30-min call with RobBook a proof-of-concept call

// Commercial roofing contractors · Bids

Reroof bid packages read into one worksheet, with the price left to your estimator.

Commercial roofing bids, tested as a free AI proof of concept on 20 to 30 reroof and recover packages your estimators already priced. AI reads the plans, the Division 07 sections, the bid form and every addendum, then drafts one requirements sheet to build the bid from. Your estimator compares each sheet with what your team carried.

Book a proof-of-concept call30 minutes with Rob
Past bid packages
20 to 30
Prices set by AI
None
Bids submitted by AI
None

// The one job

Every requirement in the package on one sheet, before anyone counts squares.

A reroof package from a school district, a university or a state agency arrives as a stack: roof plans with areas and existing conditions, details, a project manual with the bid form and Division 01 rules, the Division 07 sections, and addenda right up to bid day. Before anyone prices a square, somebody reads all of it and lists what the job demands, because a line nobody noticed becomes a cost nobody carried.

In the proof of concept, AI reads copies of those packages and drafts the requirements sheet: each roof area with its square footage and existing assembly, tear-off or recover, the new system, insulation and R-value, the uplift and fire ratings, the warranty term and type, approved manufacturers and submittals, alternates and unit prices, and the schedule and site rules. Every line names its source page. The sheet carries no price, and nothing is submitted.

Bid packagePlans, specs, addenda
Roof plan
Division 07
Bid form
Addenda
Roof areaSquare feetExisting
Illustration, not your package
Read
and sourced
Requirements sheetDraft
System
R-value
Uplift and fire
Warranty
RequirementSourceNote
Illustration, not a real bid

// Where it gets hard

Where a reroof package hides the cost

Ratings are pressures and listings, not adjectives. In an FM uplift rating such as 1-90, the 90 is pounds per square foot, not miles per hour. The test raises pressure in 15 psf steps until a component fails, the rating is the step before, and FM wants twice the calculated uplift, so a 1-60 assembly covers a field pressure of no more than 30 psf. SPRI notes that FM's wind data sheet is neither part of the building code nor a consensus standard, and it sets a separate rating for each roof zone, from the field to the corners. UL rates roof coverings Class A, B or C for severe, moderate or light fire test exposure from outside the building, and its listing for a roofing system gives the class, the deck type it holds for, any slope limit and the barrier boards or ply sheets it needs. The sheet copies each rating with its zone or deck.

Recover and replacement price differently, and jurisdictions differ. The IBC's reroofing section, 1511 in the 2018 edition and 1512 in the 2021, excuses a recover or a replacement from the quarter-inch-per-foot minimum slope where the roof keeps positive drainage, the 2018 text does the same for adding secondary drains, and a replacement removes every layer down to the deck. Minnesota's adopted version adds secondary drainage for existing roofs whose edges can trap water. Seattle's replacement affidavit applies its energy rule even to roofs that had no insulation, forbids any drop in R-value, lists R-38 continuous above the deck and has the contractor certify what went in; a recover there needs no permit. The sheet records the path, the R-value and the jurisdiction, and offers no code opinion.

Addenda rewrite the scope after the cores come out. Troy University's third addendum to a 2025 reroof, issued after core extraction, took every roof to the deck except one metal area, sorted the steel deck into three treatments by how badly it had deteriorated, set a tapered insulation start thickness at the drains for each roof area, added a unit price for spray foam under the deck with a quantity already in the base bid, and added two acceptable manufacturers. Provo's school district, in a 2021 addendum, made its pre-bid meeting optional and turned new parapet caps into a deduct alternate to reinstall the old ones. The sheet applies the latest addendum to each line and names it.

Site rules are cost as well. New York's state master spec section 07 01 50.19, Preparation for Reroofing, allows no more tear-off in a day than can be made watertight the same day, suggests 72 hours' written notice to the owner, asks for a fastener pull-out test report when the new roof is mechanically fastened, and reminds the designer that asbestos felt was common in old base flashing. A California school district's edited copy set 48 hours' notice, wanted the installer licensed for asbestos abatement, and required the membrane maker's letter if a temporary roof would stay under the new one. Each rule lands on the sheet with its section, so your estimator can price crew days, protection and testing.

What your estimator will check first: areas that don't match the roof plan, a recover where the package calls for tear-off, a rating without its zone or deck, a warranty term that differs between spec and bid form, missing alternates or unit prices, and anything left in an addendum the sheet missed.

// What you send

What the test needs from your estimating desk

20 to 30 packages
Copies only
01

Packages you already bid

Twenty to 30 reroof and recover packages as they arrived: plans, project manual, Division 07 sections, details and every addendum. Mix public and private owners, wins and losses, and one that changed late.

