30-min call with RobBook a proof-of-concept call
Job 01 · Before mobilization

// Commercial demolition contractors · Notification packages

Demolition notification packages, drafted from the asbestos survey and the job file.

Before the first machine moves, someone in your office copies the inspector's findings and the owner's details onto a state or local form and counts the days to the start date. A free AI proof of concept tries that on copies of 20 to 30 notices you've already filed. Your reviewer, the project manager who knows these filings best, sets every draft beside the notice that went in.

Book a proof-of-concept call30 minutes with Rob
Filed notices
20 to 30
Notices submitted by us
None
Asbestos calls made
None

// The one job

From survey and job file to a notice a person can sign

The inputs are already in the job file: the inspector's report, the owner's details, the contract or letter of intent, the schedule, and the name of whoever hauls the waste and where it goes. Someone in your office turns those into the form each jurisdiction wants, and then someone with authority signs it.

In the test, AI reads copies of those same papers and drafts the notification field by field, with the page each value came from. Any required field with nothing behind it goes on a list instead of being filled in. Nothing is submitted. Your reviewer compares each draft with the notice your office actually filed, and with any revision that followed.

Survey and job fileCopies
Facility
Owner
Inspector
Survey date
MaterialQuantityResult
Illustration, not a real survey
Drafted
field by field
Notification packageDraft
Notice type
Present and prior use
Start and end
Disposal site
FieldSource pageStatus
Made-up fields, for illustration

// What makes it hard

What a demolition notice asks for, and where it trips

The federal list is long before a state adds to it. Under 40 CFR 61.145(b)(4), the notice names the owner or operator and the asbestos removal contractor, the facility's size, floors, age and both its present and prior use, the procedures used to detect asbestos, the amount to be removed and the Category I and II nonfriable material left in place, separate dates for asbestos removal and for the demolition, the planned methods and work practices, the transporter and disposal site, and what happens if unexpected asbestos turns up. Units matter too: Wyoming's instructions keep linear feet for insulation around pipes and elbows, square feet for most materials including caulking and glazing, and cubic feet for debris being cleaned up. The draft fills only what the file supports.

Working days are not the days you'd guess. The federal rule asks for 10 working days, and its definition of a working day is Monday through Friday with any holiday falling on those days included, so a holiday doesn't stretch the count. Texas writes it as Mon. to Fri. and warns against reading it as calendar days. Connecticut's form says at least ten days with no such qualifier. A Michigan joint form posted by the City of Ann Arbor puts two clocks on one page: 10 working days under the federal rule and 10 calendar days under the state asbestos program, for the jobs each one covers. The draft names the notice period it used, shows the count from the mailing or delivery date to the start date, and leaves the call to your project manager.

A blank and an N.A. are different answers. Texas's instruction guide treats a notice as improper if it misses the 10 days or arrives incomplete, and it wants N.A. written in any space that doesn't apply, to show the item was considered. It wants a physical address rather than a post office box, a contact person at the facility even if the building is vacant, and the disposal site's permit number. The signature must be an original, and the guide suggests blue or red ink. Wyoming's Air Quality Division says an unsigned notification won't be processed. The draft marks each field filled, N.A. or blank, so your reviewer sees which is which, and it leaves every signature line empty.

The inspection block differs by form. New Hampshire's Asbestos Demolition Notification, NHDES-A-01-023, effective January 1, 2026, asks who did the inspection, that person's certification number, the date, and whether it was visual, analytical testing or both. Texas has a box for each analytical method, assumed included, and wants a state inspector license and laboratory number only when the building is public. Wyoming asks you to describe the methods if you know them, naming bulk analysis, polarized light microscopy and transmission electron microscopy. Michigan's form says the presence or absence of asbestos must be determined before the notification goes in, and Texas says transite can't stay Category II through a demolition and has to come out first. The draft carries the inspector's method, date and result exactly as the report states them and never interprets a lab result.

Filing is only the start of the file. The federal rule has you update a notice when the amount of asbestos changes by a fifth or more, and bars starting on any date other than the one in the written notice of a new start date. Wyoming also wants a revision when work dates, the abatement contractor or a disposal location changes, and if waste goes to more than one site, a statement of which waste goes where. Texas wants an amendment when a stop date moves by more than one working day for each week scheduled, no less than 24 hours before the change, with the prior version attached, and it defines the abatement stop date as the day air monitoring clearance is achieved. Connecticut accepts one form per demolition and lets an earlier abatement notification marked demolition stand in. Your reviewer will check each revision against the draft's list of what changed.

