// AI for electrical testing companies
AI for electrical testing companies, tried first on reports you already signed.
For independent firms that run acceptance and maintenance testing on switchgear, transformers and protective devices in commercial buildings, hospitals and plants. Begin with the acceptance test report package, or with the field data sheets behind a power system study. Either one becomes a free AI proof of concept on copies of 20 to 30 packages or sheet sets from closed jobs. Your reviewer, whoever knows that work best on your staff, makes the call on whether it passed.
- First job
- Report packages, or arc flash field data sheets
- From you
- 20 to 30 closed packages or sheet sets, copied after the NDA
- Never touched
- Test sets, study models, live reports, live sites
- Never decided
- A test result, a setting or an incident energy figure
- Reviewer
- Named by the owner before day one
- Left out
- Defense and aerospace work
- Price
- Range first, fixed price before signing
// Jobs we would test
Start where field paperwork turns into a signed document
Acceptance test report packages
A project's field test sheets assembled into one package: equipment and tag list, the named test specification, readings by device as recorded, instrument calibration references, deficiencies noted and the devices with no sheet, for your qualified engineer or technician to review and sign.
See the report packages pageArc flash field data sheets
Technicians' field collection for a power system study read into device tables: equipment names, conductors and lengths as written, protective device settings as recorded, and every blank or conflict with the one-line, for the engineer running the study.
See the field data pageTest scopes from a spec section
A project's Division 26 testing section read into a list of equipment, tests, witness points and report deadlines, for whoever prices the work.
Maintenance report history by device
Several years of maintenance test reports for one site lined up device by device, readings kept as recorded, so your engineer can read them together.
// Why these two first
Your files already show how each job ended
A closed job already has its answer. On a project you finished, the sheets your technicians filled in sit beside the report your engineer signed. A finished study holds the sheets on one side and, on the other, the input data the engineer ended up trusting. Those pairs are all a proof of concept needs, and nothing new has to be tested to get them.
Independence is why the paper stays yours. NETA describes its accredited companies as third-party firms that must be divested of competing service or manufacturing interests. The University of Maryland's facility standards want a testing agency whose principal revenue is testing, free of common ownership or control with manufacturers, contractors or consulting firms. On request, Portland State's 2013 specification wants a statement of no conflict of interest and examples of your test data forms. A buyer pays for an unbiased opinion, so this test assembles paper and offers no opinion of its own.
Testing is limited to qualified people. OSHA's electrical standard, at 29 CFR 1910.334(c), says only qualified persons may perform testing work on electric circuits or equipment. NETA's certified technicians hold Level 2, 3 or 4, and NETA treats the certification as valid only while the technician works for an accredited company. Nothing here moves that line. The AI reads copies of what those people already produced.
Few binders have one author. The University of Arizona's design manual has a third party test medium voltage cable, transformers and switchgear, leaves the rest to the electrical contractor, and tells the engineering firm to rewrite NETA's text for the project instead of simply citing it. So one acceptance binder can mix your sheets with the installer's, in formats nobody chose together, and a missing page may be someone else's.
The standards run on a calendar. NETA revises each ANSI/NETA standard on a four-year cycle: ATS in 2025, ETT in 2026, MTS in 2027 and ECS in 2028. Specifications stay frozen at whatever they cited when written. Portland State's, for one, names ATS-2013 for test voltages and ETT-2000 for technicians. A package has to say which edition it followed, and a sample of closed jobs shows how often your files answer that.
Hospitals add a retention clock. NFPA 99-2021, the Health Care Facilities Code, added site acceptance testing for electrical components serving Category 1 and 2 spaces, such as operating and trauma rooms and inpatient bedrooms. Consulting-Specifying Engineer's summary says the records are kept at least five years, go to the authority having jurisdiction on request, and that no third party is required. It points to NETA ATS and Chapter 31 of NFPA 70B as references.
A study can't begin without the walk. That's what makes the field sheets the other fair first job. IEEE 1584.1-2022 covers how a study's scope and deliverables get specified, and IEEE has a project open to revise 1584 itself. Choose this one first if your study backlog is worse than your report backlog.
Where this stops. Nothing in the proof of concept reaches test equipment, a study model, a live report or a live site. It doesn't judge a result, calculate incident energy, set a protective device or sign anything. A qualified person makes every technical call and signs every report. The documents above are summarized as background, and none of this is legal or engineering advice.
// How the test runs
Three steps, on jobs you have closed
- Step 01
Choose the job and the reviewer
The owner names the reviewer, often the engineer who signs your reports or runs your studies. Success criteria go in writing, you get a price range for the live job, and the NDA is signed before any sheet moves.
- Step 02
Run it on closed jobs
Send copies of 20 to 30 report packages with their field sheets, or 20 to 30 sheet sets with the input data the study used. Internally this step is the sandbox: a free run on paper you have already closed. Whatever can't leave your office gets look-alikes, built with your reviewer.
- Step 03
About 30 days live, after a yes
New projects go through the same job for about 30 days, and a qualified person approves each item before it goes anywhere and signs every report. Any next job comes one at a time, priced on its own, with monthly support after.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
Rob sets the range on the call from three counts: reports you issue in a month, owners with their own report format, and studies you collect data for.
// Questions
Questions testing firms raise early
Do you need access to our test-data software or a study model?
Will the AI say whether a reading passes?
Can it read handwritten field sheets?
We do acceptance and maintenance testing. Which should go first?
Can we send reports that belong to our customers?
Is Massmarket NETA accredited?

Rob Eason, founder
// Book a proof of concept call
Bring a report package you already signed.
Thirty minutes with Rob on your firm, your role, the job you'd test first and about how many reports you issue each month. Field sheets and reports stay with you until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
