30-min call with RobBook a proof-of-concept call
Job 02 · Safety office

// Commercial scaffolding companies · Inspection records

Scaffold inspection records, pulled into one file per site for your safety lead.

When a GC, an owner or a city inspector asks for a site's scaffold records, the answer sits in tags on the steel, shift sheets in a foreman's truck, designation letters and a folder of training cards. In a free AI proof of concept on copies of 20 to 30 site files, AI assembles each file and lists what is missing. Your reviewer, the safety lead who knows these records best, checks every draft against the file your office actually handed over.

Book a proof-of-concept call30 minutes with Rob
Site files
20 to 30
Scaffolds called safe by the AI
None
Inspections signed
None

// The one job

Tags on the steel, paper in the truck, one file at the end

Each scaffold on a site has a history. Someone was designated to supervise the build. Someone trained the crew. A competent person walked it before each shift and wrote that down somewhere, or didn't. It got altered for the glaziers and again for the roofers. When the customer asks, your safety lead gathers whatever exists, scaffold by scaffold and date by date.

In the test, AI reads copies of those records and assembles the site's file: each scaffold's identifier, inspection tags and shift inspection sheets by date, who was designated for what, training records for each erector, modification and repair entries, and a list of missing dates, unsigned sheets and lapsed cards. It says nothing about whether any scaffold was safe. Your reviewer holds each draft against the file your office really kept.

Records on handCopies, finished site
Inspection tags
Shift inspection sheets
Competent person letters
Erector training cards
RecordDateScaffold
Invented records, no site's data
Filed by
scaffold and date
Site record fileFor your safety lead
Inspection dates
Designations
Training on file
Missing or unsigned
ItemFound inStatus
Invented file, for illustration

// What makes it hard

The federal rule asks for the inspection and leaves the paper to everyone else

Subpart L requires the inspection, not the record. Under 29 CFR 1926.451(f)(3), a competent person checks for visible defects before each work shift and after anything that could affect structural integrity. OSHA's enforcement directive for the rule, CPL 02-01-023, says plainly that the standard doesn't require that person to write the findings down, and the section never mentions an inspection tag. The same directive says 1926.454 doesn't require certification or other documentation of training. So the file you hand over is built to whatever an owner, GC, contract or city asks for, and each draft opens by naming that source.

New York City writes the paper into its code. For a supported scaffold that needs design, section 3314.4.3.3 of the Building Code wants an installation inspection report, signed and dated by a qualified person designated by the designer, the installer or a third party both accept, before anyone uses it. Section 3314.4.3.5 then wants a signed and dated pre-shift report from the competent person supervising its use. Repairs, adjustments and maintenance each get a signed, dated description kept with those reports. Section 3301.7 holds required documents at the site for the duration of the job, with copies of inspection records at the permit holder and at whoever inspected. The draft sorts every report by scaffold and type and lists the shifts that have none.

Three parties can designate three people. In that code, the installing contractor designates who oversees installation and removal, what it calls the scaffold controlling entity designates who oversees use, and the equipment owner designates who oversees repairs. An installer that isn't the controlling entity has no supervisory role over use. OSHA's directive also lets competent person duties be shared, and notes that the person named for erecting might not be the person inspecting before each shift. California's Title 8 Section 1637 uses another phrase altogether, a qualified person, and counts a certification of competence from a trade association or approved program. The file lists each designation by party, date and scope, and marks any inspection signed by a name with no designation behind it.

Training cards run on a calendar. Under section 3314.4.5.1, people who install, adjust, repair, maintain or remove a supported scaffold 40 feet or higher, supervisors included, need an approved course of at least 32 hours and an 8-hour refresher every four years, and the same goes for crews on a shed that carries such a scaffold. Users need a 4-hour course, retaken every four years. Proof is a wallet card bearing a name and photograph. A lapsed refresher has a one-year window, and until it is taken that person can't do or supervise the work. The draft matches each name on a crew sheet to a card and its dates, and lists the gaps.

Sheds and tags keep their own habits. A New York City sidewalk shed gets an installation inspection and another six months after the last one from a qualified person, plus a daily visual check of five listed items, from working lights to wood blocking free of rot, all recorded in signed and dated reports at the site. The trade's own code of safe practices, from the Scaffolding, Shoring and Forming Institute and the Scaffold and Access Industry Association, tells users to check a scaffold for themselves before use, whatever the tag says. Your reviewer will watch for a tag and a shift sheet that disagree, and a scaffold altered after its last entry.

// What you send

Site files your office already closed

Copies only
Personal identifiers blacked out
01

20 to 30 site files

Whatever each file holds: inspection tags or photos of them, shift inspection sheets, installation reports and closeout letters. Include a site with a long rental and one altered midway.

