baltimore says within 4 inches and asks for the UL design number. The Dormitory Authority of the State of New York adds the inspector's name where one applies. Where a photo or a typed note shows the label, the draft sets its system number beside the log's and the inspector's and lists any that differ.

The dates have to run in order. New York and the University of Maryland, Baltimore both hold off enclosure until inspection reports are issued, and the university charges re-inspections to the contractor. NIH won't let a firestop be painted or concealed until its Division of the Fire Marshal has approved it, though work left exposed can wait for the pre-occupancy inspection. The International Firestop Council's 2025 pocket guide expects walk-throughs at rough and at final. The Dormitory Authority keeps a three-ring Firestop Application Log on site, updated as assemblies are added, so the list in the office and the list on site can drift apart. The draft shows every install, inspection and cover date it finds and marks any location where the order looks wrong.

One location can have several results. New York's section notes that ASTM E2174, Standard Practice for On-Site Inspection of Installed Fire Stops, keeps the contractor from hiring the testing agency, and that inspectors may cut into some finished work. Whatever is found wrong or removed for testing gets repaired or replaced. The Dormitory Authority sends more destructive testing after a non-conformance, at the installer's cost. The Council's inspection video says confirming sealant depth usually takes a destructive look, and that repeated problems can mean rejecting the whole job. So the draft keeps each event in date order: failed, replaced, looked at again. Nothing shows as closed without a later entry from the inspector saying so.

Closeout is more than a stack of reports. Beth Israel Deaconess Medical Center's above-ceiling policy makes final inspection and permit sign-off a condition of contract close-out and release of retainage, and has contractors report any existing or latent penetrations they find. Slides posted by the American Society for Health Care Engineering put it flatly: a penetration permit is not a closeout, and the installer worksheet is the log of who, what, when and how. UL's contractor program wants inspection reports kept with project records along with corrective actions, for 7 years or as code requires. Your reviewer will look for a pass with no installer entry behind it, a system number that changes between records, a deficiency closed without re-inspection, a photo filed under the wrong room, and any sentence that sounds like a verdict. These rules are summarized for context and are not legal, code or engineering advice.

// What you send

Closeouts your team already turned over

Copies only
Owner's restrictions respected
01

20 to 30 finished closeouts

Packages delivered to hospitals, schools, data centers or offices. Include one with a failed inspection, one with destructive testing, and one the owner sent back.

02

Installers' logs

Daily sheets, worksheets or exports showing what each crew sealed, where, on what date and under which system number.

03

The inspector's reports

Reports and deficiency lists from your third-party inspector or the authority having jurisdiction, as you received them, plus any re-inspection notes.

04

Photos, once the NDA is signed

Photo logs and label shots, with anything an owner forbids removed first. No one on our side signs in to your firestop application or job cost system.

// Before it starts

Agreed before any closeout is shared

The owner settles each of these in writing, ahead of the first copy.

Closeout test termsSet by the owner
Your reviewer
The owner's pick: often whoever assembles closeouts or a senior project manager
Success criteria
In writing: locations tied, gaps found, open deficiencies caught
Record format
The columns each owner received, chosen by your reviewer
Who signs
A qualified inspector, every inspection, always
Price
A range for running it live, ahead of day one
NDA
Signed before any file is copied

// How it's judged

The record you delivered beside each draft

Location by location
against what the owner received
Across the same 20 to 30 closeoutsRecord you deliveredThe AI draft
Locations listed, as on your recordFilled in from your closeoutsFilled in from your closeouts
System number at each locationFilled in from your closeoutsFilled in from your closeouts
Installer and installation dateFilled in from your closeoutsFilled in from your closeouts
Photo reference filed to the right locationFilled in from your closeoutsFilled in from your closeouts
Inspection result, quoted from the reportFilled in from your closeoutsFilled in from your closeouts
Locations with no record, listedFilled in from your closeoutsFilled in from your closeouts
Deficiencies still open at turnoverFilled in from your closeoutsFilled in from your closeouts
Time from last inspection to a record ready to checkFilled in from your closeoutsFilled in from your closeouts
Blank until yours run. No result appears here before your own closeouts have been read.Your reviewer marks every row and owns the verdict.

// After a yes

About a month of new closeouts

Following your reviewer's yes, jobs nearing closeout get the same draft for about 30 days.

A person on your team approves every record, a qualified inspector still signs every inspection, and nothing reaches an owner until your team sends it.

Your reviewer keeps comparing the drafts with what goes out. Any further job carries a price of its own.

// Possible next jobs

After closeout records, if you want more

Ranked, not promised
Each priced alone
  1. 01

    Penetration system schedules

    Field logs compared with the rated barriers and listed systems on file, with unmatched penetrations held for your project manager.

    Next
  2. 02

    Deficiency punch lists by crew

    Open items from each inspection report sorted by floor and crew, so a foreman knows what to go back and fix.

    Then
  3. 03

    Turnover records for facilities teams

    The finished record reshaped into the room and barrier format a hospital or campus uses to maintain its life safety drawings.

    After that

// One hard limit

A qualified inspector signs every inspection.

This test reads copies of finished closeouts. It never touches a firestop management application, job cost system or live record, never picks a listed system, never decides that an installation meets a listing, never signs or changes an inspection report, and never contacts an owner, inspector or authority. Your project manager, with the design team and authority having jurisdiction, decides every system. This page gives no legal, code or engineering advice, and certified payroll is out of scope.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call, once he knows how many closeouts you turn over in a year and how many locations a typical one covers.

// Questions

Firestop closeout questions

Will the AI pass or sign an inspection?
No. Every result in the draft is copied from what the inspector reported, with its report and date. A qualified inspector signs every inspection, and the draft never says that an installation meets a listing.
What if a location has an installer's entry but no inspection?
It goes on the open list with whatever the log shows: location, system number, installer and date. The draft doesn't assume it was inspected, and your project manager decides what to do about it.
Our inspector works for the owner. Can we use those reports?
Yes, if you are allowed to share your copies under the NDA. The test only reads what you already hold, so nobody contacts the inspector or the owner.
Can it read photos of firestop labels?
When a label is legible, the draft reads the system number and date and compares them with the log. When it isn't, the photo stays filed by location and the label field is marked unreadable for a person to check.
Can the draft match an owner's own tracking form?
Yes. Your reviewer names the columns each owner received, such as room number, penetration type or engineering judgment number, and the draft uses those. Columns your records can't fill stay empty and are listed.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with a closeout that had a failed inspection in it.

Half an hour with Rob on your company, your role, the owners you turn over to and about how many closeouts you finish a year. Logs, reports and photos stay in your office until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.