// What you send

Filed notices and what stood behind them

Copies only
After the NDA
01

20 to 30 filed notices

Notices your office has already sent in, with any revisions and cancellations. Mix strip-outs with full takedowns, and include at least one job that changed dates after filing and one where no asbestos was found.

02

The survey and job file behind each

The inspector's report and lab sheets, the owner and facility details your team used, the schedule, and the transporter and disposal site names.

03

The forms and your own checklist

A blank of each state or local form you file on, and whatever checklist your team follows. Notes on a single page are plenty.

04

NDA first, look-alikes if needed

Nothing moves until the NDA is signed. If the papers can't leave your office, we build look-alike jobs with your reviewer. We never sign in to a state portal, your job cost system or your estimating system.

// Before it starts

Agreed while the notices are still in your files

The owner signs off on each of these first.

Terms for the notice testOwner's decision
Your reviewer
Named by the owner: usually the project manager who files notices
Success criteria
In writing: which fields must match, and how blanks and holds are scored
The sample
Your reviewer's pick, covering each state and city you file in
Who decides
Your project manager, on every asbestos, notice and date question
Price
A range for running live notices, quoted before anything is copied
NDA
Signed before the first survey is scanned

// How the test is judged

Each draft beside the notice you actually filed

Field by field
Your reviewer's call
On the same 20 to 30 noticesThe notice you filedDraft from the test
Owner, operator and contractor detailsFilled in on your noticesFilled in on your notices
Facility size, floors, age, present and prior useFilled in on your noticesFilled in on your notices
Inspector, inspection date, method and resultFilled in on your noticesFilled in on your notices
Asbestos amounts, in the form's unitsFilled in on your noticesFilled in on your notices
Asbestos removal and demolition dates, against the notice periodFilled in on your noticesFilled in on your notices
Transporter and disposal siteFilled in on your noticesFilled in on your notices
Required fields listed as blank, with the reasonFilled in on your noticesFilled in on your notices
Nothing scored yet. These columns wait for notices from your own files before anything goes in them.Your reviewer marks them and makes the call.

// After a yes

About 30 days on new notices

With a yes from your reviewer, the same drafting runs on new notices for about 30 days.

A person checks and signs every notice before anyone submits it, and your office files it the way it does today.

The side-by-side keeps running on live jobs. Anything added after that is decided and priced by itself, and monthly support follows once it runs.

// Possible next jobs

What could follow the notices

Possibilities, in order
Priced separately
  1. 01

    Disposal and recycling reports

    The waste diversion report for the same job, rolled up from its haul and scale tickets.

    Next
  2. 02

    Waste shipment record tracking

    Signed copies of each asbestos shipment record logged against the notice, with the outstanding ones listed for your project manager.

    Then
  3. 03

    Demolition bid scope sheets

    Specification sections and hazardous materials surveys condensed into one sheet for whoever prices the job.

    After that

// One hard limit

The AI drafts. It never decides or files.

The proof of concept works on copies. It never touches your job cost or estimating system or a state portal, and it files nothing. It never decides whether asbestos is present or whether a notice is required. A licensed inspector does the survey, and a person checks and signs every notice. Certified payroll is excluded, so take payroll pages out of any file before it is copied. The rules named here differ by state and city, and nothing on this page is legal advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Rob gives the range on the call, once he knows how many notices you file in a month and how many state and local forms your office works with.

// Questions

Demolition notification questions

Will this work with our state's demolition notification form?
Yes, as long as a blank of the form and your checklist come with the sample. Every draft follows the layout your state or city uses and says which version it read. Keeping that form current stays with your office.
What if the survey found no asbestos?
The job still belongs in the test. Texas, for one, wants a notification before a demolition even when no asbestos is present, and Wyoming asks for one on every demolition project. Whether one is required on your job is your project manager's decision, and the draft never makes it.
Does it file the notice or log in to the state portal?
No. The draft stops at your desk, and the test involves no agency login of any kind. Someone on your staff checks it, signs it and sends it in the way your office already does.
What happens when the start date moves?
Send the revised notices with your sample. The draft lists what changed from the notice before it and recounts each date against the notice period. Whether and when to send a revision stays with your project manager.
Can it handle a phased job?
Yes, if the schedule shows the phases. Wyoming wants a separate sheet with the dates and a description of each phase, and Michigan's form has a schedule attached showing each phase's start and end. The draft sets up that attachment for a person to confirm.
Will it read our inspector's lab report?
It reads copies of it for the values the form asks for: method, date, material and result as the inspector wrote them. It doesn't interpret a result or decide whether something contains asbestos. That judgment belongs to the inspector.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start with the notices already in your files.

Thirty minutes with Rob about your crews, the states and cities you file in, and roughly how many notices go out each month. Hold surveys and job files until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.