30-min call with RobBook a proof-of-concept call
Job 01 · Bid desk

// Commercial scaffolding companies · Bid scope sheets

Scaffold bid scope sheets, drafted from the bid documents for your estimator to check.

Somewhere in the drawing notes, the general conditions and a logistics page sit the heights, the time on rent, the overhead protection and the code line that decides whether an engineer gets involved. In a free AI proof of concept on copies of 20 to 30 bids you already closed, AI pulls those into one draft scope sheet and lists every conflict or blank. Your reviewer, the estimator who knows these bids best, checks each sheet against the scope that actually went out.

Book a proof-of-concept call30 minutes with Rob
Closed bids
20 to 30
Scaffolds designed by the AI
None
Live bids touched
None

// The one job

A stack of bid documents in, one scope page out

A bid arrives as a set of drawings, a general conditions section, an access or logistics narrative and usually an addendum or two. Your estimator reads all of it for what a takeoff can't count: which elevations, how high, for how long, who else climbs it, and what has to stand over the sidewalk meanwhile. The numbers come later, and they are only as good as that first reading.

In the test, AI reads copies of those documents from closed bids and drafts a scope sheet: elevations and heights exactly as stated, duration and rental period, sidewalk shed or overhead protection requirements, and any engineered scaffold trigger the local code names, each with the page it came from. Conflicts between documents and anything left blank go on a list for a person to resolve. Nothing gets counted or priced, and your reviewer marks each sheet against the scope your estimator sent.

Bid documentsCopies, closed bid
Drawing notes
General conditions
Access requirements
Addenda
DocumentPageNote
Invented set, no project's data
Read into
one scope page
Scope sheetDraft for your estimator
Elevations and heights
Duration and rental
Overhead protection
Engineered triggers
ItemAs statedStatus
Invented sheet, for illustration

// What makes it hard

Where a scaffold scope quietly changes

Height has a definition, and it isn't always the building's. New York City's Building Code measures a scaffold from its base to the top of its uppermost vertical member, counting any temporary structure it rests on but no permanent one (section 3314.1.1). A scaffold standing on a sidewalk shed adds the shed's height, and one on a setback roof starts at that roof. So the sheet gives each elevation's height as the documents state it, says what it is measured from, and lists any page that mixes the two.

Engineering triggers sit in more than one book. Federally, 29 CFR 1926.452 sends pole scaffolds over 60 feet, tube and coupler and fabricated frame scaffolds over 125 feet, and outrigger scaffolds at any height to a registered professional engineer. New York City's section 3314.3.1 starts from the other end: a registered design professional designs every supported scaffold unless six things all hold, among them no outrigger, no hoist rated above 2,000 pounds, no more than 75 pounds per square foot and a height under 40 feet. The code treats the permit and the design as separate tests, so one can apply without the other. In California, Title 8 Section 1637 has a civil engineer registered in the state set an engineered scaffold's working load and wants those drawings available at the job site during erection. The draft quotes whichever trigger the documents or your own code notes name, and never rules on whether it applies.

Overhead protection has its own drawing and its own clock. Section 3307.6.2 calls for a sidewalk shed under any scaffold above a walkway, and for work on a facade more than 40 feet above the curb when the sidewalk lies within half the height of that work. A registered design professional designs every shed, at 300 pounds per square foot, or 150 where work stays under 100 feet and nothing is stored on it, and the deck runs past the protected zone, farther above 100 feet. Local Law 48 of 2025 limited shed permits to 90 days, and a city rule effective August 13, 2026 has each renewal accompanied by a report, except for sheds serving new building, enlargement or demolition work under permit. A proposal reading "shed for duration" still has to say how those renewals are handled.

The drawing list shows what the bid left out. Where design is required, section 3314.3.3 wants site-specific plan and elevation views of the base structure, tie-ins and anchors, netting with its type and maker and the effect of wind on it, any hoist on the scaffold, the levels loaded at once, nearby cranes and other temporary work, and the job numbers of the shed and the permit it relates to. Section 3314.3.4 adds a review of the load a scaffold puts on a roof, setback, vault or shed. A bid set may settle some of that and leave the rest open, so the sheet says plainly which items were stated and which weren't.

Ground, equipment and the fine print. OSHA's letter of August 1, 2000 treats a concrete slab as firm enough to skip mud sills, warns that compacted soils swell and heave and that asphalt has little compressive strength even when cold, and puts the foundation in pre-job planning. Plant work scopes by equipment: Roseville Electric's 2026 request covers gas turbines, heat recovery steam generators, cooling towers, crystallizers, sumps and tanks. And unit prices hide work. East Bay MUD's bid form folds lighting, confined space air monitoring and a safety plan into each cost. Your reviewer will look for the surface under each leg, who else uses the scaffold, and anything buried in a price that the sheet failed to raise.

