// AI for asphalt paving contractors
AI for asphalt paving contractors, tested on bid schedules your estimators already worked.
For commercial and public-works paving companies working parking lots, municipal streets and highway subcontracts. Two jobs make a fair first test: reading a public agency's bid schedule and special provisions into a draft bid sheet, or assembling a project's density and mix test records. Whichever you pick runs as a free AI proof of concept on copies of 20 to 30 lettings or lots your team has finished. Your reviewer, the colleague who knows that paperwork best, makes the call.
- First job
- Bid schedules into a draft bid sheet, or density and mix records
- From you
- 20 to 30 past lettings or closed lots, copied after the NDA
- We touch
- Copies only: no estimating system, plant system or agency portal
- Never
- A bid priced, a test result accepted or a record submitted
- Reviewer
- Named by the owner: your estimator or quality control manager
- Price
- A range up front, fixed before you sign
// Jobs we would test
Two desks where a paving company's paper piles up
Paving bid schedules
A public agency's bid schedule, plans and special provisions read into a draft bid sheet: pay items, units and quantities as stated, mix designations, milling depths, traffic control, working-day limits, and every conflict a person has to settle.
See the bid schedule pageDensity and mix test records
Load tickets, density readings, mix test reports and daily reports assembled by lot or sublot where the specification uses them, with the missing records listed for your quality control manager to review and submit.
See the test records pageCommercial parking lot proposals
A property manager's request and your site-walk notes turned into a scope sheet of patching, mill and overlay, sealcoat and striping for whoever writes the proposal.
Binder price adjustment sheets
Each month's index, the tons placed and the binder content from the job mix formula gathered on one sheet for whoever checks the adjustment on a public job.
// Why these two first
A paving job is won on one stack of paper and paid on another
The season sets dates the paperwork has to meet. North Carolina's guidelines for setting contract time allow no final surface layer thicker than an inch between December 15 and March 16, and none thinner than an inch between November 15 and April 1. They count 16 work days in a calendar month on work that wet weather can delay. A letting priced without those windows in view can promise a date the season won't give, which is why a bid sheet has to carry the contract's time limits beside its quantities.
Bid windows are short, and the package keeps moving. The Town of Normal, Illinois posted its 2026 street resurfacing program on July 2, held an optional pre-bid meeting on July 7, listed an addendum among the documents and opened bids on July 15. Every letting starts with the same reading: what is being bought, in which units, under which provisions. Your last season's lettings already show how your team answered, so each one is a complete test.
Binder pricing can be settled on the bid form. Illinois adds its bituminous cost adjustment to projects with at least 1,200 tons of applicable work, has the bidder say with its bid whether the adjustment applies, and leaves out tack coats and crack filling. Colorado's depends on a choice marked on Form 85, and a bidder who marks nothing doesn't get it. Washington publishes a binder reference cost twice a month, one for each side of the state, and takes the base from the last figure before bid opening. An election like that is easy to miss on a deadline, so the draft sheet puts it in front of your estimator.
A mill and overlay can bring more than asphalt. The 2013 joint technical assistance from the Justice and Transportation departments treats an overlay, with or without milling, as an alteration that brings curb ramps with it, while chip seals, slurry seals, fog seals, crack filling and patching normally count as maintenance. That guidance is addressed to public agencies, and whether ramp work falls in your contract is for your estimator to read. The draft only shows whether the package prices it, mentions it or says nothing at all.
Test records come next because someone else will read them. On federal-aid highway work, 23 CFR 637.207 lets a state count a contractor's quality control tests toward acceptance only when qualified labs and people ran them, samples taken independently of those tests verify the quality, and an independent assurance program evaluates the testing. Disagreements between the two sets of numbers need a way to be resolved. A closed lot already shows what your team filed and what the agency did with it, so it can be compared entry by entry.
One limit runs through both jobs. The proof of concept never touches your estimating system, a plant system, a live bid or an agency portal. It never prices a bid, accepts a test result or submits a record. Your estimator approves every bid and your quality control manager signs every submission. The rules named here are examples that vary by agency, and nothing on this page is legal or engineering advice.
// How the test runs
Three steps on work you've already finished
- Step 01
Pick the desk, name the reviewer
The owner picks one job and names the reviewer, usually the chief estimator for bid schedules or the quality control manager for test records. Written success criteria, a price range for the live job and a signed NDA all come before a page moves.
- Step 02
Run it on finished work
Send copies of 20 to 30 lettings with their addenda, or 20 to 30 closed lots with their tickets, readings and reports. We call this stage the sandbox: a free AI proof of concept on your own past paperwork. Anything that can't leave the office gets look-alike documents built with your reviewer.
- Step 03
Then about 30 days on live work
New lettings or new lots go through the same job for about 30 days, and a person approves each item before it goes anywhere. The next job, if you want one, is a separate decision with its own price and monthly support once it runs.
Priced per job. You get a range before the proof of concept and a fixed price before you sign.
Rob sets the range on the call from three counts: lettings your estimators work in a season, paving crews running at once, and the agencies whose specifications you pave under.
// Questions
Questions a paving office asks first
We already have paving estimating software. Does this replace it?
Will the AI price a bid or decide whether a test passed?
We do mostly parking lots for property owners. Does this fit?
We pave as a subcontractor on highway jobs. Whose records would we send?
Do our gauges or plant equipment have to connect to anything?
Which job should go first?

Rob Eason, founder
// Book a proof of concept call
Start with last season's lettings.
A 30-minute call with Rob about your crews, your role, which job you would test first and how many lettings or lots a season it covers. Nothing needs to leave your office until the NDA is signed.
- Co-owned a 60-employee financial services firm and sold his share to his partner.
- Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
- 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
- 4.3/5 from 6 Google reviews of Massmarket AI.
- Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
- Takes every proof-of-concept call himself.
