Project closeout packages, assembled from your field records for the project manager who sends them.

Once the area is released, someone gathers the shipment records, logs, credentials and outside air reports into the package the owner's specification asks for, then chases whatever is missing. A free AI proof of concept repeats that on copies of 20 to 30 projects your office closed earlier. Your reviewer, whichever project manager knows those packages best, checks each draft line by line against the package the owner received.

Book a proof-of-concept call30 minutes with Rob
Closed projects
20 to 30
Air results judged
None
Records signed by us
None

// The one job

From a field folder to a package the owner will accept

A closed project leaves records in several hands: waste shipment records signed by the transporter and the landfill, the supervisor's daily log and the entry and exit log, the crew roster with each person's license and dates, the outside lab's or consultant's air sample reports, and the notices and amendments filed before and during the work. Your project manager pulls those into the order the specification lists, checks them against each other and sends the package.

During the test, AI gets copies of those records and builds the package in draft: each required item in the owner's order, the page it came from, and a list of anything missing or not matching, such as a shipment record with no landfill signature or a worker whose card expired during the project dates as recorded. Nothing is sent. Your reviewer then holds each draft against the package that went out and any comments the owner sent back.

Field recordsCopies
Shipment records
Daily log
Roster
Air reports
RecordDateSigned by
Example layout only
Assembled
in the owner's order
Closeout packageDraft
Project
Phase
Spec section
Missing items
ItemSourceStatus
Invented package, shown for layout

// What makes it hard

Where an abatement closeout package comes apart

The owner's list is long and in a set order. The Dormitory Authority of the State of New York's master asbestos removal section, revised December 2019, wants the contractor's closeout within 30 days of each abatement phase, sent electronically to its code compliance unit and the environmental consultant for approval before final payment, then as three bound, double-sided sets with one kept for the facility. The list runs from every waste shipment record and record log, originals going to code compliance, through the OSHA compliance air monitoring records, the daily progress log with its entry and exit log, the landfill permit, and the notifications with every amendment in date order. It also wants a notarized statement naming every worker with a state certification number and certifying their medical exams, their fit tests for the respirators used on that project, and their training. The consultant files a closure report of its own, with visual inspections dated both by inspection and by sign-off on the supervisor's log, so the two get read side by side.

A shipment record counts in different units from the survey. Under 40 CFR 61.150(d)(1), a waste shipment record names the generator, the agency office that runs the asbestos program, the transporters, the disposal site and its operator, the date transported and an approximate quantity in cubic meters or cubic yards, and a copy travels with the load. North Carolina's form, DHHS 3787, comes in five copies, one of them for the state unit, and adds the permit number and NESHAP ID, codes for friable or non-friable waste and for drums, bags, dumpsters or trailers, a space for discrepancies, and a line where the landfill writes the total weight in tons. The survey and the notice gave amounts in linear and square feet. The draft sets all of them side by side as each record states them and never converts one to make another agree. The Dormitory Authority's own record log tracks each load by hauler, permit number, license plate, container size, disposal facility, and the dates it left, arrived and came back signed.

Some agencies want closing papers of their own. Forsyth County, North Carolina, uses the shipment record to report the completion of every asbestos removal permit it issues. Georgia's environmental division takes a completion notification as well as the project notice, and now accepts both only through its online system; its 2015 paper version asked for the completion date, the linear and square feet actually removed, the landfill and its permit number, the volume disposed, the container type and whether containers were labeled. Northern Illinois University's standard wants the shipment record, signed by the disposal site, back with its engineer within 10 working days of completion. The draft lists each of these with the due date the owner's or agency's own papers give.

Worker records run on federal clocks. OSHA's construction asbestos standard, 29 CFR 1926.1101, keeps exposure measurement records, with the number, duration and results of samples, for at least 30 years, medical surveillance records for the length of employment plus 30 years, and training records for a year past the last day of employment. Its competent person inspects Class I work at least once every shift, which is much of what fills a daily log. A closeout package draws on those same files, so the draft copies license numbers and medical and fit-test dates exactly as your records show them and marks any date that falls outside the project, without reading a medical finding or judging anyone fit for work.

Schools keep the package for years. Illinois's rule for abatement in public and private schools and commercial and public buildings, 77 Ill. Adm. Code 855.300, has a school district record, for each response action, the methods, location, reasons, start and completion dates, every contractor with its state license number, and the disposal site. For air samples taken at completion it wants the collector's name, signature and license number, the locations and date, the laboratory and its address, the date, method and results of analysis, the analyst's name and signature, and a statement on the laboratory's TEM accreditation, all kept for six years after removal in any area where the material is all gone. Your reviewer will check each of those against the outside report as issued, since the draft copies a result and never interprets it.

// What you send

Closed projects and the records behind them

Copies only
Personal details blacked out
01

20 to 30 closed projects

The closeout packages your office sent, with any comments or rejections the owner returned. Include a phased job, one that used a second landfill, and one where a shipment record came back late.