// What you send

Bids your estimators already closed

Copies only
Commercial and industrial work
01

20 to 30 closed bids

Each bid set as your estimator received it: drawing notes and elevations, general conditions, logistics or access pages and addenda. Include one you won, one you lost and one that changed after award.

02

The scope that went out

The scope sheet, takeoff summary or proposal your team built from each set, exclusions included, so every draft has something to be held against.

03

Your local code notes

The permit and design triggers your estimators keep for each city and state where you bid. A page of notes will do, and the draft can only flag what the documents or those notes name.

04

Your rental terms

Your standard rental period, how you bill past it, and how modifications are written up, as they appear on your proposals.

05

NDA, then the first sheet

Signed before anything is copied. We never log in to your estimating, yard or rental system. A bid that can't leave the building gets look-alike documents built with you, conflicts and blanks kept.

// Before it starts

Agreed before a bid set is copied

Your owner and your reviewer put these in writing.

Scope sheet test termsOwner decides
Your reviewer
Named by the owner, usually a chief estimator
Success criteria
In writing: which scope items must appear, and what counts as a miss
Bids
A mix your reviewer picks: building, plant, rental only
Who approves
Your estimator, on every scope
Who designs
Your engineer or qualified person, never the AI
Price
A range for running it live, given up front

// How it's judged

The scope that went out, beside the draft

Bid by bid
Line by line
Across the same 20 to 30 bidsWhat your estimator wroteThe AI draft
Elevations and heights, and what each is measured fromFilled in from your closed bidsFilled in from your closed bids
Duration, rental period and extension termsFilled in from your closed bidsFilled in from your closed bids
Sidewalk shed or overhead protection called forFilled in from your closed bidsFilled in from your closed bids
Engineered scaffold triggers named, with their sourceFilled in from your closed bidsFilled in from your closed bids
Who erects, who modifies and who else uses itFilled in from your closed bidsFilled in from your closed bids
Base conditions stated for each areaFilled in from your closed bidsFilled in from your closed bids
Conflicts between documents, listedFilled in from your closed bidsFilled in from your closed bids
Blanks left for a person to fillFilled in from your closed bidsFilled in from your closed bids
Blank for now. No cell holds anything until bids from your own files have run.Each row gets your reviewer's mark, and the call is theirs.

// After a yes

About a month of new bid sets

With your reviewer's yes, new bid sets get the same draft for about 30 days, before the takeoff starts.

Your estimator approves every scope, and a person signs off each item before it goes anywhere. Proposals still leave your office the way they do today, and anything after that is a new decision at its own price.

// Possible next jobs

If the scope sheet holds up

Ranked, not promised
One at a time
  1. 01

    Scaffold inspection records

    Tags, shift sheets and designation letters from a site gathered into one file for your safety lead.

    Next
  2. 02

    Rental extensions and modification billing

    Field tickets and on-rent dates compared with the proposal and written up as invoice lines for approval.

    Then
  3. 03

    Turnaround scaffold request logs

    An outage's requests sorted by unit and need-by date, with each one traced to what got built.

    After that

// One hard limit

It never designs a scaffold or approves a scope.

The sheet reports what the documents say and where they disagree. Your estimator approves every scope, and your engineer or qualified person designs every scaffold that needs it. The proof of concept never touches your estimating system, your yard or rental system or a live bid, never decides whether a code trigger applies, never judges whether a scaffold is safe and never signs an inspection. Codes change, and the rules named here are for recognition only. Nothing on this page is legal or engineering advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob sets the range on the call, after hearing how many bids you scope in a month and how many cities' codes they fall under.

// Questions

Scope sheet questions

Does the AI do the takeoff?
No. It reads the documents for scope items, not piece counts. Bays, lifts, planks and ties stay with your estimator, and the sheet tells them what the documents asked for.
Will it tell us a job needs an engineered scaffold?
It quotes any trigger the documents name or your code notes list, and says which line it came from. Whether a scaffold needs design is for your estimator and engineer to decide, and this isn't engineering advice.
What if the duration doesn't match the schedule?
Both go on the sheet with their pages, and the rental period stays blank for your estimator. A general conditions section that says one thing and a logistics page that says another is what the conflict list exists for.
We mostly bid plant work. Does a scope sheet still fit?
Yes, if your closed files have one. A plant request may list equipment and rates in place of elevations, so your reviewer decides which rows apply and writes that into the success criteria.
Which scaffold estimating software do we need?
None for the test. It runs on copies of bid documents and of the scope your team sent, however those were produced. Nothing connects to your estimating system during the proof of concept.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Bring the last few bids your estimators finished.

Rob's call runs 30 minutes: your yards, your role, the cities you bid in and how many bids you scope in a month. Bid sets and proposals stay in your office until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.