02

Designation letters

Competent person and qualified person letters, whoever wrote them: your company, a GC or a design professional.

03

Erector and user training records

Cards, rosters and course certificates for those crews, with photographs, birth dates and ID numbers blacked out.

04

What each site was held to

The owner's, GC's or city's requirement for that site's records, plus your own tag format and inspection form.

05

NDA first, copies second

Signed ahead of the first record. Nobody from Massmarket logs in to your rental or yard system or goes near a live tag. Files that can't leave the building get look-alikes built with you, the same gaps left in.

// Before it starts

Settled before any site file is copied

Your owner and your reviewer write these down together.

Record file test termsOwner decides
Your reviewer
Named by the owner, usually the safety director or a safety lead
Success criteria
In writing: where each record belongs and which holes the draft has to catch
Sites
A mix your reviewer picks, building and plant
Who signs
A competent person, or the qualified person a local code names
Personal identifiers
Blacked out before any copy moves
Price
The live job's range, known before anything is copied

// How it's judged

The file your office handed over, beside the draft

Site by site
Record by record
Across the same 20 to 30 sitesWhat your file heldThe AI draft
Each scaffold identified and kept apart from the othersFilled in from your site filesFilled in from your site files
Inspection dates by shift, and shifts with no entryFilled in from your site filesFilled in from your site files
Tags matched to shift sheetsFilled in from your site filesFilled in from your site files
Designations listed by party and scopeFilled in from your site filesFilled in from your site files
Training records matched to crew names, with datesFilled in from your site filesFilled in from your site files
Modifications and repairs tied to the next inspectionFilled in from your site filesFilled in from your site files
Missing, unsigned or lapsed items listedFilled in from your site filesFilled in from your site files
Source of the records requirement named on each fileFilled in from your site filesFilled in from your site files
Nothing scored yet. Cells wait for files from your own sites.Marks and the decision belong to your reviewer.

// After a yes

About 30 days on sites still standing

On your reviewer's yes, new tags, shift sheets and training records go through the same assembly for about 30 days.

Your safety lead reviews every file and decides what goes out, and a person approves each item before it leaves. A competent person still walks the scaffold before each shift and signs for it, and any next job has its own price.

// Possible next jobs

After the record file

Possibilities, in order
Each priced on its own
  1. 01

    Scaffold bid scope sheets

    Bid documents condensed to one page of heights, time on rent and overhead protection for your estimator.

    Next
  2. 02

    Card and designation expiry lists

    A monthly list of training cards and letters coming due, for your safety lead to act on.

    Then
  3. 03

    Turnaround scaffold request logs

    Requests from a plant outage kept by unit and date, so your superintendent can see what is still owed.

    After that

// One hard limit

It never signs an inspection or calls a scaffold safe.

The file shows what the records say and where they stop. A competent person signs every inspection, or the qualified person a local code names for it, and your safety lead decides what a gap means and what gets handed over. The proof of concept never touches your estimating, yard or rental system, a live bid or a live tag, never designs a scaffold and never judges whether one is safe. Federal, state and city rules appear here so your team can recognize what a file is built around. Nothing on this page is legal or engineering advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call, once he knows how many active sites you keep files on and who asks for them.

// Questions

Scaffold inspection record questions

Does OSHA require written scaffold inspection records or tags?
Not in the federal scaffold rule itself. OSHA's directive CPL 02-01-023 says the standard doesn't require the competent person to document inspection findings, and 29 CFR 1926.451 doesn't mention inspection tags. Cities, owners and contracts can require them, so each draft names the requirement its file was built to, and this isn't legal advice.
How long must scaffold inspection records be kept?
That depends on who requires them. New York City's Building Code, for one, keeps required inspection reports at the site for the duration of the job, with copies at the permit holder and whoever inspected. The draft shows the dates on each record, and your safety lead sets how long your company keeps them.
Does the AI say whether a scaffold passes?
No. It assembles the records and lists what is missing. A competent person inspects and signs, and your safety lead decides what any gap means.
Our tags are photos on a phone. Can those go in?
Yes, as copies, if the date and signature can be read. If they can't, the tag goes on the list with the reason. Nothing is ever written on or changed on a live tag.
Do you need workers' personal information?
No. Black out photographs, birth dates and ID numbers on cards and rosters before copies move. The draft needs only the name, the course and its dates.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with one site that already came down.

Thirty minutes with Rob on your company, your role, how many active sites you keep files on and who asks for them. Tags, shift sheets and training cards stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.