02

The field records behind each

Waste shipment records and record logs, daily and entry logs, crew rosters, the notices and amendments, and the air sample reports the outside lab or consultant issued.

03

Each owner's closeout list

The specification section or checklist that set the package's contents and order for each owner in the sample, even if it's a single page.

04

Blacked-out copies, NDA first

After the NDA is in place, remove workers' dates of birth, identification numbers and any medical details from the copies. Nobody from Massmarket logs in to an agency system or opens a live project file.

// Before it starts

Fixed before any record leaves your office

These are written down and signed off by your owner first.

Terms for the closeout testOwner signs off
Your reviewer
The owner's pick: usually the project manager who sends closeouts to owners
Success criteria
In writing: which items must be present, and how a mismatch is scored
The sample
Chosen by your reviewer, across owners, states and project sizes
Who decides
Licensed people only: every air result, every release, every signature
Price
A range for live closeouts, given before any record moves
NDA
Signed before the first field folder is copied

// How the test is judged

Every draft against the package the owner got

Item by item
Against what the owner received
On 20 to 30 closed projectsPackage your office sentTest draft
Items present, in the order the owner's list setsMarked on your closed projectsMarked on your closed projects
Shipment records matched to loads, quantities as writtenMarked on your closed projectsMarked on your closed projects
Transporter and landfill signatures on each recordMarked on your closed projectsMarked on your closed projects
Worker licenses, medical and fit-test dates as recordedMarked on your closed projectsMarked on your closed projects
Daily and entry logs covering every work dayMarked on your closed projectsMarked on your closed projects
Outside air reports listed as issued, never scoredMarked on your closed projectsMarked on your closed projects
Missing or mismatched items, each with its sourceMarked on your closed projectsMarked on your closed projects
Nothing filled in yet. Every cell waits for a project your own office has already closed.Only your reviewer decides the outcome.

// After a yes

A month of newly released projects

Once your reviewer says yes, the next projects your crews release go through the same assembly for about 30 days.

Every package waits for your project manager's check before an owner sees it, and sending it stays with your office.

Drafts on live projects are still compared with what your staff would have assembled. A further job only starts if you choose one, and it gets its own price.

// Possible next jobs

Jobs that could follow closeouts

Ranked possibilities
Each with its own price
  1. 01

    Demolition and renovation notifications

    The notice at the front of the same project, drafted from its survey report and job papers.

    Next
  2. 02

    Pre-work submittal packages

    The credentials, work plan and permits an owner's specification wants before setup, gathered from the same files.

    Then
  3. 03

    Abatement bid quantity sheets

    Amounts by material and work area pulled from a specification and survey for whoever prices the job.

    After that

// One hard limit

It builds the package. Results, releases and signatures stay with your people.

Copies are all the proof of concept ever uses. It never touches a regulator's portal, a live notification, a waste shipment record in use or an open project file. It never decides whether material is asbestos, judges an air sample result, clears or releases an area, or signs a form or certification. A licensed person on your staff makes every call, signs every record and sends the package. Requirements vary by state, county and owner; read nothing here as legal, health or engineering advice.

Priced per job. You get a range before the proof of concept and a fixed price before you sign.

Expect the range on the call; it rests on projects closed per month and the number of different owner closeout lists you work to.

// Questions

Closeout package questions

Will the AI decide whether an area passed clearance?
No. The draft lists each air sample report as the outside lab or consultant issued it, with its date and method. Whether an area passed, and when it is released, stays with the licensed people who make that call.
What if a shipment record never came back signed?
The draft marks that load as open and names the record it expected, taken from the record log or the notice. Chasing the transporter or landfill, and any report an agency requires, stays with your project manager.
Do you need our workers' medical files?
No. The test needs only names, license or certification numbers, and the dates your records show for exams and fit tests. Black out dates of birth, identification numbers and any medical finding before copying.
Our owners all want different packages. Is that a problem?
That variety is exactly what the sample should show. Send each owner's closeout list with its projects, and every draft follows the list it belongs to. A project with no written list gets your office's usual order, and the draft says so.
Does it work for phased projects?
Yes, if the records show the phases. Some owners want a package after every phase rather than once at the end, so the draft follows the phase dates in the notices and amendments.
Rob Eason

Rob Eason, founder

// Book a proof of concept call

Start from the packages you already sent.

Thirty minutes with Rob about the owners you close out to, your role, and about how many projects your office closes in a month. Hold on to the field records until the NDA is signed.

  • Co-owned a 60-employee financial services firm and sold his share to his partner.
  • Ran GOSO Technologies, a Boston solar company rated 5/5 across 24 Google reviews.
  • 5/5 across 83 reviews in HighLevel's Certified Admin Directory.
  • 4.3/5 from 6 Google reviews of Massmarket AI.
  • Every directory and Google review, critical ones included, is shown word for word at massmarket.ai/reviews.
  • Takes every proof-of-concept call himself.