02

The bid that went out

For each package, the estimate or takeoff worksheet, the bid form as submitted with alternates and unit prices filled in, and any clarification or exclusion letter you sent with it.

03

Your own reading checklist

Whatever your estimators read a package with today, such as a scope sheet or an exclusions list, so the draft follows your layout.

04

NDA first, look-alikes if needed

Your bid numbers and a private owner's drawings stay confidential, so the NDA is signed before anything is sent. If a package can't leave your office, we build a look-alike from it together with your estimator.

// Before it starts

Decided before a single package is sent

The owner settles two things in writing: who reviews the sheets, and what a passing sheet has to catch.

Bid sheet test termsOwner signs off
Reviewer
Named by the owner. Usually the chief estimator or whoever bids reroofs today.
Success criteria
Written first, naming the misses that would cost the most
Bid prices
Set by your estimator, never by AI
Code questions
Left with your estimator, the designer and the code official
Price
A range for the live job, before day one
NDA
Signed before any package or bid is sent

// How it's judged

Each sheet beside the bid your team built

Package by package
On bids already priced
On the same packagesWhat your estimator carriedThe proof of concept
Roof areas and existing assembly, by sectionMeasured on your packagesMeasured on your packages
Tear-off or recover, and the deck work with itMeasured on your packagesMeasured on your packages
Insulation and R-value as the package specifiesMeasured on your packagesMeasured on your packages
Uplift and fire ratings with their zone or deckMeasured on your packagesMeasured on your packages
Warranty term, manufacturers and submittalsMeasured on your packagesMeasured on your packages
Alternates, unit prices and the latest addendumMeasured on your packagesMeasured on your packages
Notice, hours, protection and testing rulesMeasured on your packagesMeasured on your packages
Blank for now. No cell is filled until your own packages have been read.Your estimator judges, on criteria written down first.

// After a yes

About 30 days on packages out for bid

Once your estimator says yes, the job runs for about 30 days on new packages as they come in, each sheet ready before the takeoff begins.

Your estimator prices every bid, and your team submits it. Each sheet shows its sources, marks what it couldn't settle and lists conflicts your estimator may raise with the designer before the question deadline.

The live job is signed at a fixed price. Any job after it carries its own price, and monthly support starts when one goes live.

// After bid sheets

What could come next

Ranked by fit
Each priced alone
  1. 01

    Addendum change lists

    Each new addendum checked against the sheet already drafted, listing what it added, removed or changed.

    Next
  2. 02

    Pre-bid question lists

    Conflicts between the plans, the specs and the bid form gathered into questions your estimator can send or set aside.

    Then
  3. 03

    Submittal sets for awarded reroofs

    The product data, rating listings and letters a won job's spec asks for, gathered for your project manager.

    After that

// One hard limit

It never prices or submits a bid.

Every number on a bid is your estimator's, and your team decides whether to bid and sends what goes out. The draft works on copies and lists what the package requires, with sources. It never prices a line, signs a bid form, contacts an owner, an architect or a manufacturer, or says whether an assembly meets the code or a rating; those questions stay with your estimator, the designer and the code official.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

The range comes on the call, once we know how many reroof packages your estimators read in a month and how many owners' formats they see.

// Questions

Bid questions from roofing estimators

Will the AI price the job or do the takeoff?
No. Measuring and pricing stay with your estimator. The sheet carries each roof area as the plans state it, with its requirements, and marks where the plans, the specs and the bid form disagree.
Can it tell us whether an assembly meets a 1-90 or Class A requirement?
No. Whether an assembly qualifies depends on its listing and the designer's judgment, and we give no code or engineering advice. The sheet copies the rating the package asks for with the roof zone or deck it applies to, so your estimator knows what to check before choosing a system.
What happens when an addendum lands two days before the bid?
Send it and the sheet is redrafted, with every changed line marked and the addendum named. Where the bid form asks bidders to acknowledge each addendum, the sheet lists them by number so none is missed.
Does it handle recover jobs as well as tear-offs?
Yes. The sheet records which one the package specifies for each roof area, the deck work tied to it and the insulation it calls for. Whether a recover is allowed on a particular roof is a question for your estimator, the designer and the code official.
Rob Eason

Rob Eason, founder

// Book a proof-of-concept call

Bring five reroof packages you already bid.

A 30-minute call with Rob. He'll ask what your company bids, your role, which job you'd test first and how many reroof packages cross your desk in a month. Plans and bid files stay with you until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.